The pneumatic vertical conveying of coal by pipelineBy Tweedy. D. H.
"The paper describes the rapid development of, and operational experience in the utilization of, pneumatic low-pressure pipeline hoisting systems to vertically convey raw coal and rock through shafts,
Jan 1, 1982
-
Air Leakage from an Underground Lined Rock Cavern for Compressed Air Energy Storage through a Rubber SealBy Pingyang Zhang, Caichu Xia, Shuwei Zhou, Yu Zhou, Yongsheng Hu
A lined rock cavern (LRC) is an alternative container for compressed air energy storage (CAES) to store high-pressure air that is later used to produce electricity. A critical requirement of CAES in L
Jan 1, 2015
-
Groupe d'objects provenant des Forges du St-Maurice II considérations sur leursaffinités et leur mode d'élaborationBy T. Vovan, A. Galibois, M. Fiset
"In order to establish some links between the 22 specimens found on the site of Les Forges du St. Maurice, their slag inclusions have been analyzed by electron microprobe. Comparison between their con
Jan 1, 1984
-
Beneficiation of Concentrated Ultrafine Suspensions with a Falcon UF Concentrator (CIM Journal | Vol. 2, No. 4)By F. Bourgeois, J. -S. Kroll-Rabotin
ABSTRACT: Falcon concentrators are enhanced gravity separators designed for concentrating fine particles. The Falcon UF model is unique in that it is dedicated to beneficiation of ultrafines, one key
Jan 1, 2011
-
The use of flotation rate data to evaluate reagentsBy G. E. Agar, J. J. Barrett
"Traditionally, batch bench-scale flotation tests have been used for evaluating flotation reagents by comparing the results of tests done with various additions of the reagent in question. Usually, co
Jan 1, 1983
-
Project ImplementationBy Randy McMeekin, Chris Twigge-Molecey, J. Peter Blake
The project implementation phase, FEL4, is generally a complex undertaking. The project has been approved for construction and the capital has been allocated. At this point the project team comes unde
Jan 1, 2015
-
Agile Process Development and Early use of Solvent Extraction in the Mining IndustryBy Nick Hazen
Many successful actions are required to bring a profitable extractive metallurgical operation into production. Competent process development performed within the project development schedule increases
Jan 1, 2014
-
Sustainable Hydrometallurgical Recovery of Valuable Elements from Spent Nickel-Metal Hydride HEV BatteriesBy Åke C. Rasmuson, Mahmood Alemrajabi, Kerstin M. Forsberg, Kivanc Korkmaz
"In the present study the recovery of a Panasonic Prismatic Module 6.5 Ah NiMH 7.2 V plastic casing hybrid electric vehicle (HEV) battery was investigated, separately processing the anode and cathode
Jan 1, 2016
-
Refining of platinum-group metalsBy G. P. Demopoulos
"The recovery and separation of platinum-group metals (PGM) from primary and secondary materials currently attracts a lot of interest due to the high value of the metals and their increasing demand fo
Jan 1, 1989
-
Laurentian Problems and Atomic DisintegrationBy Alfred C. Lane
Reference to the original use of the terms Laurentian and Huronian (and its extension), shows that the former was applied to granitized sedimentary and metamorphic pre-Cambrian rocks, and the gneissoi
Jan 1, 1925
-
Calibration of a Dynamic Model for an Industrial Comminution CircuitBy Eric Poulin, Anthony Clapperton, Jocelyn Bouchard, Jaime Cristobal Rojas-Montes, Benjamin Legare
"Several grinding mill dynamic simulators have been developed in the last half-century. However, complete circuit simulations are mainly limited to academic investigations, and on-site applications fo
Jan 1, 2016
-
Bacterial corrosion studies at Ontario HydroBy A. C. Headon, K. W. Lam, D. P. Dautovich
"Microbiological activities affecting the performance of materials have been encountered in diverse situations within Ontario Hydro. Case histories of bacterial problems which are presented include gr
Jan 1, 1984
-
Diesel-generating plant waste heat recovery systems at remote locationsBy D. Kovachevich, M. A. Pfeifer
"A t remote locations typical of mines and associated ore processing plants, diesel electric generators are ideally suited for power plants due to their inherent operating flexibility, efficiency and
Jan 1, 1984
-
Metallurgical Characterization of the Collective and Selective Flotation Plants at Minera Los PelambresBy F. Henríquez, V. Iriarte, L. Vinnett, J. Yianatos, F. Díaz
Metallurgical characterizations of the collective (Cu/Mo) and selective flotation plants were carried out in Minera Los Pelambres, Chile. The selective plant allows the valuable minerals of Cu and Mo
Jan 1, 2015
-
The application of residence time distributions to flotation and mixing circuits (50aced84-3f19-4383-b90c-f475002bcac5)By J. E. Nesset
"This paper discusses the importance of considering residence time distribution (RTD) in the design of flotation and mixing circuits and in the analysis of operating problems. The experiences and succ
Jan 1, 1988
-
The application of residence time distributions to flotation and mixing circuitsBy J. E. Nesset
"This paper discusses the importance of considering residence time distribution (RTD) in the design of flotation and mixing circuits and in the analysis of operating problems. The experiences and succ
Jan 1, 1988
-
Design of refractories and bindings for modem high-productivity pyrometallurgical furnacesBy J. G. Schofield, R. C. Francki, K. M. Donaldson, F. E. Ham
"Developments in pyrometallurgical technology have led to larger furnaces operating under more intense process conditions. In order to maintain the reliability of these furnaces, which are frequently
Jan 1, 1993
-
Proper equipment replacement timing the key to replacement economyBy R. E. Stewart
"Using the concept of economic life and marginal analysis, it can be shown that proper equipment replacement timing can save a mining company many thousands of dollars. To assist management with deter
Jan 1, 1980
-
Tumbler Ridge: a new approach to resource community developmentBy R. A. Rabnett, G. Paget, Patrick Walsh
"Tumbler Ridge, Canada's newest resource community, has been developed differently than have been other resource communities.Since its conceptualization, emphasis has been placed on the establish
Jan 1, 1983
-
Material Characterization – An Absolute Mustfor Predicting The Flow Behaviour Of Your Hazardous MaterialBy C. Holmes, T. Holmes
Engineered-in material handling problems are responsible for significant unrealized value in mineral processing plants. At the root, is a lack of awareness and understanding of bulk material handling
Jan 1, 2020