Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Double Shield TBM In Challenging, Difficult Ground Conditions?A Case Study From Zagros Long Water Transfer Tunnel, IranBy Jafar Khademi Hamidi
The Zagros long tunnel is one of the main components of Sirvan water transfer project in western Iran. It is approximately 48 km in length and consisted of two lots. The second 26 km lot of this tunne
-
National Mining Hall of Fame to Induct SevenSeven legendary figures of American mining will be enshrined in the National Mining Hall of Fame in ceremonies on Saturday, Sept. 7 at the Little America Hotel in Salt Lake City, UT. The 15th annu
Jan 1, 2002
-
Moving Forward on New York’s Second Avenue SubwayBy David Caiden, Geoffrey Fosbrook, Jaidev Sankar, Donald Phillips, Jon Hurt, Anil Parikh
This paper will cover the progress being made on Phase 1 of New York’s Second Avenue Subway line. It will include a description of construction progress on the first contract to be let, which consists
Jan 1, 2007
-
Putting Computational Fluid Dynamics To Work On Mining And Metals ProjectsBy D. M. Lane, J. M. Berkoe
Engineers and Owners share a common desire to build reliable, efficient plants on schedule at reasonable costs. This paper describes one tool that Bechtel finds can integrate these objectives by “pu
Jan 1, 2000
-
Developing Gold Fields’ La Cima Cerro Corona Project in PeruBy Richard W. Graeme, James J. Komadina
Gold Fields acquired an option to purchase the Cerro Corona project, located in Hualgayoc, Cajamarca Department, Peru, in December 2003. In January 2006, the option was taken up and the transaction c
Jan 1, 2007
-
Reduction or Elimination of Abrasion, Wear, and Corrosion in Backfill EquipmentBy Franz Albert Nonnen
Backfill systems have been used for as long as mining activities have existed. Various backfill methods have been developed over the centuries with consideration for geological necessities, the techni
Jan 1, 2001
-
An Approach to the Classification of Weak Rock for Tunnel ProjectsBy Steve Klein
Weak rock is an important consideration in tunnel design and construction due to the difficult ground conditions that are often encountered. Nevertheless, when conditions are favorable high advance ra
Jan 1, 2001
-
Take Adequate Measures to Ensure Good BidsBy David D. DiPonio, John DiPonio, Roger Van Omen
The greatest opportunity to attain the most favorable prices for underground construction projects occurs during the competitive bidding period. The Owner, Engineer, and Contractor need to have a thor
Jan 1, 2005
-
Molecular Gate® Adsorption System For The Removal Of Carbon Dioxide And / Or Nitrogen From Coalbed And Coal Mine MethaneBy Micheal Mitariten
The recovery of natural gas (primarily methane) from coalbed deposits is an established and growing source for the U.S and accounts for over 7% of its total production. The gas from on-purpose degass
Jan 1, 2005
-
Boggo Road Busway Project, Brisbane, AustraliaBy Ted Nye
This paper describes a number of aspects of the design and construction of a driven tunnel which forms part of the Boggo Road Busway project. The driven tunnel is 430m long with an excavated width of
-
The Dulles Corridor Metrorail Project—Extension to Dulles International Airport and Its Tunneling AspectsBy V. Gall, J. Rudolf
The Virginia Department of Rail and Public Transportation and the Metropolitan Washington Airports Authority are undertaking the extension of Washington Metropolitan Area Transit Authority’s Metrorail
Jan 1, 2007
-
Characterizing Rare Earth Elements in Alaskan Coal and AshBy V. K. Srivastava, T. Gupta, T. Ghosh
"In recent years, the demand for rare earth elements (REEs) has grown due to increasing demand and global supply shortage. The supply deficit of these critical elements has encouraged the search for n
Jan 1, 2017
-
Minerals Industry Salary SurveyIn its April 1991 issue, MINING ENGINEERING published a salary survey form asking for information relating to engineering and management jobs in the minerals industry. 1038 of these forms were filled
Jan 1, 1992
-
Preparation Of Environmental Impact Study (EIS) And Environmental Adjustment And Management Program (PAMA) Guidance Documents For Peru's Ministry Of Energy And MinesBy R. L. Kloberdanz
Peruvian legislation requires the preparation of an Environmental Impact Study (EIS) for new and expanding mines/beneficiation facilities and the preparation and implementation of an Environmental Adj
Jan 1, 1998
-
Whither Mining Engineering Education?By J. J. K. Daemen
Mining Engineering education is in trouble, if not in crisis. The most visible signs are the decrease in the number of programs that offer the degree, and the continued difficulties in attracting stud
Jan 1, 2004
-
Using Metafora To Evaluate The Transport System In A Swedish Open Pit Mine.By Bo Forsman
METAFORA is a simulation model for determination and evaluation of strategies for operating loader/truck systems in mining. A specific version of METAFORA was used to evaluate the haulage system at So
Jan 1, 1992
-
Plant-Site Evaluations Of The OPSA System For On-Line Particle Size Measurement From Moving Belt ConveyorsBy Y. K. Yen, J. D. Miller, C. L. Lin
The image-based On-line Particle Size Analyzer (OPSA)system has been developed at the University of Utah to measure particle size distributions under plant conditions where overlapped and segregated p
Jan 1, 1999
-
Microtunnels vs. EPB Risk-Based SelectionBy Michelle L. Ramos
INTRODUCTION The Ballard Siphon was built in 1935 and consists of two 91.4 cm (36-inch) diameter wood-stave pipes. These pipes convey sewer flowsunder the Ship Canal from northwest Seattle and the Ba
-
Geotechnical Considerations for the Final Design of the Detroit Upper Rouge Tunnel CSO ProjectBy Jean Habimana
The Detroit Upper Rouge Tunnel CSO Control Project will capture and store up to 201 MG of combined sewer overflow from 28 outfalls in Detroit, Dearborn Heights and Redford Township during wet-weather
Jan 1, 2008
-
General conditions for sustainable coal use in GermanyBy F. -J. Wodopia
Sustainability of energy supplies has been an issue of general interest for a long time. Whilst in the past the continuous productive use of natural commodities was in the fore, its compatibility with
Jan 1, 2011