Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Innovative Grouting Techniques for Installation of a Seepage Barrier at Barrage Des Quinze Dam (Quebec, Canada)By Danny Déry-Chamberland, Peter Bowman, Michael Byle
"The Barrage des Quinze dam is a concrete sluice dam consisting of 19 spillway sections, each of which is approximately 7.6 metres wide and 14.5 metres deep. Rehabilitation efforts being performed on
Jan 1, 2016
-
Case Study: Soil Setup For Piles Driven Into Eastern Coastal Plain Deposits In VirginiaBy Sushant Upadhyaya, Deniz Karadeniz, Ahmed Mohamed
Soil setup analysis provides opportunities for efficiencies in pile foundation design and installation. Soil setup gain with time was evaluated as part of the foundation design and installation for tw
-
Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)By I. D. Dayal, Anil Kumar Jain
"Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat
Jan 1, 2016
-
Assessment, Remediation And Acceptance Of Drilled Shafts Through The Use Of Csl TestsBy Bernardo J. Jiménez Vega, Edy L. T. Montalvan PhD
The experience gained during more than 900 Crosshole Sonic Logging (CSL) tests on drilled shafts shows the importance of establishing proper project acceptance and repair protocols. Drilled shaft eval
Oct 1, 2022
-
Load Tests on Drilled Shafts at Goethals Bridge ReplacementBy John P. Turner, Steven S. Dapp, Dan A. Brown
"The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY is supported on over 200 drilled shaft foundations ranging in diameter from 4.5 ft
Jan 1, 2016
-
Lessons Learned From Construction Of A Tire Plant In Karst, Ns2 Tires, White, GaBy Robert L. Goehring, Fred Munene
This case history for three major additions to a tire manufacturing plant in north Georgia discusses the impact of highly variable Karst (sinkhole) geology on both foundation design and construction.
-
Special Construction and Geotechnical Considerations in Deep Foundation of Vaudreuil-Soulanges Hospital Center in Greater Montreal AreaBy Marcel Martineau, Vincent Landry, Simon Didone Arseneau, Ali Fallah Yeznabad, Damien Lamblot, Mathieu Cattone, Habib Akande, Marion Bouet
Vaudreuil-Soulanges Hospital Center in Greater Montreal area is a substantially large construction project with challenging schedule and geological conditions. The foundation consisted of 519 piles wi
Oct 7, 2024
-
Numerical Modeling of Foundation Deformation Due to Fault Rupture (718b3bb2-ba73-41ae-ad4b-2a32fb89742b)By Orestis Zarzouras, Amalia Giannakou, Jacob Chacko
"When designing structures in seismically active areas, foundations of critical structures are typically located away from known faults. Indeed many seismic codes prohibit construction in the immediat
Jan 1, 2017
-
Innovation In Spliced Prestressed Piles: Testing And Use Of The Emeca Pile SpliceBy John C. Ryan
The Emeca Pile Splice, an innovative mechanical prestressed concrete pile splice, is the first robotically welded splice to be fabricated in the United States. An analytical and experimental study wa
Jan 1, 2010
-
Full Waveform Inversion of Cross-Hole Stress Waves for Structural Integrity Testing of Drilled ShaftsBy Joseph T. Coe, Alireza Kordjazi, Michael Afanasiev
Cross-hole sonic logging (CSL) is a common quality assurance measure for the evaluation of the structural integrity of drilled shafts. The results of CSL can be supplemented by a set of tomographic im
Jan 1, 2019
-
Foundation Design And Construction Challenges For The Phoenix Sky Train ProjectBy John C. Niedzielski
The PHX Sky Train is a five mile long automated people mover system located at Phoenix Sky Harbor International Airport. Phase I of the PHX Sky Train includes the design and construction of 227 drill
Jan 1, 2010
-
Atlantic Wharf: Redevelopment Of A Historic Site On Boston's WaterfrontBy Lee S. Vanzler
Atlantic Wharf involved the construction of a six-level underground parking garage and a 32-story high rise tower along the historic Boston Harbor waterfront. The site, historically known as ?Russia W
Jan 1, 2011
-
Permeation Grouting of a Subsidence Impacted Watercourse in the Southern CoalfieldsBy Glynn Price
Myrtle Creek has been impacted by the subsidence associated with longwall mining at Tahmoor Coking Coal Mine in Picton, NSW. Specific impacts are fracturing of the rock bed resulting in a reduct
Oct 7, 2024
-
Bi-Directional Load Test (BDLT) for the New Headworks Facility Project in San Francisco, CaliforniaBy Joseph Seibold, Kavin Khatri, Siobhan O'Reilly-Shah, Neel Neelakantan
San Francisco’s New Headworks Facility Project consists of the design and construction of a state-of-the-art Headworks Facility designed to treat up to 250 million gallons of wastewater a day. T
Oct 7, 2024
-
Downdrag Effects on the Pile Groups Supporting Bridge AbutmentsBy M. Hesham El Naggar, Tony Sangiuliano, Alper Turan
"Bridge abutments supported on pile foundations are often constructed over weak and compressible soils. The consolidation settlements induced by the embankment loads are known to result in downdrag an
Jan 1, 2015
-
Large-scale Shake Table Experiment On The Performance Of Helical Piles In Liquefiable SoilsBy Athul Prabhakaran, Ramin Motamed, Ahmed Elgamal, Milad Jahed Orang, Reza Boushehri
Documented case histories from past earthquakes have exhibited the devastating effects of the liquefaction phenomenon on the performance of buildings that are often presented in the form of excessive
-
Detecting Cement Mixing Pile with Cone Penetration Test in the Reserved HoleBy Wu Jian-tao, LI Guo-wei
"The Cement Mixing Pile (CMP) quality assurance assessment is an important programme in evaluating the efficiency of foundation improvement. Coring is the current specified method of quality assessmen
Jan 1, 2015
-
High Capacity Grouted Helical PilesBy Mohamed A. Mansour, Ahmed M. Soliman, M. H. El-Naggar
"Grouted helical piles allow significant increase in pile capacity with low additional cost over that of conventional helical piles. They can be particularly advantageous in sites where installation d
Jan 1, 2016
-
Post-Liquefaction Settlement Reduction Due to Vertical Reinforcement of Aggregate PiersBy Francisco Humire
Contemporary design criteria for ground improvement supporting structures frequently specify a maximum post-liquefaction reconsolidation settlement value. Typically, those settlement values are evalua
Oct 7, 2024
-
Comparing Conflicting Conclusions from Different Integrity Testing Methods on the Same Drilled ShaftsBy Alex Ryberg, Matthew L. Becker
Several integrity testing methods exist which may be used to evaluate drilled shafts. Each test method has advantages and limitations. On occasion, the results from different test methods may lead to
Sep 8, 2021