Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Float-In CofferdamsBy Robert B. Bittner
Large diameter piles (2 to 3 m diameter, both driven and drilled) are being used more frequently by designers of bridge foundations. The use of these large piles allows the pile cap to be positioned
Jan 1, 2013
-
High Stress Pile Testing At Soldier FieldBy Michael H. Wysockey
The load test program for the pile foundation at Soldier Field included static and dynamic load tests at four locations around the site. The dynamic tests were run with no knowledge of the static resu
Jan 1, 2002
-
Seismic Considerations for Bridge FoundationsBy Lok M. Sharma
"Construction of a new bridge in a seismically sensitive area requires careful assessment of earthquake impact on the serviceability of the facility. Not only is the superstructure vulnerable, the fou
Jan 1, 2017
-
Evolution Of Piling Design And Techniques In Mudstone At Manchester AirportBy Colin Curtis
In recent years, Manchester Airport has undergone expansion including the construction of a second runway, a new terminal building (Terminal 3) and extensions to the existing Terminal 1. Manchester is
Jan 1, 2001
-
Vibratory Driver/Extractors Do More Than Drive Sheet Piles - SummaryBy John L. White
Vibratory driver/extractors do more than drive and extract sheet piles. I would say more than sixty percent (60%) of the time, vibratory pile driver/extractors are engaged in work that has nothing to
Jan 1, 1997
-
Session III - Foundation Techniques In The Urban Environment - Structural Movement And Ground Settlement Control For A Deep Excavation Within An Historic Building - SynopsisBy Martin J. Kenwright
Within the famous Harrods department store, a new lift shaft has been constructed, servicing a depth of 22m below ground level as well as the existing 6 storeys of the store. The shaft will connect wi
Jan 1, 2000
-
Hand-Excavated Pier Foundations For A High-Rise Hotel In The City Of Dalian, China ? SynopsisBy A. K. C. Chan
Recent hotel investment projects in China often involve very tight programmes for design and construction. An example given in this paper involves a 24-storey reinforced concrete hotel tower with 460
Jan 1, 2010
-
Deep Foundation Solutions And Implementation For Pittsburgh International Airport Midfield Terminal ? 1.0 IntroductionBy Peter Florian
At 5:50 am on October 1, 1992, the new $800 million Pittsburgh International Airport Midfield Terminal opened its gates to the world after five years of construction and more than 24 years of planning
Jan 1, 1993
-
Foundations On Karstic Limestone In Kuala Lumpur Malysia ? SynopsisBy J. M. Mitchell
Kuala Lumpur, Malaysia is underlain by karstic limestone. Firm clays, mudstones and siltstoncs of the Kenny Hill Formation overlie the limestone for about two thirds of the city. The remaining third h
Jan 1, 2010
-
Performance Of Three Unique Shoring Sections For Block 75 ShoringBy Chris Sammon
The Block 75 portion of the City Creek redevelopment project in Salt Lake City required multiple shoring walls surrounding the 6 acre site constructed to depths ranging from sixty-five to ninety feet
Jan 1, 2010
-
Augered Cast-In-Place Piles: Regional Project Profiles - Community Osteopathic Hospital Harrisburg, PaGENERAL CONTRACTOR: ALEXANDER CONSTRUCTORS, INC. STRUCTURAL ENGINEER: CAGLEY & ASSOCIATES, INC. GEOTECHNICAL ENGINEER: F.T. KITLINSKI & ASSOCIATES, INC. PILE FOUNDATION CONTRACTOR: L.G. BA
Jan 1, 2001
-
Long Term Behavior Of Piles - Presented At An ASCE-Penn DOT Seminar Innovations In Geotechnical Engineering - Harrisburg, PA, April 1985By Donald J. Murphy
Longevity of structural units, as compared to the planned useful life of a facility, always is a design consideration. Typical concerns include slow decay due to environmental factors, and changes in
Jan 1, 1986
-
2D and 3D Finite Element Analysis for Cantilever Slurry Walls in Cohesionless SoilBy Mostafa Mossaad, Ali Helwa, Manal Salem
Support of excavation (SOE) design practice tends to model SOE elements using two-dimensional (2D) analyses to avoid the complexity associated with three-dimensional (3D) analyses. Such practice overl
Jan 1, 2018
-
Interlocking H-Sections For Cofferdams Resist High PressureBy Marc Dondelinger
Interlocking H sections with deep webs and high section modulus are being used for cofferdams and shore enclosures where pressures are excessive. The H sections can be as much as a meter deep; they ca
Jan 1, 1985
-
Site Solutions For The Pisa Tower Remediation - 1 - IntroductionBy Paolo Heiniger
The aim of this paper is to present the operative solutions devised and then adopted to implement the underexcavation (soil extraction) of the Tower of Pisa, by means of soil extraction. The inter
Jan 1, 2000
-
Diaphragm Walls, Recent Developments to Improve ReliabilityBy A. Frits van Tol, Rodriaan Spruit, Jan H. van Dalen
"Abstract In recent years, there have been major problems with deep excavations in urban areas supported by diaphragm walls. In some cases, like the fatal Nicoll Highway collapse in Singapore the qual
Jan 1, 2014
-
Use Of Auger Pressure Grouted (APG) Piles Inside An Existing Operational StructureBy Lawrence P. Goldfarb
The City of Alexandria, Virginia, Public Safety Center (PSC) is a 64,000 square foot facility that houses the Police Department, Office of Sheriff and the Office of Magistrate. In addition, the center
Jan 1, 2009
-
Use Of Controlled Modulus Columns In Retail & Industrial Development ProjectsBy Frederic Masse
With widespread acceptance in the market place, many engineers are choosing ground improvement techniques to provide suitable foundation subgrade at sites that would have traditionally required deep f
Jan 1, 2011
-
Pile Design, Testing, And Installation For A Gated Dam ? SynopsisBy B. H. Moore
The opportunity to evaluate the pile design procedures used on a major project is an infrequent occurrence. It is even more infrequent that the project involves piles with significant tension and hori
Jan 1, 2010
-
Coming To Times - Background - CollapseBy Darrell L. Beddard
The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western
Jan 1, 1995