Developments In Coatings To Combat Negative Skin Friction - Bitumen Coatings: Practical Design And Construction AspectsBy George Machan
Bitumen coatings have been successfully used to significantly reduce downdrag on piles. Thicker coatings of "soft" bitumens can accommodate downdrag so well that very little downdrag load is transferr
Jan 1, 1989
-
Presentation #2 - Non-Destructive Testing For Drilled Shafts - ContentsBy Frank Rausche
Introduction and Background Testing -Pile Preparation -Data Processing -Data Interpretation/Case Studies Case Studies - Existing Piles Stories from around the world
Jan 1, 2001
-
The Underwater Cut-Off At The Walter F. George DamBy Gianfranco Di Cicco
Seepage problems were recorded for more then 40 years at the Walter F. George lock and dam. In 2001 the Mobile district of The U.S. Army Corps of Engineers turned to the installation of a 200 feet dee
Jan 1, 2013
-
Cut-and-Cover Excavation ChallengesBy Sitotaw Y. Fantaye
"The first segment of the Second Avenue Subway extension is approaching construction completion. The new extension will operate along Second Avenue from 96th Street to 63rd Street, where it will diver
Jan 1, 2016
-
Instrumented Hybrid Shoring System for a Deep Temporary Excavation Incorporating Cutter Soil Mixing in Vancouver, BC, CanadaBy Nadir Ansari, Brian W. Wilson, Marina S. W. Li
"A hybrid shoring system consisting of cast-in-place soldier piles with Cutter Soil Mixing (CSM) infill panels was constructed for temporary support of a 19.8 m (65 ft) deep excavation in Vancouver, B
Jan 1, 2017
-
The World's Longest Directional Impact Driven PileBy Robert F. Stevens, Robin Givet, Kenneth Viking
"Summary This paper describes a case of a directional pile installation conducted from an existing oil platform in the Caspian Sea, offshore Baku. Results are presented for 660 mm outer diameter (660
Jan 1, 2014
-
Alternative Design and Construction Method for Clinton CSO Underground Storage FacilityBy Meeok Kim, Paul Beljan, Gordon Chen
"Clinton combined sewer overflow storage (CSO) facility project developed by the Department of Water Environment Protection of Onondaga County, New York, is to improve sewer facilities and infrastruct
Jan 1, 2015
-
Geophysical Methods for Site Characterization for Marine Foundations (2dc87bb8-7bfd-4523-92cd-c3dfe612556c)By Richard E. Sylwester
Evaluating surface and subsurface conditions for marine foundations (bridges, causeways, terminals, etc.) is often done with a limited amount of data. Subsurface information for these projects is prim
May 11, 2007
-
Bay Park Conveyance Project: SOE for 14 Shafts on a Microtunnel AlignmentBy Renee Fippin
Several projects are underway in Nassau County, New York, to improve water quality in the Western Bays of Long Island. A major piece in accomplishing this is the Bay Park Conveyance Project. When com
Feb 1, 2024
-
Remedial Method for Collapse Soil Foundation of Mosul DamBy Arash Khosravifar, Ali N. Ibrahim
"Large areas of Iraq are covered with collapsible soils namely gypsiferous soil which is often used as the foundation soil for structures. In particular, the Mosul Dam foundation is comprised of high
Jan 1, 2017
-
Study Of Ground Settlement And Volume Loss Associated With Tbm Tunnelling By Analytical And Numerical MethodsBy Suresh Chikati, Gangadharan Santhanam
Twin tunnels were constructed to a length of 863m using TBM in one of the underground metro projects. The tunnels pass through complex geological conditions (soil, rock and mixed conditions). This pap
Sep 1, 2022
-
Interdisciplinary And Inventive Approaches To Drilled Shaft RemediationBy William D. Oder, Seth H. Hamblin, Les R. Chernatskas, Jonathan L. Ernst
Large diameter drilled deep foundations are a widely utilized solution throughout North America and the world. Numerous design and construction techniques developed over the past 100 years have made t
Oct 1, 2022
-
Lateral Capacity of Drilled Shafts Considering Push-Pull ResistanceBy Ke Yang
"Drilled shafts are typically used to support structures subjected to large moments at the shaft head. The large moment can produce push and pull forces on the two sides of a drilled shaft. Consequent
Jan 1, 2005
-
Cased Auger Piles (CAP): An Effective Piling SolutionBy Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for
-
Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)By Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d
Jan 1, 2017
-
Open Cell Sheet Pile® Dock In Remote Alaska Provides Innovative And Cost-Effective SolutionBy Dempsey S. Thieman
Innovative marine bulkhead design and construction techniques were used in the fast-track design and construction of a high-capacity, deep-water dock in the highly seismic region of Alaska?s Aleutian
Jan 1, 2008
-
Back Analysis of Field Instrumentation Results during Reclamation & Ground Improvement Works- A Case StudyBy Prasanta Paul, Aminul Islam
"Nhava Sheva (India) Gateway Terminal Private Limited proposed to construct a container terminal yard, comprising a back-up area at Jawaharlal Nehru Port Terminal (JNPT), Uran, Maharashtra. The propos
Jan 1, 2015
-
Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current PracticeBy Jim Slatter, Ben Collingwood
"It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali
Jan 1, 1900
-
A Case Study Of Deep Shaft Excavation In River Channel Soil Deposit In KolkataBy Kaustuv Bhattacharya, Manish Kumar, Nirbhay Singh, Prodyot Kr. Ray, Praveen Soin
This paper highlights salient features of an excavation 38 m (Length) by 10 m (Width) by 24 m (Depth) carried out in Central Kolkata. Secant pile wall (SPW) formed using a combination of alternating 1
Sep 1, 2022
-
Systematic Laboratory And Field Study On The Shear Resistance Of The Soil-Concrete Interface Of Diaphragm Walls And Bored PilesBy Matthias Pulsfort, Jiarui Du, Torsten Wichtmann, Achim v. Blumenthal, Diethard König, Rowena Verst
The influence of the interaction between support fluid and soil, e.g., filter cake formation, on the shear stress transfer in the soil-concrete interface of diaphragm walls and bored piles is still co
May 1, 2022