Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Effect on the Production of Bantu, Engaged on Tram-Shovelling, of Different Temperature ConditonsBy J. H. Viljoen, J. F. Morrison, C. H. Wyndham
SYNOPSIS Heart rates, oral temperatures, shovels/min and number of 3/4 ton cars/hour trammed over distances of up to 350 ft were measured in samples of 6-10 miners, engaged in tram-shovelling, at 76°
-
Colloquium And General MeetingBy P. W. J. van Rensburg
COLLOQUIUM AND GENERAL MEETING A General Meeting and Colloquium on comminution was held on March 13th, 1974, at Kelvin House, Johannesburg. Mr P. W. J. van Rensburg (President) was in the chair. The C
Jan 5, 1974
-
Chemical and phase chemical characterisation of three different tap-hole clays, I.C. Thobadi, M. Mnisi, J.D. Steenkamp, E Matinde, W. ClarkBy E Matinde, M. Mnisi, I. C. Thobadi, W. Clark, J. D. Steenkamp
Pyrometallurgical smelters utilise tap-holes, through which liquid metal, matte and/or slag are tapped at regular intervals. However, tap-hole failures can have a devastating impact on smelters, which
Jan 1, 2020
-
Recovery Of Zircon From Sattankulam Deposit In India - Problems And ProspectsBy S. Asokan, Ch. V. G. K. Murty, R. Upadhyay
Zircon (ZrSiO4) is the most frequently found zirconium ore occurring in heavy mineral sands, from which it is extracted as a co-product in the production of ilmenite and rutile. Estimated world reserv
Jan 1, 2007
-
Liner Optimisation To Improve Availability Of The Ridgeway SAG Mill (ce87862d-0ddc-4fb1-a4ed-b071f2daa7ac)Mill relining is a major contributor to overall plant downtime. Reducing the number of mill liner pieces removed from and replaced in the mill has a direct impact on the overall reline time and in tur
Jan 1, 2007
-
Using post-leach analyses to inform improved co-disposal strategies for long-term acid rock drainage prevention, N. Maliela, D. Mjonono, S.T.L. Harrison, and A. KotsiopoulosBy D. Mjonono, S. T. L. Harrison, N. Maliela, A. Kotsiopoulos
The improvement of coal waste management practices, through the co-disposal of waste rock with sulphur-lean fine waste tailings (<1 mm in size), can potentially mitigate acid rock drainage (ARD). On e
Jan 1, 2020
-
Book reviewsAlexander Sutulov. Mineria Ghilena 1545-1975 (Mining in Chile 1545-1975). Santiago, Centre of Investigation of Mining and Metallurgy, 260 pp. (In Spanish). G. B. Rothenburg. Speciality steels. D.S.A.,
Jan 1, 1977
-
Book News1. New Publications Tin and its uses no. 140. Greenford (England), International Tin Research Institute, 1984. Catalogue. English translations of German standards 1984. Berlin, Beuth Verlag GmbH, 1984
Jan 1, 1984
-
Book news1. Recent publications Canadian minerals yearbook 1986. Review and outlook. Mineral Report 35. Available from Printing and Publishing, Supply and Services Canada, Hull, Quebec KIAOS9, Canada. $44.70.
Jan 1, 1988
-
Blast Fragmentation Optimization At Tarkwa Gold Mine Using 6 Sigma Methodologies (eb3a89f0-790c-4421-b609-1441478ffc19)By Alexandra Amiel
Tarkwa Gold Mine is owned by Gold Fields Ghana, IAMGOLD and the Government of the Republic of Ghana in a 71%, 19% and 10% ratio. The mine is operated by Gold Fields Ghana. This large, low-grade, open
Jan 1, 2008
-
Optimization of Fe-Al bimetal preparation for mercury sequestration from gold processing waste solutions, E. Aghaei, R.D. Alorro, and B. TadesseBy R. D. Alorro, B. Tadesse, E. Aghaei
Cinnabar (HgS) and native mercury (Hg) are the most common naturally occurring forms of mercury found in most gold ores subsequently released into the environment during processing. Mercury and its co
Jan 1, 2020
-
The Loco Drill And Its Application To Flat End DevelopmentBy K. Moxham, B. McKeown
The South African gold and platinum deposits were formed in very different ways and yet both have many similarities. They are flat dipping tabular orebodies, extremely narrow and located in hard abras
Jan 1, 2006
-
Water requirements for the recovery of diamonds using grease technology - SynopsisBy J. Danoczi
South Africa is running out of fresh water and is looking at ways to improve water usage. This report addresses how a diamond mine in Gauteng has improved the utilization of its water resources. In t
Jan 1, 2008
-
Increasing Capacities By Retrofitting Mist EliminatorsBy S. A. Ziebold
There is often a need to increase capacity through existing mist eliminator installations without significant tower modifications. Often there is not enough extra space outside existing vessels unless
Jan 1, 2007
-
Implementation Of The First Commercial Scale DC Smelter For Ferronickel Production From Low Grade Laterite Ores?Technology Building Blocks And Lessens Learned - SynopsisBy C. P. Naudé
Mechel, a large, integrated steel, stainless steel, and ferroalloy producer in Russia is committed to upgrading its facilities to world class pyrometallurgical process and environmental practice. Yuzh
Jan 1, 2010
-
A new approach to mine accident analysis: a case study of a mine cave-in - SynopsisBy D. E. Sweeney
In May of 1980, a mine operated by Belmoral Mines Ltd experienced a failed crown pillar, resulting in the death of eight miners and putting sixteen others in harm?s way. The Ferderber mine was located
Jan 1, 2007
-
Part 1: Understanding the components of the fundamental sampling error: a key to good sampling practice - SynopsisThe variety and sources of sampling errors have been studied since the late 1800s, but the pioneering work of Pierre Gy in the 1950s provided insights into sampling as an error generating process. Tot
Jan 1, 2007
-
Addressing the envelope ? SynopsisBy P. Hand
Most coal plants must run under conditions of varying feed conditions or are asked to produce qualities different from that used in the design. This can cause overloaded conditions as the ?bottlenecks
Jan 1, 2010
-
Low Cost Ferroalloy Extraction In DC-Arc Furnace At Middleburg Ferrochrome - SynopsisBy D. Sager
Middleburg Ferrochrome (MFC), a company in Samancor Chrome, commissioned a new ferrochrome smelter in March 2009. This is a 60 MW DC-arc furnace with a DC power supply for the smelting of Transvaal ch
Jan 1, 2010
-
Wet Heavy Mineral Pilot Plant Design, Assembly, Commissioning And Operation For A Remote LocationBy P. A. P. Fouché
Processing confidence for a bankable feasibility study on a green field heavy mineral deposit is inmost cases achieved only through bulk sample processing. Bulk sample is classified as a large enough
Jan 1, 2007