Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Ground Freezing with Liquid Nitrogen for TBM Cutterhead Maintenance - NAT2024By Joseph Sopko, Xavier Lacourse-Dontigny
For the REM (Réseau Express Métropolitain) project, a 2500 m tunnel was built using a tunnel boring machine (TBM) under the Montreal Pierre Elliott Trudeau Airport (ADM). Although the geology under th
Jun 23, 2024
-
NIOSH Gas Well Stability Research: Investigation into the Causes of an Anomalous Shale Gas Well Casing Deformation at a Deep Longwall Mine - SME Annual Meeting 2024By Peter Zhang, Daniel Su
Following the first longwall excavation at a deep-cover gas well site, the pre-mining modeling prediction of longwallinduced casing deformations in the fully cemented production casing were in excelle
Feb 1, 2024
-
Enhanced Probe Drilling and Pre-Grouting Design and Recommendations on Hard Rock TBMs - RETC2023By Stryker Magnuson
While probe drills are not strictly necessary for all projects, the incorporation and use of probe drills and pre-grouting adds capability and insurance to boring operations. Water ingress and unstabl
Jun 13, 2023
-
GOB Ventilation And Bleeder Systems In U.S. Coal Mines (1bc7ffd0-b429-4955-87e5-82241f8281f1)By J. E. Urosek
The Mine safety and Health Administration (MSHA) formed the Mine Ventilation Bleeder and Gob Training Committee in 1993. This committee was charged with developing a training course designed to enhanc
Jan 1, 1995
-
Challenges of Large Diameter Blind Drilling and Lining in Fractured GroundBy C. Ernst
The underground operation at Barrick?s Cortez Mine, located near Elko, NV, required the construction of a 12 foot diameter smooth-lined ventilation shaft. Barrick preferred to mechanically excavate fr
Feb 23, 2014
-
Fate And Transport Of Metals From Flood-Deposited Mining Wastes Along The Clark Fork RiverBy W. M. Schafer
The risk that water quality will be degraded by mining activity can be evaluated using risk analysis techniques. Water quality impacts can occur where water-rock interactions with tailings, waste rock
Jan 1, 1998
-
Experimental Investigation on the Static Shear Stiffness of an Immersion JointBy Yong Yuan, Wenhao Xiao, Luc Taerwe
"The static shear stiffness of an immersion joint subjected to combined compression and shear forces is investigated by experiments in a test set-up. To explore the performance of the immersion joint,
Jan 1, 2016
-
Connecting Three Pump Stations, with Tunnels, on an Island, in Charleston, SC - NAT2022By Justin Kolster, Donald Benjamin, Kyle White
Expansion of the Plum Island Wastewater Treatment Plant requires interconnection of three operating pump stations using only two existing 10-ft diameter shafts for access. These two existing shafts re
Dec 1, 2022
-
TBM Excavation Through Pre-Existing Tie-Backs—Ship Canal Water Quality Project (SCWQP) - NAT2024By Francesco Chiappalone, Franco Gasperin, Fabrizio Fara
This document describes the challenging task of mining through tiebacks using a 21'-8" diameter Tunnel Boring Machine (TBM) as part of the Ship Canal Water Quality Project. The mining operation involv
Jun 23, 2024
-
A field trial of distributed optic fiber sensing technique for longwall caving mapping - RASIM 2022By Xun Luo, Yi Duan
A field trial of by distributed optical fiber sensing (DOFS) technique was conducted at a longwall coal mine in Australia. This investigation was designed to assess the applicability of DOFS for micro
Apr 26, 2022
-
Experiences with Spray Applied Waterproofing Membranes - Experiences and investigations with a EVA based membrane in a tunnel environmentBy Karl Gunnar Holter, Frank Clement
"INTRODUCTION Typically waterproofing of conventionally excavated tunnels has been done by installing pre-fabricated sheet membranes between the primary temporary support lining and the secondary perm
Jan 1, 2016
-
Secondary Support Instrumentation in Longwall Ventilation EntriesBy Erik Westman, Benjamin Mirabile
"Ongoing research is being conducted to evaluate secondary support performance in longwall ventilation entries. In a three-entry longwall gateroad, secondary supports are applied in the #2 entry to ma
Jan 1, 2019
-
A Case Study: Successfully Managing Excessive and Rapid Slope Deformation in an Open Pit Mine Utilizing Slope Monitoring Radar Systems - SME Annual Meeting 2024By Justine Ealy, Daniel Yang, Christina Foster
Maintaining stable high walls can be a challenging task. Complex geological and structural features, alteration zones, rock mass properties, and hydrogeological conditions must be well understood to d
Feb 1, 2024
-
Design Considerations for Main Surface Fan InstallationBy A. D. S. Gillies, A. Haghighat
"A study has been undertaken at the Missouri University of Science and Technology (MS&T) limestone Experimental Mine to determine new fans set up and wiring options.to install additional mine ventilat
Jan 1, 2015
-
Underwater Tunnel Repair with Stainless Steel Segmental Liner - NAT2022By Matthew Goff, Russell Lutch
The Great Lakes Water Authority (GLWA) operates the largest regional water authority in the State of Michigan. Two of the tunnels supplying raw water to the system from the Detroit River are the Sprin
Dec 1, 2022
-
Tunnel Condition Assessment: State of the Practice - RETC2023By Ali Hafiz, Aidin Golrokh, Tom Iseley, Kaz Tabrizi, Saleh Behbahani
In the USA many highway tunnels were built during the 1930s through 1960s. This indicates that these tunnels have exceeded their intended design service life. Based on the initial tunnel inventory con
Jun 13, 2023
-
Hydrogeologic Characterization of Bedrock Units for Mining and Environmental Purposes Using Downhole Geophysical Logging TechnologyBy Nathan Painter, Kevin Andrews, Andrew Karpa
Groundwater flow in bedrock units is an important factor to be considered for most mining situations, both underground and open pit excavations. Characterization of the hydrogeologic system into which
-
The Light at the End of a 40 Year Old Tunnel - Retrofitting of an Existing Tunnel as part of The New Second Ave Subway Project, New YorkBy Richard Giffen, Michael Trabold, Pablo Lemus
"As part of the new 2nd Ave Subway Project, an existing tunnel constructed in the 1970’s will be connected to the new subway and used as new running tunnels. The existing tunnel had to be modified to
Jan 1, 2016
-
DC Water First Street Tunnel – Integrated Engineering and ConstructionBy Stephen Njoloma, Ivan Hee, Ravi Jain, Mina Shinouda
"INTRODUCTION DC Water’s First Street Tunnel (FST) is comprised of a collaborative effort between DC Water, DC Water’s Project Consultants Organization (PCO) led by Greeley & Hansen and McMillen Jacob
Jan 1, 2016
-
Effects Of Increased Mechanization On Drill And Blast & NATM Tunneling Production Rates And Safety (1994 ? 2009)By B. Briggs
Over the past 15 years, the tunneling industry has pushed towards a higher degree of mechanization in nearly every phase of construction. The overall objective of the mechanization was to increase pr
Jan 1, 2010