Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Follow-up of Production Equipment Availability and its Contributing Factors in Selected Canadian Underground MinesBy Edith Lafontaine
Modern underground mines operate fleets of mobile production equipment including drill jumbos, long-hole drills, load-haul-dump machines, trucks and bolters. Their availability has a substantial impac
May 1, 2007
-
Evaluation of Level Control System of Cleaner Flotation Columns at Miduk Copper ConcentratorBy M. Massinaei, S. Abasi, M. Oliazadeh
Reliable measurement and control of the pulp-froth interface (froth depth) in the flotation columns is critical to achieve the desired metallurgical performance. Shallow froths result in a reduction o
Jan 1, 2019
-
Autogenous milling — Effects on flotation of Mt. Lyell Copper ore Broyage autogène — Effets sur la flottation du minerai de cuivre de Mt. LyellBy N. C. Clarke, T. Wu, M. le Page, K. J. Henley
In 1994, Gold Mines of Australia acquired the rights to the historic Mt. Lyell copper mine, and commenced a feasibility study into expanding production. The ore was shown in laboratory tests to be ame
Jan 1, 2002
-
Gold Ore Processing at the Musselwhite Mine - Feasibility, design and OperationBy Donald Strickland, Peter Kresin, Dave Hall
"Have your parents or grandparents ever tried to share with you their wisdom and you ignored it because it did not relate to you‘? I have been ignorant and inevitably grew older and wished I had liste
Jan 1, 1999
-
Maximising Concentrate Revenues at the Xstrata Copper Kidd ConcentratorBy G. R. Morin, A. R. Leggett
"In 2010, closure of the Kidd metallurgical plants along with structural changes to the historical ratios of payable metals led to a review of the operating targets at the Kidd concentrator. Previous
Jan 1, 2013
-
Emperical Design of Stopes for the Lower Rodeo OrebodyBy Denis Thibodeau
The selected mining method for the Rodeo lower Zone is slot and slash. Initial design indicated that the stope height should be limited to a maximum of 18 m, thus six levels were needed to extract the
May 1, 2002
-
Analysis of results from a PFC measurement campaignBy P. Desclaux, A. Gosselin
"In 1999, PFC measurements were carried out at Alcan smelters as part of a large measurement campaign led by the Canadian Aluminium Association. Side worked prebake (SWPB) and horizontal stud Söderber
Jan 1, 2002
-
Comparative Metallurgical Performance in Zinc FlotationBy A. W. Stradling, M. J. Fairweather
"The selective flotation of lead, zinc and iron sulphide minerals is key to the economic performance of concentrators treating zinc-lead ores. Diagnostic metallurgy is a tool to quantify mineral behav
Jan 1, 2003
-
Numerical and experimental study of wedge penetration into oil sandsBy D. D. Tannant
An experimental and numerical study was conducted on the geomechanical behaviour of oil sands during penetration tests in which a steel wedge with an apex angle of either 20 degrees or 30 degrees was
Jan 1, 2002
-
A Generic Study of the Capital and Operating Costs for the Recovery of Precious Metals from Refractory Ore"This generic study has been developed in response to the frequently asked question, ""That is the best treatment route for refractory gold ore?"". The study has developed operating and capital costs
Jan 1, 1989
-
Analyse Du Secteur Minier De La BolivieBy Marc Arpin
La Bolivie possède tout pour réussir. Son vaste territoire de plus d'un million de km2 et qui occupe une position stratégique au coeur du continent sud-américain recèle des ressources naturelles
May 1, 2001
-
Operation of Enviro Clear Thickeners in Series as CCD UnitsBy L. W. Hamel
"Two 35 foot diameter enviro clear thickeners were tested in series as CCD units from June until October, 1978. Up to shutdown in July, we ran with automatic bed level control via the level probes and
Jan 1, 1979
-
Deep Bed Thickener Operation at the EKATITM Diamond MineBy T. G. Paradis, C. A. Mohns
"This paper summarizes the Wren CAT (Clarifier and Accelerated Thickener) deep bed thickener operation at the EKATITM Diamond Mine in Canada’s Northwest Territories. EKATITMs’ thickener project is pre
Jan 1, 2000
-
A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit MiningBy Jiwen Zhang
Abstract Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queu
Oct 1, 2009
-
A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit MiningBy Jiwen Zhang
Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queuing networ
Oct 1, 2009
-
The Grande Cache Coal projectBy P. Cain, B. Martens
"Grande Cache Coal (GCC), an investor-owned Alberta company, is in the final stages of the regulatory process leading to the resumption of coal mining in the Smoky River Coal Field of Alberta. Althoug
Jan 1, 2002
-
Dynamics of Canadian coal supplyBy D. O. Downing
"The 1990s saw enormous changes in the Canadian coal industry and the future promises to be no less turbulent. While the markets served by Canadian coal producers have changed and buying practices con
Jan 1, 2002
-
Challenges to overcome in applying information technology in the mining industryBy A. P. Schissler
Mining has several characteristics, uncommon in other business sectors, which pose additional challenges to the implementation or design of IT and management systems that use the information. Understa
Jan 1, 2006
-
Probabilistic practical optimization of production scheduling for multi-element depositsOptimizing production scheduling in open pit mines is important for managing cash flows of mining operations. This paper describes a new, probabilistic, mixed integer programming (MIP) formulation whi
Jan 1, 2006
-
Recent Improvements in Grinding at the Williams MineBy T. R. Raponi
"The Williams Mine, Canada's largest gold mine, processes over 6,000 t/d of ore utilizing SAG/ball milling, leaching and CIP, carbon stripping, electrowinning and refining to produce gold dare bullion
Jan 1, 1994