Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Jetting-Assisted Sheet Pile Driving

    By Marie-Pierre Bourdouxhe-Barnich

    Since 1997, in partnership with the Laboratoire Central des Ponts et Chaussées in Strasbourg, ProfilARBED has been carrying out a vast study to qualify the improvements jetting can make to vibratory d

    Jan 1, 2002

  • DFI
    Prediction Of Ultimate Pile Bearing Capacity Using Artificial Neural Networks

    By Vahid Tajdar

    The behavior similarity between pile and cone penetration test, has guided the researchers to use the CPT results in prediction of piles bearing capacity. In this article, artificial neural networks h

    Jan 1, 2006

  • DFI
    Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing Methods

    By Juan M. Antorena

    A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a

    Jan 1, 1995

  • DFI
    An Innovative Foundation Technology For The Construction Of Retaining Walls In Urban Areas - Introduction

    By F. Pagliacci

    Retaining walls for the construction of underground urban infrastructures have to be executed considering the impact of a deep foundation job-site within an urban network. Traditional excavation syste

    Jan 1, 2000

  • DFI
    Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? Summary

    By Chris Harnan

    This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques

    Jan 1, 2000

  • DFI
    100-Day Document - Mandatory Discussion, Mediation And Arbitration Of Construction Disputes ? 1.0 Coverage

    1.1 The parties agree to submit all claims, disputes or controversies arising out of, or in relation to, the interpretation, application or enforcement of this agreement, including dispute resolution

    Jan 1, 1994

  • DFI
    Lateral Earth Pressure On Lagging In Soldier Pile Wall Systems

    By Howard A. Perko

    Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me

    Jan 1, 2008

  • DFI
    Friction Piles In Boston Blue Clay, Suffolk County House Of Corrections, Massachusetts ? Summary

    By Harry K. Weatherbee

    The paper presents a design case study for a four-story correction facility addition in south Boston, Massachusetts, supported on friction piles driven into the Boston Blue Clay. 356 mm (14-in.) squar

    Jan 1, 2003

  • DFI
    Test Pile Program To Determine Axial Capacity And Pile Setup For The Biloxi Bay Bridge

    By W. Robert Thompson

    Hurricane Katrina caused significant damage to transportation structures on the Gulf coast in August, 2005, including the destruction of the US 90 Bridge over Biloxi Bay, Mississippi. Part of the suc

    Jan 1, 2009

  • DFI
    Upgrading Projects of Existing Infrastructures by Steel Piles – Press-in Method and Implant Structure

    By Tsunenobu Nozaki

    "AbstractThe PRESS-IN METHOD is widely recognised as “an environmentally friendly piling method”. However, this characteristic is only one of the fundamental advantages of the method and this paper pr

    Jan 1, 2014

  • DFI
    Design Of Augered Cast In Place (ACIP) Piles - Introduction

    By Michael McVay

    The use of augered cast-in-place piles has seen tremendous growth under commerical structures in the past twenty years. Problems with vibration, soil densification and/or heave associated with driven

    Jan 1, 1997

  • DFI
    A Study Of Three Test Sites Comparing Theoretical Ultimate Pile Capacities, Static Pile Load Tests, And Psuedo Static Pile Load Test Results

    By Richard D. Short

    The Pseudo Static Pile Load Test, PLT, is a rapid method for determining pile capacity. Pile design is usually based on theoretical calculations of ultimate load capacity using soil data from a field

    Jan 1, 2000

  • DFI
    Environmental Benefits of Repurposed Tubular Steel Sourced from Pipe Mill Secondary and Oil Field Surplus

    By Mark Dowling, Robert Holdway, Bill Baillie

    Extending the utility of materials through reuse, repurpose and recycling to minimize waste, pollution, water, and the consumption of finite resources, reduce environmental impacts and cut GHG emissio

    Oct 7, 2024

  • DFI
    Piled Raft On Layered Soils

    By Luca de Sanctis

    The analysis of piled raft foundations in layered soils may be performed by 3D finite elements or by approximate procedures. Among the latter, the code NAPRA (Russo, 1998) is based on the method of th

    Jan 1, 2002

  • DFI
    Developments For Mitigating Measures From Deep Shafts Of North/South-Line Amsterdam

    By Klaus Pöllath

    This paper describes mitigating measures and the design of compensation grouting which will be executed from deep shafts of the Amsterdam North/South Metro line project. Due to the specific conditions

    Jan 1, 2006

  • DFI
    Technical Aspects And Research In Downdrag

    By Jean-Louis Briaud

    The following is a summary of a very recent report prepared at Texas A&M University for the National Cooperative Highway Research Program and entitled "Downdrag on Bitumen Coated Piles". Anytime the

    Jan 1, 1989

  • DFI
    A New Method Of Analysis Of Pile Displacement In Soil With Respect To Time

    By M. England

    A method for the analysis and prediction of single pile displacement behaviour is described. It is the displacement in time, under constant load, based on the use of hyperbolic functions to characteri

    Jan 1, 1993

  • DFI
    Load In A Drilled Foundation. Where Did It Go And When Did It Get There?

    By Walter E. Vanderpool

    Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.

    Jan 1, 2004

  • DFI
    Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? Introduction

    By Brian R. Zuckerman

    The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State

    Jan 1, 2002

  • DFI
    Repair Of Deep Foundations - Summary

    By Dennis W. Boehm

    The building boom of the late 1970's and early 1980's has all but used up most of the better sites across the more populated metropolitan areas of the United States. This means that current

    Jan 1, 1999