Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Continuous Mining MachinesBy C. W. Fitzgerald
INTRODUCTION Continuous mining machines are used in regular flat ore beds having uniform thickness. Since coal is the most common type of material occurring in such beds, most continuous miners are
Jan 1, 1982
-
Practical Performance Requirements Of Coal Dryer Dust CollectorsBy Henning E. Soderberg
Yesterday, air pollution was somebody else's problem -- today, it is everybody's problem. The coal industry with thermal coal drying, is aware of their problem and the necessity of doing an
Jan 1, 1962
-
An Improved Process For Making Prereduced Iron Ore PelletsBy M. M. Fine
One of the most persistent topics at technical gatherings and in the recent scientific press has been the reduction of iron ore. To cite some of them, in May 1960, a symposium on the subject was spons
Jan 1, 1968
-
Characteristics Of Attached Radon-222 Daughters Under Both Laboratory And Underground Uranium Mine EnvironmentsBy J. A. Cooper, M. R. Petersen, P. O. Jackson, J. C. Langford
The organic, inorganic, and radiological characteristics of airborne aerosols have been measured as a function of particle size in controlled atmosphere test chambers and operating uranium mines. Conc
Jan 1, 1981
-
Accurate FEM Simulation of the Fragmentation Process in Rock CuttingBy Maria C. Jaime
Optimization of the rock cutting performance plays a major role in the tunneling operation. For a given set of tool and cutting environment, rock fragments may be chipped away in numerous manners and
Jan 1, 2010
-
An Industrial Coal-Fired Fluidized Bed Combustion System Using Dolomite Limestone For Sulfur Emission ControlBy J. Leonard Frame
A coal-fired fluidized bed combustion (FBC) system will be installed at the Owatonna Tool Company, Owatonna, Minnesota. Two FBC combustors will burn solid fuels: coal, petroleum coke, and wood and pap
Jan 1, 1978
-
Void Prediction In Mine Roof Geology Information System (MRGIS)By D. X. Tang, G. Wilson, Y. Luo, S. S. Peng
Knowing the location of voids/fractures in roof rock will be greatly helpful for roof support design. The drilling parameters obtained during normal roof bolt installation cycle provide a fast and eco
Jan 1, 2004
-
The Time Aspect Of The Optimum Long-Term Open Pit Production SequencingBy Rossen Halatchev
The production sequence optimization of open pit mine is a procedure that reflects the exploitation conditions over life of mine. These conditions are determined by the geological characteristics of t
Jan 1, 2002
-
Ground Control At The Climax Mine ? IntroductionBy George R. Stephans
The Climax Mine is a panel caving mine which has had a long history of incidents of severe ground control problems. The nature of the ore deposit, which lends itself to the caving meth- of of producti
Jan 1, 1982
-
Electrochemistry of sulfide mineral flotationBy S. Chander
The use of various electrochemical techniques to study mechanisms of sulfide mineral- flotation reagent interactions is briefly reviewed in this paper. Prior to such studies it is desirable to thermod
Jan 1, 1987
-
Optimal Sizing Of Raise Bored Ventilation ShaftsBy Nelson M. Solow
Raise boring of mine ventilation shafts in many cases offers a lower cost and higher speed method of construction in comparison to conventional shaft sinking. Where underground access is available for
Jan 1, 1977
-
Underpinning and Instrumentation—Temporary Structures for Critical SolutionsBy Jon “Ike” Isaacson, Frank Perrone, Eric Prantil
"Tunneling through an urban environment carries many inherent risks to the immediate local infrastructure and subsequently to the project stakeholders. On the CQ031 Contract of the East Side Access Pr
Jan 1, 2016
-
Corrosion and Leakage Remediation for WMATA Yellow Line Steel Tunnels - RETC2023By Tatiana Kotrikova, Steven Kolarz, Alan Kolodne, James Parkes, Matthew Goff
The WMATA Yellow Line is the section of steel segmentally lined tunnels that have experienced leakage and significant corrosion in isolated areas. A three part rehabilitation design has been developed
Jun 13, 2023
-
Deep Leg Flotation CellBy C. A. Hollingsworth
The Deep Leg Flotation Cell was developed to solve a problem which confronted the Smith-Douglass Company on moving from one mining area to another. Poor recovery and, to some extent, inferior concentr
Jan 1, 1964
-
In-Situ Testing Of Roofex Yielding Rock Bolts In Coal RibsBy Sean Harvey
One of the manifestations of the dynamically induced failures in deep coal mines is the violent ejection of coal from the ribs. A possible protection against such failures is the use of a specificall
Jan 1, 2009
-
Cost And Sensitivities Analysis Of Uranium In Situ Mining ? IntroductionBy George W. Toth
In a recently completed research project for the U.S. Bureau of Mines - Twin Cities Research Center, a computerized costing procedure for uranium in situ leach mining was developed by the NUS Corporat
Jan 1, 1981
-
Foremen?s Incentive PlanBy Arthur E. Belton
Ever since the industrial Revolution both major and small companies have put much emphasis on the use of incentives to compensate top management for extra effort and extra skill. For many years indust
Jan 1, 1960
-
Update Of The Hanna Groveland PlantBy W. C. Dailey
The Groveland Mine. Concentrator and Pellet Plant are located in Dickinson County in the Upper Peninsula of Michigan. The construction of the Groveland Mine in 1959 was the first United States operati
Jan 1, 1978
-
Effect Of NaCl On Coal FlotationThe floatability of a bituminous coal in NaG solutions was evaluated using a modified Hallimond tube to delineate the role of the electrostatic interaction between bubbles and particles in determining
Jan 1, 1992
-
Bioleaching Process For Bougainville Copper LimitedBy Kevork Chouzadjian, Gary Davis, Nicholas Katsikaros, Bruce Kelley, Mellie Mavatoi
A process has been developed to recover gold and copper from two waste materials at the Bougainville Copper Limited mine in Papua New Guinea. It involves the bioleaching, in reactors, of a pyrite conc
Jan 1, 1990