Response Of A Pile In Soft Clay Under One-Way Cyclic Lateral LoadingBy Padmavathi V. Sagi
In this paper, effect of cyclic loading on the behavior of a long, flexible, unrestrained vertical pile loaded laterally in soft clay is examined. For cyclic loading, the analysis is carried out usin
Jan 1, 2006
-
Bearing Capacity Of Piles Determined By Field Tests ? SynopsisBy D. M. Milovic
On the basis of relatively large number of field load tests of piles, the determination of the ultimate bearing capacity have been studied. Using the load settlement curves and the results of the cone
Jan 1, 2010
-
Influence Of Diameter On The Bearing Capacity Of Lateral Loaded Drilled ShaftBy Bin Zhang
Drilled shafts are a popular type of foundation for transportation applications. They feature the advantages of providing high bearing capacity and generating low construction noise. Advancements in
Jan 1, 2007
-
Behavior Of PCC Pile Under Lateral LoadBy Zhitao Ma
The Cast-in-place Concrete thin-wall Pipe pile, referred to as PCC pile, is a new kind of pile for soft ground improvement. In this paper, firstly, the general introductions of the new pile technique,
Jan 1, 2006
-
Deep Compaction Of Saturated Loess By Means Of Sand-Gravel Piles ? SynopsisBy Z. G. Lin
In Xian, China, compaction by means of soil (or lime-soil) piles is one of the effective methods widely used for densifying loess and eliminating its collapsibility. However, as a result of groundwate
Jan 1, 2010
-
Single Pile Settlement Prediction And Analysis For Driven PilesBy David R. Beadman
The Fleming method is widely used for the analysis and prediction of single pile behaviour under maintained loading. The method does not distinguish between bored and driven piles. Driven piling avoid
Jan 1, 2006
-
Bearing Capacity Of Nodular PilesBy S. Kanai
Nodular piles is to be piles provided with several nodular projections along the pile shaft, as shown in Fig. 1. Nodular piles are usually installed through either driving method with hammer or prebor
Jan 1, 1989
-
PVC And Steel Access Tube Debonding During Sonic Logging Testing For The SC 170 Bridge Replacement ProjectBy Edward L. Hajduk
During sonic logging quality control testing of the drilled shaft foundations for the replacement bridges crossing the Broad and Chechessee Rivers for SC 170 in Beaufort County, South Carolina, irregu
Jan 1, 2004
-
Application Of The Dynamic Increasing Energy Test (DIET) In Load Transfer Analysis Of Precast Piles Driven In Soft Clay FormationBy Jean Balech
This paper presents some results of dynamic loading tests performed on concrete piles driven in soft clay formation. The load transfer mechanism, measured in the dynamic increasing energy test (DIET),
Jan 1, 2002
-
An In-Situ Model Test For A Large Hydraulic Press Foundation ? SynopsisBy R. J. Yan
There was a plant equipped with a 32000t Hydraulic Press to be built, under which a box foundation of 22.5m x 15m x 14.25m (depth) with a base slab of, varying thickness was proposed. The subgrade rea
Jan 1, 2010
-
Installation Of Augered Cast-In-Place Piles - Equipment (f7778f75-6023-4133-8cd3-e733645bdcdf)? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 1997
-
Some Problems Encountered During Pile Installation - SynopsisBy [D. N. ] Naresh
During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som
Jan 1, 1996
-
Overview Of Enabling Works For Waterfront Structures – Design & ConstructionBy Nagarajan. D, Raja Rajan. K, Vijayakumar. T
Major bridges crossing mighty rivers must be constructed in flowing water. Constructing the sub-structure in water has been a challenging job for contractor. Special construction techniques with marin
Nov 1, 2022
-
Driven PilesBy S. Merjan
Three papers were presented for discussion at the conference: 1) Instrumented driven steel tube piles at Canary Wharf; author: A. R. Gaba, United Kingdom. The author described the Canary Wharf
Jan 1, 1991
-
Pile Test Results - 1-15 Corridor Reconstruction Project, Salt Lake City, Utah (Abstract Only) - DFI Member Conference - Seattle, 1998By D. M. Holloway
As a part of the 1-15 Reconstruction Project, static and dynamic (high-strain) testing methods formed the basis to estimate long-term axial capacities, and to assess the magnitudes of bearing capacity
Jan 1, 1998
-
Comparative Analysis Between Traditional And EC7 Criteria Applied To The Design Of Diaphragm Walls Concerning The Ultimate Limit StatesBy J. Matos e Silva
The paper refers five examples of executed diaphragm walls with one to five levels of anchorages. For each example a comparison is made between the results of the design using the traditional crit
Jan 1, 2002
-
Augered Cast-In-Place Piles - Friday, May 5, 2006 - Title ? Table Of Contents - A Historical Perspective On Current Cast-In-Place Piling PracticeBy Willie M. NeSmith
Cast-in-place piling are a staple of the deep foundation industry, and are used (in various forms) worldwide. In assessing the application of cast-in-place piles, it is of value to reflect on the dev
Jan 1, 2006
-
Driven Piles In Central Texas Expansive SoilsBy Clayton A. Signor
Abstract: Expansive soils cause more damage to structures annually than a combination of other major natural disasters. Because of the cost to our society, all means and methods need to be fully expl
-
Technical Note - Load Testing And Interpretation Of Instrumented Augered Cast-In-Place PilesBy Timothy C. Siegel
Given that piles are composed of different materials and installed using a variety of methods, ASTM D 1143/D 1143M-07 Standard Test Methods for Deep Foundations Under Static Axial Compression is justi
Jan 1, 2010
-
Capitol Complex Phase 1 ExpansionBy Eric S. Lindquist, Charles A. Luxford
The State of Texas recently adopted a master plan to expand the existing Capitol Complex in Austin. Phase 1 of this expansion will add two new State office buildings and five levels of underground par