Nineteenth-century Nova Scotia iron worksBy Christopher Andreae
Years before iron and steel works were established at Sydney, several thriving although short-lived iron works operated in Nova Scotia. These furnaces reflected the general nineteenth-century North Am
Jan 1, 1999
-
A Dual Bound Approach To Damage-Based Finite-Element Modeling Of Tube HydroformingBy C. Butcher
Numerical simulations of straight tube hydroforming of a dual phase steel were performed using both upper and lower bound constitutive models for porous ductile materials. The Gurson model is based up
Jan 1, 2010
-
Field Trials of a Shaft Conveyance Monitoring SystemBy Michael J. Beus
The National Institute of Occupational Safety and Health-Spokane Research Laboratory (NIOSH-SRL) have developed a Shaft Conveyance Monitoring System (SCMS). Assessment of current hoisting technology h
May 1, 2001
-
Discrete Event Simulation of Mine Equipment Systems Combined with Reliability Analysis Based On Genetic AlgorithmsBy Greg Yuriy
This paper discusses research carried out by the Laurentian University Mining Automation Laboratory (LUMAL) in the field of discrete-event simulation of mine equipment systems and reliability assessme
May 1, 2003
-
Busbar Section OptimizationBy D. P. Ziegler
Formulas relating economic optimum busbar cross sectional areas to busbar cost, electric price and financial parameters are reviewed and revised. Application of the formulas is illustrated with discus
Jan 1, 2006
-
Vesta MineBy Phil Keele
"Manalta Coal Ltd. 's Vesta Mine will supply Alberta Power Limited's 740 MW Battle River Generating Station with 1 128 000 tonnes of sub-bituminous ""C"" coal in 1983. Mana/ta Coal Ltd. and Alberta Po
Jan 1, 1985
-
Ball Mill Overload Detection AlgorithmsBy D. Sbarbaro
In many modem concentrators the use of supervisory systems in their grinding circuits has meant more consistent operations and increases in capacity. These systems rely on a series of specific algorit
Jan 1, 2007
-
Processing of Copper Sulphide Ores and Concentrates Resulting in the Production of High-Grade Matte and Rejected Slag in one Unit - Two-Zone V Aniukov FurnaceBy V. F. Kozyrev, L. B. Tsymbulov, L. Sh. Tsemekhman, A. N. Golov
Gipronickel Institute, JS has developed a new process and equipment for melting copper raw material in a two-zone Vaniukov furnace resulting in the production of white matte and low-grade slag in term
Jan 1, 2007
-
An Application of the Theory of Metallogenesis to the Prospecting Areas of ManitobaBy J. S. De Lury
The metalliferous areas of Manitoba have been described in more or less detail. Since the descriptions were written some new prospects have come to light and considerable mining development has taken
Jan 1, 1925
-
Criteria for silo design in backfill operation"In developing a backfill system handling tailings feed to and from the storage silo, it is necessary to establish a slurry laboratory to develop the technology and silo design criteria. This paper pr
Jan 1, 1997
-
Hot Forging Process Simulation for Aerospace Aluminium Alloy Using a Modified Johnson-Cook EquationBy A. Gakwaya, K. Ba, M. Guillot, J. Levesque
"In the aerospace industry, parts requiring tight dimensional tolerances and high mechanical properties are often produced by forging. This forming process allows for an optimal use of the material an
Jan 1, 2016
-
Mettop Process Control and Regulation SystemBy I. Filzwieser, A. Filzwieser
The Peirce Smith converter is the key metallurgical vessel in the majority of copper smelters. During the two step process, oxygen enriched air is injected through a row of tuyeres into the matte rece
Jan 1, 2007
-
The Geology of the Waite-Ackerman-Montgomery Ore DepositBy Rodgers Peale
The Waite mine, as it is locally termed, is situated in the Rouyn district, in the townships of Duprat and Dufresnoy, Quebec, and lies about 340 miles north of Toronto. Due to the impetus given prosp
Jan 1, 1931
-
Regal Silver MineBy C. S. Lord
"The Regal Silver mine is 5 miles north-northwest of Albert canyon; a station on the main line of the Canadian Pacific railway; 21 miles east of Revelstoke; British Columbia.Development, commenced in
Jan 1, 1954
-
Tailing Disposal at the Sullivan Concentra torBy A. L. Irwin
THE disposal of tailing or waste material, which is generally a very large proportion of the ore treated, is a major problem in the location and operation of any concentrating enterprise and especiall
Jan 1, 1939
-
Laboratory Investigation of Stress Gradient Effect at Spalling Experiments on GraniteBy L. Jacobsson, J. E. Lindqvist
A series of laboratory tests were conducted to study stress-induced spalling on medium to coarse-grained granite specimens. The specimens made from cylinders had two manufactured notches on opposite s
Jan 1, 2015
-
Measuring, Predicting and Managing Grinding Media Wear (9876220d-bfc9-4061-8977-6c93ce000242)By J. Seidel
In 2009 Newmont Mining Corporation’s annual global spend on grinding media reached $94M USD, having doubled in the five years since 2004. The major contributing factor to the spend escalation during t
Jan 1, 2012
-
Integration and Analysis of Airborne Geophysics and Remote Sensing Data of Sar Cheshmeh Area, Using Directed Principal Component AnalysisBy M. Honarmand, Z. Moezifar, H. Ranjbar
Abstract - The Sar Cheshmeh area covers an area of 640 km2, and is located in the southern part of the Iranian Volcanic-Sedimentary Belt. ETM+ images have been used for alteration mapping. The Crosta
Jan 1, 2002
-
Training Program Development at the Kidd Creek Concentrator"The Kidd Creek concentrator is situated adjacent to Highway 101, twenty-four kilometres east of the center of the city of Timmins, Ontario. Sulphide ore, received by train from the minesite twenty-ni
Jan 1, 1981
-
Analysis of Potential Failure Mechanisms during the Construction of a Rockfill Dyke on a Submerged Tailings BeachBy Edouard Masengo
A long dyke will be constructed in a lake with rockfill placed by end dumping method. Its crest will be at elevation 521.5 m compared to the nominal lake level at 520 m. In the first portion, its heig
May 1, 2003