Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Old Sewer, Big Risks: Managing Risks During The Design And Construction Of A 21-Story Building Adjacent To A Critical 100-Year-Old Sewer StructureBy Damian R. Siebert
Risk-reduction measures implemented during the design and construction of a 21-story pile-supported building adjacent to a below-grade 100-year-old sewer structure were keys to a successful foundation
Jan 1, 2011
-
Seattle Shored Excavation - Design, Construction, MonitoringBy David Winter
The geotechnical design, construction, and monitoring aspects of a tied back excavation 85 feet deep in Seattle, Washington are presented. The excavation was completed in overconsolidated deposits of
Jan 1, 1987
-
Slope Stabilisation Of A Section Of The Thirlmere Aqueduct By The Use Of Spaced Micropiles And Permeation GroutingBy David Preece
The Thirlmere aqueduct was constructed over 110 years ago to provide water from the Lake District (in the north-west of England) to the city of Manchester some 60 miles (100 km) away. The aqueduct rem
Jan 1, 2011
-
High Risk Control For Piling And Deep Foundations - A Systematic ApproachBy Martin van Staveren
In today's rapid changing construction world, the business pressures on piling and deep foundations reach sky-high levels. Ever increasing complexity of construction projects do severely contribu
Jan 1, 2006
-
A Case Study Of Passive Piles Failure In Open ExcavationBy S. T. Kok
This paper presents a case study in West Malaysia for passive piles failure in very soft marine clay in open excavation. In this particular case, the thickness of the very soft marine clay ranges from
Jan 1, 2009
-
An Overview Of Soil Mixing In The United States ? IntroductionBy Peter J. Nicholson
Since the reintroduction of soil mixing to the United States over 10 years ago, the work installed by soil mixing technology has grown dramatically. From an annual turnover of less than ten million do
Jan 1, 2001
-
Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - IntroductionBy Philip Bonanno
The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3
Jan 1, 1994
-
Experiences From The Italian High Speed Rail Network AV ConstructionBy Vincent Jue
In December 2009, the Italian High Speed Rail Network AV began running over the full 1000 km system length from Turin, at the foothills of the Alps to Salerno, on the seacoast south of the volcano Mt.
Jan 1, 2010
-
Deep, Large Diameter Bored Piles In Hong Kong, Two Selected Cases - SynopsisBy Yvone Franco Crosato
The dense population of Hong Kong requires the construction of tall buildings in reclaimed areas or perched on the slopes of the many hills. The large loads to be supported are carried by deep foundat
Jan 1, 2000
-
Review Of The Methods Used To Construct Large Diameter Bored Piles For Top Down ConstructionBy J. D. Findlay
The demands on development in London in recent years has led to the increasing use of top down construction methods in which there is a requirement to place steel columns to high tolerances into large
Jan 1, 1989
-
EFFC-DFI Geotechnical Carbon Calculator ProjectBy Vincent Joannes, Marine Lasne, Luca Brenelli, Colin Serridge, Inge van Baardwijk, Martin Stanley, Anthony Fisher, Mary Ellen Bruce, Tony Suckling, Pedro Avellanosa
"Abstract The European Federation of Foundation Contractors (EFFC) and Deep Foundations Institute (DFI) developed a sector-specific carbon accounting methodology and associated “carbon calculator” for
Jan 1, 2014
-
Comparison of Static and Dynamic Load Tests on Bored Piles in Glacial SoilBy Matthias Baeßler, Markus Herten, Ernst Niederleithinger, Steven Georgi
"Abstract: BAW and BAM have performed a large scale comparison and calibration test on static and dynamic load capacity evaluation of bored piles in glacial sandy soil. The test was performed using ei
Jan 1, 2014
-
O Street Anchored Precast Lagging And Soldier Pile Retaining WallBy John Wise
Significant movement to an existing slurry wall which serves as a retaining wall on 'O' Street in Southeast Washington, D.C. initiated the Department of Public Works for the District of Colu
Jan 1, 2003
-
Marine Foundation Retrofit For The Richmond - San Rafael BridgeBy Patrick E. Durnal
A joint venture of Ben C. Gerwick Inc., Sverdrup (now Jacobs) and DMJM (now DMJM Harris) designed the $779 mill seismic upgrade of the Richmond - San Rafael Bridge over the San Pablo Bay in the San Fr
Jan 1, 2013
-
Design and Construction of the Summit Senior Care Facility into the Side of an Unstable California HillsideBy Patrick O. Shires, Harry W. Schnabel
With stable building sites becoming scarce in the greater San Francisco Bay Area, the new Summit Senior Care Facility is being built into the side of an unstable hillside adjacent to the San Ramon Reg
Jan 1, 2018
-
Measured And Predicted Response Of Laterally Loaded Piles - SynopsisBy K. Mallikarjuna Rao
There are several methods available to estimate deflection and ultimate Capacity of laterally loaded piles. In this investigation an attempt has been made to verify the existing methods for prediction
Jan 1, 1996
-
Design and Installation of Gudrun Platform Jacket PilesBy Gunhild Hennum, Tewodros Tefera, Gisle Håland, Annette Jahr
"Abstract The Gudrun field is located west of Stavanger in the North Sea at water depth of 109 m. A jacket substructure was selected to support the topside and was installed in 2011. The jacket shall
Jan 1, 2014
-
Minipiles And Jet-Grouting: A Strong Foundation In Parma, ItalyBy Bruno Gemmi
The objective of the ? 200 million ($280 million) project Parma Railways Station-Urban Transformation was the reconnection of the North and South parts of the town by constructing an 80 m (250 ft) wid
Jan 1, 2011
-
Permanent Canal Closures and Pumps Cofferdams – Support of Deep Excavation in Soft Ground Using the Open Cell Sheet Pile SystemBy Ryan Higbie, King Chin, Matthew Anderson, Mike Huggins, Rian Johnson, Dave Sinsheimer
"The Permanent Canal Closures and Pumps (PCCP) project is the capstone piece of New Orleans’ extensive hurricane risk-reduction system constructed following Hurricane Katrina. The project consists of
Jan 1, 2017
-
Interlocking Caisson WallsBy William E. Lardner
Interlocking caisson walls developed from conventional "soldier pile and lagging" shoring. In the latter, the soldier piles receive directly most of the soil load. Natural arches form in the soil behi
Jan 1, 1987