Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Treatment of Gold Mill Effluents with Hydrogen Peroxide: Operating Experience and Costs

    By A. Griffiths, G. Vickell

    "INTRODUCTIONA successful cyanide destruction process has to ensure environmental compliance at reasonable cost. That this is possible with hydrogen peroxide is shown by the fact that over twenty gold

    Jan 1, 1989

  • CIM
    Island Copper Mine Milling for Copper and Molybdenum

    By Chris Brown

    "The Island Copper plant was designed and built by Fluor Utah Ltd, in conjunction with Utah design staff, Originally designed to treat 33,000 tons/day (t/d) of ore, the current average milling capabil

    Jan 1, 1975

  • CIM
    An undergraduate pilot plant experience

    By L. J. Heaslip, J. M. Toguri, T. R. Meadowcroft, R. L. Addinall

    """Pilot Plant Operations"" is a final-year core course given to the Metallurgy and Materials Science students at the University of Toronto. This course involves a laboratory study of an industrial pr

    Jan 1, 1980

  • CIM
    Grinding Circuit Improvements at Barrick Goldstrike’s Roaster Facility

    By Jim Wickens, Andy Cole, John Pekrul

    "The roaster facility at Barrick Goldstrike Mine treats double-refractory sulfidic/carbonaceous gold ore. Prior to oxidation in the roasters, the ore is ground in two parallel dry grinding circuits ut

    Jan 1, 2003

  • CIM
    Circuit Consolidation at Pine Point Mines Limited Pine Point, N.W.T.

    By R. E. Jones

    "INTRODUCTIONCominco Limited, one of the free world's largest producers of lead and zinc having majority ownership in Pine Point Mines Ltd., operates a mining and concentrating complex on the south sh

    Jan 1, 1982

  • CIM
    Drill-to-Mill Increased Mill Throughput at Barrick Goldstrike from Efficient Drilling and Blasting

    By Roy McKinstry, Mark Rantapaa, Thomas Bolles

    "More efficient drilling and blasting techniques have shown measurable improvements in throughput at the Barrick Goldstrike wet grinding mill.A decrease in throughput at the autoclave, due to increasi

    Jan 1, 2004

  • CIM
    The Impact of Coastal and Marine Mines on Seabed Biological Resources: Engineering Needs for Sustainable Recovery and for Use of the Resources after Mining Ceases.

    By Derek V. Ellis

    Coastal and marine mines affect the seabed?s biological resources, eg fisheries, when large volume wastes such as tailings are placed on the seabed, and by the extraction processes from marine mining.

    May 1, 2002

  • CIM
    Intégration De La Désulfuration Dans La Restauration Des Sites Miniers Générateurs De DMA

    By Bruno Bussière

    Le drainage minier acide (DMA) provenant de la circulation des eaux à travers les rejets miniers sulfureux est sans doute le principal problème environnemental auquel est confrontée l?industrie minièr

    Nov 1, 2002

  • CIM
    PGM Ore Processing at Impala’s UG-2 Concentrator in Rustenburg, South Africa.

    By Eugene Nel, Johan Theron, Chris Martin, Hans Raabe

    "Impala Platinum Limited is the world’s second largest platinum producer, producing more than 1.7 million ounces of the precious metal last year, much of this from the UG-2 reef located in the Bushvel

    Jan 1, 2004

  • CIM
    THE SSW PROBE: A new High-Tech Tool to Raise Ore Grades by Reducing Dilution Within Metal Mines.

    By Pierre Gaucher

    It is possible to selectively mine an orebody by combining the use of the SSW probe with any bulk mining methods as well as narrow vein exploitations. In other words, thanks to the use of the SSW prob

    Oct 1, 2001

  • CIM
    A Simple Gravity-Recoverable Gold Test

    By Jason Clarke, André R. Laplante

    "The gravity-recoverable gold (GRG) ore characterization test was developed 15 years ago and has been applied to hundreds of ore samples. The test accurately determines the size distribution of GRG, a

    Jan 1, 2006

  • CIM
    The David Bell Mine Water Quality Management Strategy (e343643b-635a-4023-9840-0613ce7068b5)

    By K. Meyer, M. E. Goddfellow

    "At Teck-Corona Operating Corporation's David Bell Mine, a water quality management strategy is employed to produce both a chemically and biologically clean effluent prior to discharge to the environm

    Jan 1, 1991

  • CIM
    A review of dry cover placement on extremely weak, compressible tailings

    By A. T. Jakubick, A. MacG. Robertson

    This paper reviews key issues related to the placement of dry (soil) covers on extremely weak, compressible fine tailings. The design and construction of soil covers on such tailings often presents a

    Jan 1, 2000

  • CIM
    Frozen Lump Generation of Oil Sands ? Climatic Challenges and Solutions

    By Derek J. Cyr

    Climate has an immense impact on the properties of Athabasca oil sands and the ease or difficulty with which it is excavated and extracted. During the winter months, exposed oil sands surfaces freeze.

    May 1, 2004

  • CIM
    Semi-Autogenous Grinding Circuit Reduces Capital Costs

    By H. C. Counsell, R. Webber

    "The mill at Denison Mines' Elliot Lake Operations started up in 1957, with a capacity of 6,000 tons per day. Over the years various plant modifications expanded th.is to 7 500 tons per day. In 1976,

    Jan 1, 1984

  • CIM
    Is Your Management Control Loop Functioning

    By John D. Campbell

    "IS YOUR MANAGEMENT CONTROLLOOP FUNCTIONINGMineral processors make use of hundreds of control circuits in their mills, process plants, smelters and refineries, to optimize throughput and recovery and

    Jan 1, 1985

  • CIM
    Process Improvements at Placer Dome Campbell Mine

    By K. Norris

    "The Campbell mill has undergone numerous changes over the past 43 years. However the rate of change has increased significantly in the last 4 years. A new grinding circuit, carbon-in- pulp circuit, p

    Jan 1, 1992

  • CIM
    In Situ Condition Monitoring of a Rail-based System

    By Jeffrey L. Pagnutti

    Train derailment can lead to loss of capital, damage to the environment, and loss of life. Machinery condition monitoring techniques can be used to develop a structural health monitoring system for r

    May 1, 2013

  • CIM
    Gold Milling at Lac Shortt

    By P. Dyas, H. Zouitt, D. M. Smith

    "Falconbridge Copper's Lac Shortt gold mine is located in northern Quebec approximately 300 km northeast of Val D'Or and 100 km west of Chibougamau (Pig. 1). Engineering for the mill commenced in earl

    Jan 1, 1987

  • CIM
    Applications of Engineering Analysis to Improve Tire Management

    By Jie Zhou

    Mining mobile equipment is becoming larger in order to lower operation cost and increase productivity; however, their performance characteristics are often limited by the tire capabilities. Although c

    May 1, 2006