Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
New Expectations of the Mining IndustryBy Andrew Howard
As the mining industry moves further into developing countries in search of new resources, its role in international development is coming under increasing scrutiny. This is a trend that is likely to
Jan 1, 2006
-
Noranda’s Exploration StrategyBy D. L. Stevens
Following an in-depth scenario and strategic planning exercise in 1997, Noranda’s mine production goal was set at 500,000tonnes per year of both copper and zinc metal within five years. There had been
Jan 1, 1999
-
The Use Of Positron Emission Particle Tracking For Investigation Of The Media Flow Patterns In Vertical Stirred Media Mills - Preprint 09-089By R. Tamblyn
Vertically stirred media mills are a highly effective low-footprint solution for the ultrafine grinding of industrial minerals. This work investigates the effect of media density on flow patterns with
Jan 1, 2009
-
Success By Systematic Safety: Risk Management Orientated Concepts For Small And Medium Size Mine Operations - Mining ? A Risky Business?By J. Kretschmann
?We have constructed a world in which the potential for high-tech catastrophe is embedded in the fabric of day-to-day life.? (Malcolm Gladwell) The mining industry is a crucial provider for virtua
Jan 1, 2011
-
Legislative Action Important: Key Message at - SME Annual Meeting 2022By Steve Kral
The mining industry has waited a long time for the resurgence in commodity prices and demand for its products that it is now experiencing. Base and precious metals prices have reached levels not seen
Jan 1, 2005
-
Inertization as Means for Reducing Down Time and the Explosion Risk in Cases of Spontaneous CombustionBy Walter Hermülheim, Klaus-Dieter Beck
In German hardcoal mining approximately 1 or 2 cases of spontaneous combustion are recorded per 10 million tonnes of saleable output. In approximately every 20th spontaneous combustion case, CH, is ig
Jan 1, 1997
-
Design/Build Agreement For The Niagara Tunnel ProjectBy Russel Delmar, Rick Everdell, Harry Charalambu, John Tait
Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam
Jan 1, 2007
-
TARP — The Des Plaines Tunnel System (North Leg) A Case HistoryBy Robert Rautenberg, Paul McDermott
This paper will discuss the construction of 15.9 km (9.88 mi) of tunnels on a project in Chicago, Illinois. The tunnels were driven utilizing two rock and four soft ground TBMs ranging in sizes from 7
Jan 1, 1997
-
Equilibrium Adsorption Studies Of Polysaccharides On Talc: The Effect Of Molecular Weight, Charge, And The Influence Of Metal CationsBy P. Harris, G. Groenmeyer, L. Parolis
The effect of molecular weight, charge and the presence of the cations Ca2+, Mg2+and K+ on the adsorption of carboxymethyl cellulose on pure talc obtained from Balmat, New York have been investigated.
Jan 1, 2004
-
Field Data Collection: Techniques And ApplicationsBy M. Maier
Geographic Information Systems (GIS) has evolved into a powerful tool for analyzing spatial and attribute data in many industries including mining. Modern field data collection techniques add another
Jan 1, 2001
-
New Mexico Program Introduces Native American Students to MiningBy John R. Sturgul, Elizabeth Yost
The number of Native Americans presently working as mining engineers is extremely low-perhaps three in the entire US. At the New Mexico Institute of Mining and Technology, it was felt that introducing
Jan 7, 1981
-
A Small Diameter Shaft Design AlternativeBy Brian E. Gombos
During early stages of the detailed design for Detroit?s Upper Rouge CSO Tunnel Project, a Value Engineering Recommendation suggested the design team investigate alternative concepts to the usual cast
-
Thermodynamic Optimization Of Hydrogen Production For A Coal Based Power Plant With Zero EmissionsBy Tuncel M. Yegulalp, Anuta Belova
This paper expands on the ZECA (Zero Emission Coal Alliance) technology, which is aimed at making coal a sustainable source of clean energy in the near future. The technology proposed immediate captu
Jan 1, 2005
-
Large-Diameter Tunneling Collapses: Recovery Design and ExecutionBy Bradford F. Townsend
A study was made on six collapses that occurred during large-diameter tunnelling through weak sedimentary rocks and soil using SES methods in three stages?top heading, bench and invert. The collapsed
Jan 1, 2008
-
Bagdad Concentrator Process Control UpdateBy Peter Amelunxen, Craig Lockhart
Significant effort was made in 2003 and 2004 to upgrade the existing instrumentation and process control infrastructure at the Phelps Dodge Bagdad copper concentrator. Specifically, • cameras were
Jan 1, 2005
-
Gas Mitigation In The Mill Creek TunnelBy R. Switalski, M. Schafer, R. Pintabona, M. Kritzer, B. Lukajic, S. Janosko
Methane gas caused an eight-month shutdown of mining operations at the Mill Creek, Phase 3, Tunnel. The gas-related shutdown occurred as the tunnel was advanced to an approximate distance of 2,700 fee
Jan 1, 2007
-
Problems with determining oxygen deficiencies for use in ratios used for assessing spontaneous combustion activitySeveral common ratios used for determining spontaneous combustion activity rely on comparing the amount of various products of oxidation with the amount of oxygen consumed to produce these products. A
Jan 1, 2009
-
Use of baseline personal DPM exposure data for mine ventilation planning- A South African JourneyBy B. K. Belle
The use of diesel engine locomotives in South African mines can be traced to Van Dyk Consolidated Mines Ltd on the Witwatersrand gold mines in 1928 as a replacement for battery locomotives. The advant
Jan 1, 2009
-
The Ivar Project - An Uncommon, Everyday TBM TunnelBy Yngve Jordal, Sverker Hartwig
The IVAR Project is Norway's largest sewer project presently under construction. One part of it is an 8.1 km (26 575 ft) long, 3.5 m (11 ft 6 in.) diam tunnel, bored in one year. The tunneling pr
Jan 1, 1991
-
A Discussion On TBM Cutter Change Time And Cutter LifeBy E. Farrokh
Estimation of the cutter life and cost is a part of evaluating performance for a hard rock TBM in any project. Various approaches has been proposed for calculation of disc cutter life in various rock
Feb 27, 2013