Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    TBM Rescue Shaft, Tunnel, and Relaunch in Karst Conditions - NAT2024

    By Dan Swidrak, Bill Zietlow

    Halfway through a 17,770-ft long stormwater tunnel, an 11-ft diameter TBM encountered a karst void below the Mississippi River in Missouri, resulting in significant inflow. It was decided that the TB

    Jun 23, 2024

  • SME
    The Musaimeer Outfall Tunnel - Venturing into Uncharted Territory of Sub-Sea Sabkha Deposits

    By Mike Hall, Tim Kelly, Mohammad Reza Jafari, Ulf Georg Gwildis

    "Qatar’s capital Doha is undergoing major infrastructure improvements including a multiphase stormwater management program. Although located in an arid climate, Doha experiences flooding during rainfa

    Jan 1, 2016

  • SME
    Recent Trends in Conventional Tunneling (SEM/NATM) in the US

    By Nasri Munfah, Steffen Matthei, Vojtech Gall

    "Conventional tunneling as defined by ITA WG19 is also known as the New Austrian Tunneling Method (NATM) or Sequential Excavation Method (SEM) was transformed in the US to deal with challenging tunnel

    Jan 1, 2016

  • SME
    4.3 Production Scheduling - 1. Technical Overview - Introduction

    In the hierarchy of performing mine planning tasks, production scheduling is naturally at the bottom. Yet good production scheduling is probably the most demanding and difficult task to achieve for va

    Jan 1, 1979

  • SME
    New Solutions Applied to Usual Tunnelling Operations: Crossrail C305

    By Juan Ares, Enrique Fernández, Alejandro Sanz, Francisco González

    "INTRODUCTION Crossrail is a subsidiary company of Transport for London created for the construction of a new transverse train line 118 km long between Maidenhead and Heathrow in the West, and Shenfie

    Jan 1, 2016

  • SME
    Lifetime of Polyethylene Geomembranes for Water Proofing of Tunnels

    By Gerald Pinter, David Nitsche, Márton Bredács, Markus Haager, Andreas Frank

    "The reliable prediction of service lifetime of tunnel constructions is of essential technical and economic interest. Polymers used for tunnel liners have to fulfill the requirement of 100 years lifet

    Jan 1, 2016

  • SME
    Reinforced Concrete Seal Design For 120 Psi Design Standard ? Numerical Approach

    By R. R. Kallu

    The current 120 psi seal design and evaluation practices are mostly based on simple analytical solutions. Considering the simplistic assumptions and limitations involved in simple analytical solutions

    Jan 1, 2010

  • SME
    Implementation of Pastefill at the Barrick Goldstrike Mine

    By G. Chancellor

    "INTRODUCTION The paste plant is located at the Barrick Goldstrike mine in Northern Nevada on the Carlin Trend. The Goldstrike property consists of an open pit and an underground mine; along with two

    Jan 1, 2015

  • SME
    Effect of Casing Cementing Alternative on Shale Gas Well Casing Deformations Induced by Longwall Mining

    By Peter Zhang, Daniel Su, Bo Hyun Kim

    Shale gas wells drilled in longwall chain pillars are influenced by longwall mining. Longwall mining on each side of the chain pillars can create overburden movements and induce deformations in gas we

    Jul 1, 2023

  • SME
    Grinding Improvements at Mineral Park

    By J. T. Winkelmann

    The Mineral Park Mine is an open pit copper-molybdenum mine located in northwestern Arizona, approximately twenty miles northwest of Kingman, Arizona. The concentrating facility has been regarded, wi

    Feb 23, 2014

  • SME
    Selection and Application of Cutoff Grades in Underground Mine Planning—Practical Application - SME Annual Meeting 2024

    By Paul Schmidt, John Barber

    This paper discusses the determination of cutoff grade (COG), including all revenue and cost factors and how to apply the COG in the world of engineering studies and mine planning for underground mine

    Feb 1, 2024

  • SME
    Chicago TARP McCook Main Tunnel - World’s Largest Live Tunnel Connection is Underway at Chicago’s Tunnel and Reservoir Plan (TARP)

    By Faruk Oksuz, Dave Schiemann, Matt Trotter, Mike Padilla, Miguel Sanchez, Carmen Scalise

    "Chicago’s Tunnel and Reservoir Plan (TARP) is a nearly $4.0 billion and over 30 years long program and arguably the largest and longest combined sewer tunnel and reservoir system in the world. Recent

    Jan 1, 2016

  • SME
    Overcoming Challenges in Tunneling for Albany’s Beaver Creek Clean River Project, Albany, New York - NAT2022

    By Jerry Wang, Greg Bold, Mahmood Khwaja, Rebecca Caldon, William Simcoe

    Phase III and Phase IV of the Beaver Creek Clean River Project, Albany, NY, includes microtunnel construction of 2,320 feet of 48-inch/36-inch internal diameter (ID) conveyance pipe and a 525 foot lon

    Dec 1, 2022

  • SME
    Chemical Enhancement of Sub-20 Micron Particle Recovery—4 Case Studies - SME Annual Meeting 2026

    By Lance Kolbush, Alex Vaughn, James Fisher, Michael Barish, Tony Toney

    Somerset International has worked to enhance the recovery of sub-20 micron particles in our patented Sub325 Systems by introducing chemicals in the systems prior to the centrifuge. This paper details

    Feb 22, 2026

  • SME
    Preventive Support Maintenance (PSM) as a Mitigation of Rockburst Hazard: A Case Study for The Deep Mill Level Zone Mine

    By M Ali, E Satriawan, M Napitupulu, A Munandar

    The Deep Mill Level Zone (DMLZ) panel cave mine is one of three active caving mines at PT Freeport Indonesia’s Grasberg Underground Mining Complex. The DMLZ mine is located at a depth of approximately

    Apr 26, 2022

  • SME
    Rock Tunnels at High Water Pressure: Non-Continuous Pressurized TBMs Versus Slurry - RETC2021

    By Brad Grothen, Lok Home

    The choice of TBM type is never easy, but it becomes especially challenging when faced with a hard rock tunnel with expected high water flows and pressure. Slurry Shield tunneling has a long history o

    Jun 13, 2021

  • SME
    Prediction of Dynamic Subsidence in the Proximity of Longwall Panel Boundaries:Influence of the Edge Effect Offset

    By Ernesto Maldonado, Zach Agioutantis, Jesus Romero

    Reliable prediction of dynamic deformations is important when planning to undermine important structures that cannot tolerate large relative deformations and or large horizontal strains. This paper pr

    Jul 1, 2023

  • SME
    Determination of the Fire Hazards of Mine Materials Using a Radiant Panel

    By R. A. Thomas, C. D. Litton

    "The objective of this study was to develop a laboratory-scale method to rank the ignition and fire hazards of commonly used underground mine materials and to eliminate the need for expensive large-sc

    Jan 1, 2015

  • SME
    Separating Underground Metro Lines under Operation in Baku

    By Elena Chiriotti, Federico Valdemarin, Jan Cenek

    "SUMMARY The “28 May Station” is the only transfer station between the existing Green and Red metro lines in Baku. As part of the huge development strategy of the metro network, the complete separatio

    Jan 1, 2016

  • SME
    Design and Construction Challenges for the North Temple Tunnel - NAT2022

    By Todd Kilduff, Michael Tinney

    The North Temple Tunnel pedestrian underpass in Salt Lake City, UT was built using a pipe canopy method that met significant challenges in potentially running ground conditions. Kilduff Underground En

    Dec 1, 2022