    A Study Of Failure Mechanism And Uplifting Capacity Of Tension Pile Foundation ? Synopsis

    By K. J. Yang

    Based on investigations and model tests combined with pile foundation on Code compilation of drydocks, we present this report to give informations against uplift pressure of piles beneath floor of dry

    Jan 1, 2010

  • DFI
    High Strain Testing Of Large Diameter, High Capacity Unlined Bored Piles ? Introduction

    By Dhanvin B. Mehta

    Pile testing is generally understood as static load test. It is our common experience that for high capacity, large diameter bored piles, static testing is expensive and time consuming. It is practica

    Jan 1, 1996

  • DFI
    Composite Foundations For Uplift And Compression In Soft Soils And Swampy Terrain ? Synopsis

    By H. S. Radhakrishna

    Foundations supporting power transmission and communications towers are subjected to both compression and uplift loads, often of a cyclic nature. Some novel foundations, combining the beneficial featu

    Jan 1, 2010

  • DFI
    Design And Construction Of The Large Bored Piles For A Bridge Over The Yellow River ? Synopsis

    By Y. Z. Wang

    Zhengzhou Yellow River Highway Bridge, which is under construction, has a total length of 5550 meters with bored cast-in-place concrete piles as the foundations of its piers which have a diameter of 2

    Jan 1, 2010

  • DFI
    Micropiles In Soft Florida Limestone

    By James D. Hussin

    The Florida limestone is a relatively soft rock which presents many challenges to engineers when designing deep foundations. One alternative is micropiles which have grown significantly from their ear

    Jan 1, 2003

  • DFI
    Design Of Drilled Shaft Supported Mat Moscow Towers

    By Issa S. Oweis

    Two Towers are currently under construction in Central Moscow in the Russian Federation. Building A is a 96 story tower and Building B is a 65 story tower. The columns in both structures bear on a t

    Jan 1, 2007

  • DFI
    Osterberg Cell Tests Confirm In-Situ Pier Capacity In Colorado - Introduction

    By William Siegel

    Kleinfelder provided foundation analysis and design for an expansion to a cement plant in Florence, Colorado. The expansion was a conversion from a horizontal wet process to a vertical dry process, a

    Jan 1, 2007

  • DFI
    Difficulties In Caisson Construction

    By Ronnie W. Sisk

    1. Troubles start early - Inadequate Geotechnical Data A. Owners think they are saving money by allowing limited soil borings at their site. This places a high gamble on the bidders and the Lump Sum

    Jan 1, 1988

  • DFI
    New Technique To Drive Piles By Impact Hammer Inside The Pile - Synopsis

    By Djk Arentsen

    A new technique to drive tubular piles by impact hammer inside the pile has confirmed a dramatic reduction of noise and the opportunity to save steel. Also a reduction in driving time and a higher bea

    Jan 1, 1996

  • DFI
    A Case Study Of A Vibratory Pile Installation Monitoring Of A Precast Prestressed Concrete Pile

    By K. Viking

    It's well known that conventional impact hammers, usually are the method to use in order to drive precast prestressed concrete piles. However sometimes the vibratory technique might be considered

    Jan 1, 2004

  • DFI
    Seismic Stability Analysis of Seepage Control Measures for Levees in Central Valley, California

    By Zia Zafir

    "Levees in the central valley of California are primarily for flood control purposes and thus are subjected to infrequent hydraulic loading. The primary concern for these levees is their instability d

    Jan 1, 2016

  • DFI
    Design Issues for Mini-Caissons in the NYC Area

    By Caciola Jr. Joseph J., Nidal M. AbiSaab

    "Thanks in great part to the geology of the New York City Metropolitan area, mini-caissons are a popular choice for deep foundations. These drilled elements are readily available, easy to install with

    Jan 1, 2016

  • DFI
    Willow Island Hydroelectric Project: Taming the Ohio River to Create Green Energy

    By James M. Tantalla, Jr. Ellman

    "Construction of the powerhouse for the Willow Island Hydroelectric Project, located at the Willow Island Lock and Dam, required a 120-ft deep temporary excavation inside the limits of a cellular coff

    Jan 1, 2016

  • DFI
    Fogg Museum Expansion - Support of Excavation Design and Construction

    By James L. Christensen, Gregory Sanchez, Michael P. Walker

    The Fogg Museum expansion project required excavation and construction in a congested urban area in Cambridge, Massachusetts. A soldier pile tremie concrete (SPTC) wall provided the support of excavat

    Jan 1, 2015

  • DFI
    Creative Solution For Sydney Data Centre

    By M. Krzaninski, Y. Zou, A. Frost

    The foundation solution for a data centre building in Sydney, Australia comprised two alternatives, the first of which incorporated the use of CFA piles founded in rock at approx. 27m depth to support

    Nov 1, 2022

  • DFI
    Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric Project

    By James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford

    "Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock

    Jan 1, 2017

  • DFI
    New Insights On Detecting Flaws With Csl And Tip

    By Andrew Z. Boeckelmann, David S. Graham, Paul J. Axtell

    In the last fifteen years, several research studies have evaluated the ability to detect various types of deep foundation concrete integrity flaws with crosshole sonic logging (CSL) and thermal integr

    Oct 1, 2022

  • DFI
    Jet Grout Underpinning to Support the Waterman Hospital

    By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann

    The Waterman Hospital in Tavares, Florida was undergoing an expansion and required a below-grade excavation immediately adjacent to the Emergency Department. This wing of the hospital was under high t

    Jan 1, 2019

  • DFI
    Comparison of Load Test Results between ACIP Piles Installed in Sand in Pre-Drilled Holes versus Conventional Installation

    By Tracy Brettmann, Shailendra Endley, Jason Leary, Shashank Valluru

    "Augered Cast-in-Place (ACIP) piles have long been used for deep foundation support in sands due to their high capacity and speed of installation. Very little information exists on the effects on capa

    Jan 1, 2017

  • DFI
    Investigation Of Bearing Behavior Of Pile Raft Foundation Using Numerical Modeling

    By A. Ghorbani

    The analysis of Combined Pile Raft Foundation (CPRF) is very complex due to involved interactions among components of CPRF system. Many researchers made efforts to develop sufficient methods including

    Jan 1, 2007