Deep Foundations for Top-Down Construction of High-Rise ProjectBy Martin B. Hudson, Kenneth S. Hudson, Gwendolyn Arreguin
A twin high-rise project site in Century City posed several foundation engineering challenges for the design team. One portion of the twin high-rise project site was required to utilize top-down const
Jan 1, 2019
-
London One New Change - Energy Piles® And Open Loop Wells Used For Ground Source Heating And CoolingBy Peter Smith
One New Change is a landmark retail / commercial development in the City of London. Integral to the structure is the three double storey basement from which the building is serviced. The building cons
Jan 1, 2010
-
A novel approach to bracing a piled retaining wall using temporary piled buttressesBy Will Frampton, Rachel Salter, Zoe Baldwin, Tim Hampshire
Cementation Skanska were responsible for the design and installation of 200 linear meters of contiguous bored piled retaining wall and approximately 1300 bearing piles for a new commercial arena devel
Oct 31, 2023
-
Installation of a Cutoff Wall Along the Mississippi River – A Case HistoryBy Michael Arnold, Matteo Bertoni
This paper presents a project which received a DFI Special Recognition Award as a runner-up in the 2023 DFI Outstanding Project Award competition. The East St. Louis levee system is located in St. Cla
Oct 7, 2024
-
Threading the Needle: Design and Construction Over and Alongside Subway TunnelsBy Desi Dikova, Daniel Wagstaffe, Lori Simpson, Eric Lindquist
1621-1629 Market Street is a mixed-use development in the South of Market district of San Francisco, located directly above Bay Area Rapid Transit (BART) tunnels and alongside the San Francisco Munici
Oct 7, 2024
-
Leveraging The CM/GC Project Delivery Approach for Remote High Elevation Dam Rehabilitation Projects In ColoradoBy Mark Brooks, Brian Freeland, Eric Eisinger
Colorado Parks and Wildlife (CPW) operates more dam and reservoir facilities in the State of Colorado than any other single entity and is in the process of completing rehabilitation upgrades to improv
Oct 7, 2024
-
Testing Foundations for Major Minnesota BridgesBy Dan A. Brown, Rich A. Lamb, Paul J. Axtell
"Over the last 10 years, the Minnesota Department of Transportation (Mn/DOT) has had a very active program of replacing many major bridges, large structures spanning the Mississippi River. The deep fo
Jan 1, 2013
-
Driven Pile Foundation Design and Construction Issues for a Highrise Building in ManhattanBy Satyajit Vaidya, Rudolph Frizzi, Sandy Larimer
"This paper presents a case history in design and construction of a deep foundation system that included high-capacity open-ended driven piles constructed to support a high-rise building in Manhattan,
Jan 1, 2016
-
Fundamentals FirstBy Jeffrey C. Schuh, Logan Bloemer, Daniel P. Dietzler
Over the past 30 years, the authors have encountered numerous projects where recognizing the geology, soil properties and groundwater conditions, and considering alternative construction techniques ha
Jan 1, 2019
-
Case Study on the Frederick Douglass Memorial Bridge and the use of Large Diameter Open End Steel Pipe Piles, Washington, DCBy Karl A. Higgins, Michael D. Venezia
The South Capitol Street Corridor Project is one of the District Department of Transportation’s (DDOT) largest projects, and is currently under construction. This case study will focus on the design o
Jan 1, 2019
-
Jobsite Safety Inspection ChecklistBy Sam Messina
[Project: Job Number: Date: Superintendent: Person Making Inspection: Note: The following checklist shall be used on a regular basis as an overall assessment of the jobsite. The checklist
Jan 1, 1998
-
Heating and Cooling Structures with Steel Pile Foundations - Closed Loop Standing Column Well Technology (df25801f-7df6-457c-ab18-569c2a6ce07f)By Paul Suver
"The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing c
Jan 1, 2017
-
Retaining Structure for Berth at KrishnapatnamBy P. V. Chandramohan
"The paper deals with the arrangement of structural members for a retaining structure used as a berth in the port of Krishnapatnam. The height of retention is 24.3m. A T-shaped diaphragm wall acts as
Jan 1, 2015
-
UHE Peixe Angical: Secant Cutoff Wall in Uncertain GeologyBy Dario Libano, Armando Caputo, Francisco Caputo
"UHE Peixe Angical is a 452 MW hydroelectric power plant located on the Tocantins River in Tocantins, Brazil. In 1999, geologists began feasibility studies to estimate the river’s hydroelectric potent
Jan 1, 2009
-
Cutter Soil Mixing Solutions at the Leixões Cruise TerminalBy Xavier Pita, Alexandre Pinto, António Cristovão, Rui Tomásio
"The cutter soil mixing technology was been applied in Portugal since the last seven years. The aim of this paper is to present the main design and execution criteria, related with both the cofferdam
Jan 1, 2015
-
Analysis of Panel and Pile Verticality and Overlap in a Project Information Management SystemBy Jamey Rosen, Georgette Hlepas
Verticality data collected from panel and pile elements of seepage barrier walls describe the shape and position of those elements in three dimensions. These data are used to determine if a barrier wa
Sep 8, 2021
-
Ground Freezing: The Use of Liquid Nitrogen Systems Converted To BrineBy Joseph A. Sopko
There has been a trend in recent years in performing the initial formation freezing using liquid nitrogen (LIN) and then converting the system to circulating refrigerated brine. While proponents of th
Jan 1, 2019
-
Support of Excavation Utilizing Helical Soil Nails with High Tensile Wire MeshBy Kevin Baumgartner, Howard Perko
Common technologies for temporary and permanent support of excavations (SOE) include soldier piles and lagging, secant/tangent piles, slurry walls, and tie-back walls. This paper discusses an innovati
Oct 7, 2024
-
Approximate Assessment Of Basement Wall Effects On Foundation PerformanceBy Helen S. W. Chow, Harry G. Poulos
Most modern buildings involve the construction of a basement, often of several levels, to maximize the floor area ratio. The basement walls are generally designed for excavation retention purposes onl
Nov 1, 2022
-
Quality Control and Testing of Jet Grouting and its Interpretation in Relation to the Christchurch Town Hall Restoration Project.By David Chadwick, Paul Marsden, Chris Hughes, Mathias Delapille
"Following damage caused by the 2011 Christchurch earthquakes, the NZ$127.5million Christchurch Town Hall Restoration project is due for completion in 2018. The building is undergoing extensive repair
Jan 1, 1900