Material Properties for Analysis of Deep Mixing Support SystemsBy Alex Grenoble, Alex Reeb, George Filz, Farzad Abedzadeh
"This paper summarizes available information on the characteristics and properties of deep-mixed soilcement produced by the wet method. The topics covered in this paper include: unit weight, unconfine
Jan 1, 2015
-
2100 L Street Underpinning & Support Of ExcavationBy Charles R. Conlon, Matthew J. Niermann
This paper presents the underpinning and excavation support systems used for construction at 2100 L Street in Washington, DC. The excavation for the proposed building extended below bedrock, which pre
-
Post-Katrina Emergency Interim Flood ProtectionBy Fred Fuchs
"Most deep foundation work is either unseen by the general public or viewed as an inconvenience in their daily lives. Hurricane Katrina changed that perspective for everyone in New Orleans — and many
Jan 1, 2008
-
The First Cut-Off Wall In The Indian Himalayas For The Dam Of The Dhauliganga Hydroelectric ProjectBy Wolfgang G. Brunner
In the far north of Uttar Pradesh Province in the Indian Himalayas, the 280 MW Dhauliganga hydroelectric power plant is under construction by National Hydroelectric Power Corporation (NHPC), a state-
Jan 1, 2004
-
R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and PerformanceBy Michael Cianchetti, Nadir Ansari, Matthew Janes
"PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations
Jan 1, 2007
-
Pile Testing Methods - Authors' Presentations. - Paper 9.1 An Innovative Approach To Load Testing Of High Capacity PilesBy W. G. K. Fleming
Mr P. Bermingham introduced paper 9.1, describing the development and trials of a new pile load-testing technique that the Authors had termed "Statnamic". The system involved launching a test weight m
Jan 1, 1991
-
Design Challenges and Solutions for the I-205 Abernethy BridgeBy James Walters, Samuel Sideras, Kathryn Petek
The Oregon Department of Transportation {ODOT} is currently performing a seismic retrofit and widening of the Abernethy Bridge as part the 1-205: Stafford Road to OR213 Improvements Project. The Aber
Sep 1, 2024
-
Session 22 "Compaction Grouting and Limited Mobility Grouting"By Allen Cadden
The type of soil we had was a silty fine sand. It had been placed by hydraulic methods in 1904 so it was quite clean I would say less than 10% silt the rest of it was very loose sand. That I'm n
Feb 10, 2003
-
Engineering Sustainability"What can we do in ground engineering to reduce damage to the environment, to repair historic pollution, to reduce our demand on basic resources and to reduce the carbon footprint of our industry? Som
Jan 1, 2009
-
The Deep Cut-Off at the Walter F. George Dam"TREVIICOS CorporationINTRODUCTIONThe Walter F. George lock and dam was constructed on the Chattahoochee River between 1955 and 1963 with the double function of improving navigation and generating pow
Jan 1, 2014
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope Terminal 46 Apron Upgrade, Port Of Seattle, WA (18615664-0169-4e91-aa2b-8ec5994bb0a0)By Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope TERMINAL 46 APRON UPGRADE, PORT OF SEATTLE, WABy Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Cape Wind Offshore Wind Farm – Electrical Service Platform – Substructure Jacket DesignBy S. Chilka, I. Maloney, J. Brady
"The purpose of this project was to design the Electrical Service Platform (ESP) for the Cape Wind Offshore Wind Farm. The ESP structure comprises two primary parts: the topside platform housing the e
Jan 1, 2017
-
Session 26 "Groutability and Grout Evaluation"By Peter Yen
This session consists of five papers. Three involved research on the properties of grout materials, specifically ultrafine cements and polyurethane grouts. Two papers present the development of soil g
Feb 10, 2003
-
Caisson Foundations For Mississippi River Bridges In The New Orleans AreaBy William B. Conway
This paper will describe the large caisson pier foundations for four of the bridges crossing the Mississippi River in the New Orleans area; and will discuss some of the unusual problems encountered du
Jan 1, 2013
-
Tresfjord Bridge -Pile WorksBy Andreas Andenæs, Arne Schram Simonsen
"AbstractThe Tresfjord bridge is with its variety in foundation concepts and difficult soil conditions one of the most geotechnically challenging projects in Norway at the time. The project comprises
Jan 1, 2014
-
A Non-Destructive Monitoring System for QA/QC of Cement-Bentonite Cut-off WallsBy Sathya Subramanian, Jun Yuan Ryan Lee, Angelina Yi Tian Theng, Kai En Low, Soon-Hoe Chew, Yeow Chong Tan, Kai Yang Toh, Pei Ling Goh
Conventional Quality Assurance and Quality Control (QA/QC) methods for Cement Bentonite (CB) walls rely on destructive coring, which is carried out at specific curing times like 28 days or 91 days. Th
Oct 7, 2024
-
Helical Pile Foundations at Tangier Island SubstationBy Jeff Wilkinson, Brandon Walter
"A&N Electrical Cooperative provides electrical service to the counties of Accomack and Northampton along Virginia’s Eastern Shore and to Smith Island in Somerset County, Md.A&N recently worked to imp
Jan 1, 2017
-
Helical Pile Foundation Solution for Landfill RedevelopmentBy Kevin Baumgartner, Steven Babcock
A landfill in Phoenix, AZ reached capacity and was graded over in the 1970s. The property was subdivided into lots in 2007 to create a business park. However, the challenging site conditions caused by
Sep 8, 2021
-
St. Anthony Falls I-35W Bridge - Deep Foundation Monitoring Methods And Equipment For Bridge ConstructionBy Bryan C. Field
The proposed construction schedule for the St. Anthony Falls I-35W Bride challenged the abilities of the design-build teams to utilize the best and most efficient methods to meet Minnesota Department