Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Mining the Retreat Zone Between Two Converging Pyramids at Noranda?s Bell-Allard Mine

    By Véronique Falmagne

    The mining sequence at Noranda?s Bell-Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modeling

    May 1, 2003

  • CIM
    A New Curriculum Prepares Future Engineers in Mineral Processing and Extractive Metallurgy at Laval University

    By Daniel Hodouin, Claude Bazin, René del Villar

    "A traditional linkage has long been established at Laval University's Department of Mining & Metallurgy between the Mineral Process (MP) and the Mining Exploitation (Min) on one hand, and between the

    Jan 1, 1999

  • CIM
    Improvement of Elements of Safety Culture in KGHM Glogów Copper Smelter

    By Gabka T., R. E. Gregorczyk

    Work to improve employees' behavior in Głogów Copper Smelter began in 2009. It has been noted that over 90% of accidents at work are attributable to human reasons. At that time, a series of external w

    Jan 1, 2019

  • CIM
    Pilot Plant Testing for Column Flotation Circuit Design

    By G. A. Kosick, G. S. Dobby, O. Matwijenko

    "A 100 kg/hr portable flotation pilot plant has been operated at Kidd Creek Mines with the objectives of:(a) determining performance expected by column flotation circuits on primary zinc and copper cl

    Jan 1, 1990

  • CIM
    Application of the SART Process to Heap Leaching of Gold-Copper Ores at Maricunga, Chile

    By Kevan J. R. Ford, Chris A. Fleming, Robert D. Henderson

    "Kinross Gold Corporation’s Maricunga mine in Chile presents an ideal opportunity to apply the SART process to a heap leach operation. Given increasing levels of cyanide complexed copper in current pr

    Jan 1, 2008

  • CIM
    Production of Paste from Total Tails in a Deep Cone Thickener A Case Study

    By Gregg Hodges, Fred Schoenbrunn, Steve Slottee, Chad McCleary

    "In December, 1999 Stillwater Mining Company (SMC) commissioned a new paste /cement backfill plant to supplement the existing sand backfill system for the cut and fill mining operation at it’s Nye, Mo

    Jan 1, 2001

  • CIM
    Prospects for Industrial Development in Cape Breton

    By John A. Teeter

    "A SHORT WHILE AGO I enquired about The Mining Society of Nova Scotia. In all honesty I was apprehensive about addressing such a body if it was highly geared to the technical aspects of discovering an

    Jan 1, 1972

  • CIM
    An Update on Reaching Nameplate Throughput and Continuous Improvement at Mount Milligan

    By J. Yue

    "Mount Milligan mine is located in northern British Columbia. The concentrator employs conventional SABC grinding circuit with bulk sulphide flotation processes. Commissioning started in September of

    Jan 1, 2017

  • CIM
    In situ testing in underground backfilled stopes

    By Malcolm Scoble, Jean-Marc Robert, Luciano Piciacchia

    "An approach to the in situ testing of mine backfills is outlined. It has been developed to provide a measure of the effective strength and stiffness of such materials after placement in stopes. This

    Jan 1, 1987

  • CIM
    Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing Circuit

    By Dave Rose, David G. Meadows, Mike Westendorf

    "Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a

    Jan 1, 2016

  • CIM
    Low-Grade Cu-Au Deposits: Predicting the Relationship between Copper and Gold Performance in Flotation and the Potential for Gravity Gold Recovery

    By Jan E. Nesset, Phillip J. Mackey, Joo Y. Kim, Giovanni Di Prisco, André R. Laplante

    Understanding the appropriate gold recovery to associate with copper recovery when assessing laboratory testing on porphyry deposits is often complicated by several factors including variable and/or c

    Jan 1, 2005

  • CIM
    Improving Concentrate Grade through Smart Design and Piloting

    By T. Strong

    "Selectively recovering pentlandite from high levels of pyrrhotite presents a technical and operational challenge. The liberation characteristics and also the chemical environment is critical to perfo

    Jan 1, 2017

  • CIM
    Galvanic Interaction and Particle Size Effects in Self-Heating of Sulphide Mixtures

    By Jan E. Nesset, James A. Finch, Frank Rosenblum, Rebecca Payant

    "Under certain conditions of moisture and oxygen, sulphides can spontaneously heat, a phenomenon known as self-heating. In this paper, we test a hypothesis that galvanic interaction between some sulph

    Jan 1, 2011

  • CIM
    Review of Comminution Practice

    By Ronald E. Hamilton

    "An attempt to review the recent literature on comminution reveals at once that the subject has many ramifications and that the applications are so diverse that there are very few general statements w

    Jan 1, 1976

  • CIM
    Vision for a Risk Adverse Integrated Geometallurgy Framework

    By Guillermo Turner-Saad

    "Best practice in the economic evaluation of mining projects and operations is based on the integration of geological, mining, metallurgical, environmental, marketing, economic and corporate informati

    Jan 1, 2010

  • CIM
    Moly Upgrading Profiles with Flotation Columns

    By R. Amelunxen

    "The molybdenite associated with copper porphyry ores is generally treated in a flotation circuit consisting of a separation and a cleaning section. In the last few years column flotation cells have r

    Jan 1, 1990

  • CIM
    DynoMiner? APS Gassing Trials Stillwater East Boulder Mine

    DynoMiner APS Delivery Systems Overview ? New Design of DynoMiner APS-M2 ? Stand alone or attach to Cargo type 10,000 lb (4536 kg) emulsion bins. ? Hose reel w/200-ft (61-m) by 1-inch I.D (25-mm)

    May 1, 2004

  • CIM
    The ACACIA Reactor Improving Gravity Recovery!

    By Ish Grewal

    The ACACIA Reactor - Introduction What is it? The Acacia Reactor is a fluidized bed high intensity cyanide leaching system. Purpose for its existence? The Acacia Reactor was developed to treat hig

    May 1, 2002

  • CIM
    A hydrometallorgical process for the extraction of copper

    By W. A. Ahrens, J. H. McNamara, J. G. Franek

    "An economical, pollution-free process has been developed for the hydrometallurgical extraction of copper from sulphide ores. The extracted copper, in the form of cuprous chloride (CuC/), is converted

    Jan 1, 1980

  • CIM
    Study the Effect of Crystal Structure on Milling and Liberation Performance of Minerals

    By R. Venugopal, Saxena. V. K., U. Sankrityayan

    "There is a dire need of a technology which can break the mineral interfaces to enhance liberation with minimum energy consumption in mineral beneficiation processes. Understanding of mineral crystal

    Jan 1, 2013