Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Optimization of Capital Cost and Smelter Revenue - Integrated Team Rebuild of Barro Alto Furnaces

    By K Belanger, J. Mclachlan, F. Stober, G. Norval, B. Snider, A. Munsch, T. Koehler, E. Piantino, J. Carlos Queiroz

    The project to rebuild the smelting furnaces at the Anglo American - Barro Alto ferronickel smelter, located in Goias, Brasil, was initiated in September 2013. To optimize the capital cost, while maxi

    Jan 1, 2015

  • CIM
    Commercial Aspects of Gold Applications : From Materials Science to Chemical Science

    By Christopher W. Corti

    A major aim of the GOLD 2003 conference, is to promote new gold related science and technology with a view to developing new useful industrial applications for gold. Current industrial uses have provi

    Oct 1, 2003

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike

    By M. Rantapaa

    Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike (TECHNICAL PAPER)

    By R. Mckinstry, M. Rantapaa, T. Bolles

    "Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis

    A mine's inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. Th

    Jan 1, 2004

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis, B. Sambirsky, J. Werner

    A mine’s inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. The inh

    Jan 1, 2004

  • CIM
    Design of the Pierina Waste Dump

    By P. Mark. Hawley

    Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa

    May 1, 2002

  • CIM
    Computer Control of Flotation Circuits at Frood Stobie Mill

    By G. Styles, K. Lye, R. Tenbergen, M. Mayhew

    Requirements to produce a higher bulk concentrate grade have necessitated extensive use of on-stream analyser data and computer programming to obtain the targets set for Frood Stobie Mill as required

    Jan 1, 1985

  • CIM
    Aluminum mine shaft conveyances at Inco Ltd. an overview of problems encountered and solutions

    By Richard Mcivor, Largo Albert

    "Inco Limited has operated aluminum mine shaft conveyances since 1968. Aluminum conveyances are used where the hoisting in system requires lightweight conveyances to maintain the hoist rope safety fac

    Jan 1, 1988

  • CIM
    Determination of Metal and Mineral Flotation Performance at one of Falconbridge’s Base Metal Operations

    By Dominic Fragomeni, Tony DiFeo, Martyn P. Hay

    "As part of an investigation into flotation modelling of industrial scale operations, Falconbridge Ltd organised a “blind” test of the SUPASIM flotation model developed by Eurus Mineral Consultants (E

    Jan 1, 2006

  • CIM
    Welcome to Newfoundland

    By Robert B. Parsons

    "The Canadian mining industry is not off to a good start in the 1993/94 budget season. Of the five provinces and territories to table budgets as of March 31, 1993, the industry's scorecard shows:

    Jan 1, 1993

  • CIM
    La Fabrication de fer Préréduit Pour Utilisation au Four à Arc Électrique

    By A. H. Marquis

    Since the start-up of its first Direct Reduction Module in April 1973, S1DBEC has produced over 2 million tons of prereduced iron. During this period, SIDBEC has acquired comprehensive experience in t

    Jan 1, 1979

  • CIM
    Application of Mass Blast Principle for Stope Blasting in Deep Mines

    ?? Intro ?? Mass blast principle ?? LaRonde evolution toward mass blast ?? Overview ?? Mining method ?? Longitudinal ?? LaRonde evolution (2002 to today) ?? Drill and blast design ?? Consumpti

    Feb 1, 2008

  • CIM
    Variable speed SAG milling

    By M. N. Brodie

    "The ability to adjust the speed of a SAG mill offers benefits to the process and to equipment maintenance. It can be provided with some slight effect on availability ranging from somewhat enhanced to

    Jan 1, 2003

  • CIM
    Influence of Highly Permeable Geologic Structure on Inflows to A154 N/S Open Pit Diavik Diamond Mines Inc., Lac de Gras, NWT

    By Jeff R. Reinson

    The Diavik Diamond Mine is producing diamonds from two orebodies, the A154 South and A154 North kimberlite pipes, discovered beneath the waters of Lac de Gras. Innovative dike technology with appropri

    May 1, 2006

  • CIM
    Design of paste tailings disposal systems

    By Fred W. Brackebusch

    "The use of paste technology for surface tailings disposal may offer economic, technical, safety, and environmental advantages for both underground and surface mining operations. Paste is a non-Newton

    Jan 1, 2002

  • CIM
    Tunnelling in Horizontally Laminated Ground

    By Matthew A. Perras

    With growing populations, infrastructure projects are utilizing underground space to expand transportation networks, water supply and sewer disposal systems and hydropower facilities. These new projec

    May 1, 2009

  • CIM
    Flotation and Hydrometallurgy Research on Brunswick Tin Mine Ores

    By E. W. J. Thornton

    During the past six or seven years extensive research has been performed on ore samples procured at the Bruns1,vick Tin Mines which is located in the south-west corner of New Brunswi.ck. This property

    Jan 1, 1977

  • CIM
    Low-Grade Geothermal Potential of the Regina - Moose Jaw Area, Saskatchewan

    By L. W. Vigrass

    Porous and permeable rocks deeply buried in sedimentary basins contain immense volumes of hot water with the potential to supply low-grade heat energy. A part of Canada with sizeable potential for low

    Jan 1, 1979

  • CIM
    Explore the Future of Mining

    By Joe Shoemaker

    Automated Spot Generation ? No Operators below the Highwall ? No Operator Wear and Tear ? Reduced Swing Time ? Single and Double Sided Loading ? Minimized Bench Width

    Aug 1, 2013