Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Designed, Load-Tested, And Installed Piles For A High-Rise Building In Southwest Florida - A Case History - Synopsis

    By Anupam Saxena

    This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading test, and installation of piles for a 22-story condominium tower in southwest Florida, U

    Jan 1, 1996

  • DFI
    Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic Environment

    By Thomas M. Caruso

    Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,

    Jan 1, 2008

  • DFI
    The Use of Bentonite in Underground Construction

    By Hector Simchas

    "1. BENTONITE: THE CRUCIAL CONSTITUENT OF SLURRYSuspensions of bentonite and water are used in a variety of applications in underground engineering. For the construction of underground elements like s

    Jan 1, 2015

  • DFI
    Innovation In South East Asia - Synopsis

    By Brian Littlechild

    Whilst there is much innovative work being undertaken in South East Asia in the space allowed in this paper we have settled on describing in more detail the work that has been done with shaft grouting

    Jan 1, 2000

  • DFI
    The Use of Advanced Electronic Features in Foundation Equipment Help or Hype for the User?

    By Manfred Schoepf

    "Construction projects using the most advanced technologies and organizational structures demand intelligent construction machinery. In this process, automation technology plays an increasingly import

    Jan 1, 2015

  • DFI
    Surprises And Solutions When Driving Piles In Mountain Valleys Of Vermont

    By John E. Lens

    Driving bridge foundation piles into glacio-fluvial sands and gravels and glacial tills brought surprisingly longer than predicted driving lengths on several recent projects in Vermont. In some insta

    Jan 1, 2007

  • DFI
    The Practical Application Of Pile Reuse At Bow Bells House, City Of London

    By Justin Phillips

    The redevelopment of Bow Bells House in London has thrown up a number of challenges that will increasingly be faced by developers of congested sites. In the context of pile reuse this paper examin

    Jan 1, 2008

  • DFI
    Woodrow Wilson Bridge Cofferdams

    By Roderic A. Ellman

    The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.

    Jan 1, 2005

  • DFI
    Jacked Tunnel Construction

    "Boston’s Central Artery passes beneath nine active railroad tracks carrying commuter and Amtrak trains into South Station, the City's busiest rail terminal. These railroad operations had to remain in

    Jan 1, 2003

  • DFI
    The Wireline Undisturbed Soil Sampling In Deep Foundation ? Synopsis

    By Z. Q. Bian

    The wireline sampling originates from core drilling in rocks. The authors combined the wireline sampling technique with conventional undisturbed soil samplers, including Osterberg sampler, Denison sam

    Jan 1, 2010

  • DFI
    A General Formula To Determine The Allowable Pile Bearing Capacity In Case Of Negative Skin Friction ? Summary

    By Cornelis Van Der Veen

    Foundation piles, partly passing through unconsolidated compressible layers, suffer a downward drag that is called negative skin friction. The negative skin friction depends on the movement of the sur

    Jan 1, 2010

  • DFI
    Comparison Between Statnamic And Static Load Testing Of Drilled Shafts In Varved Clay

    By Carl Ealy

    Static and STATNAMIC (STN) rapid load test (RLT) was performed on 3-drilled shafts. The purpose of the RLT part of the study was to obtain data in support of FHWA research on innovative load testing m

    Jan 1, 2002

  • DFI
    Lessons Learned From Mitigating Early Project Delays To Deep Foundation Work

    By Jeffery L. Ottesen

    Early construction delays can jeopardize timely completion of subsequent work. As an early construction activity, and due to many unforeseen issues, deep foundation work inherently bears great potenti

    Jan 1, 2002

  • DFI
    Some Experiences In Construction And Design Of Stone Column Reinforced Ground ? Synopsis

    By C. W. Sheng

    In this paper conventional construction procedure is briefly described for the installation of stone columns in soft ground in China. A viewpoint concerning the mechanism of ground improvement by use

    Jan 1, 2010

  • DFI
    Historical Evolution Of The Micropile "Palo Radice" - Inception Of The Micropile

    By Pier Luigi Iovino

    As Technical Director of the Naples, Italy based Fondedile, a geotechnical construction firm specializing in static restoration of structures, Fernando Lizzi, Ing., devoted over 30 years to the pursui

    Jan 1, 2003

  • DFI
    Effects Of Pile Driving In Saturated Soft Clay ? Synopsis

    By R. L. Wei

    The disturbing influences of pile driving on the surrounding soil mass, including the induced vibration, pore pressure and displacement of soil, were observed during the construction of pile foundatio

    Jan 1, 2010

  • DFI
    Rock Socket Piles In The Sherwood Sandstone Of Central Birmingham

    By L. J. Whitworth

    Five trial piles were constructed during the trial pile programme for the Birmingham International Convention Centre. In addition, trial piles have been tested on two other sites in central Birmingham

    Jan 1, 1989

  • DFI
    Helical Piles With Grouted Shafts - A Case History

    By Shawn Downey

    A helical pile with in-situ grouted shaft was used to underpin the existing slab of a large retail store in the Edmonton, Alberta Canada area. The existing structural slab did not have the capacity to

    Jan 1, 2003

  • DFI
    Berth Deepening A Three Decade Old Wharf Structure For The Next Generation Of Container Ships

    By Bill Paparis

    The thirty year old wharf structures at the Port Authority of New York & New Jersey?s Port Elizabeth Marine Terminal are being modernized for the next generation of Post-Panamax container ships, which

    Jan 1, 2013

  • DFI
    The Use of Thermal Integrity Profiling (TIP) to Verify the Integrity of Deep Foundations

    By Beim Jorge, Piscsalko George

    "Verifying the quality of cast-in-place foundation applications, particularly those cast under slurry, is of course important, due to its great dependency on the methodology employed and on the practi

    Jan 1, 2015