    The pneumatic vertical conveying of coal by pipeline

    By Tweedy. D. H.

    "The paper describes the rapid development of, and operational experience in the utilization of, pneumatic low-pressure pipeline hoisting systems to vertically convey raw coal and rock through shafts,

    Jan 1, 1982

  • CIM
    Air Leakage from an Underground Lined Rock Cavern for Compressed Air Energy Storage through a Rubber Seal

    By Pingyang Zhang, Caichu Xia, Shuwei Zhou, Yu Zhou, Yongsheng Hu

    A lined rock cavern (LRC) is an alternative container for compressed air energy storage (CAES) to store high-pressure air that is later used to produce electricity. A critical requirement of CAES in L

    Jan 1, 2015

  • CIM
    Groupe d'objects provenant des Forges du St-Maurice II considérations sur leursaffinités et leur mode d'élaboration

    By T. Vovan, A. Galibois, M. Fiset

    "In order to establish some links between the 22 specimens found on the site of Les Forges du St. Maurice, their slag inclusions have been analyzed by electron microprobe. Comparison between their con

    Jan 1, 1984

  • CIM
    Beneficiation of Concentrated Ultrafine Suspensions with a Falcon UF Concentrator (CIM Journal | Vol. 2, No. 4)

    By F. Bourgeois, J. -S. Kroll-Rabotin

    ABSTRACT: Falcon concentrators are enhanced gravity separators designed for concentrating fine particles. The Falcon UF model is unique in that it is dedicated to beneficiation of ultrafines, one key

    Jan 1, 2011

  • CIM
    The use of flotation rate data to evaluate reagents

    By G. E. Agar, J. J. Barrett

    "Traditionally, batch bench-scale flotation tests have been used for evaluating flotation reagents by comparing the results of tests done with various additions of the reagent in question. Usually, co

    Jan 1, 1983

  • CIM
    Project Implementation

    By Randy McMeekin, Chris Twigge-Molecey, J. Peter Blake

    The project implementation phase, FEL4, is generally a complex undertaking. The project has been approved for construction and the capital has been allocated. At this point the project team comes unde

    Jan 1, 2015

  • CIM
    Agile Process Development and Early use of Solvent Extraction in the Mining Industry

    By Nick Hazen

    Many successful actions are required to bring a profitable extractive metallurgical operation into production. Competent process development performed within the project development schedule increases

    Jan 1, 2014

  • CIM
    Sustainable Hydrometallurgical Recovery of Valuable Elements from Spent Nickel-Metal Hydride HEV Batteries

    By Åke C. Rasmuson, Mahmood Alemrajabi, Kerstin M. Forsberg, Kivanc Korkmaz

    "In the present study the recovery of a Panasonic Prismatic Module 6.5 Ah NiMH 7.2 V plastic casing hybrid electric vehicle (HEV) battery was investigated, separately processing the anode and cathode

    Jan 1, 2016

  • CIM
    Refining of platinum-group metals

    By G. P. Demopoulos

    "The recovery and separation of platinum-group metals (PGM) from primary and secondary materials currently attracts a lot of interest due to the high value of the metals and their increasing demand fo

    Jan 1, 1989

  • CIM
    Laurentian Problems and Atomic Disintegration

    By Alfred C. Lane

    Reference to the original use of the terms Laurentian and Huronian (and its extension), shows that the former was applied to granitized sedimentary and metamorphic pre-Cambrian rocks, and the gneissoi

    Jan 1, 1925

  • CIM
    Calibration of a Dynamic Model for an Industrial Comminution Circuit

    By Eric Poulin, Anthony Clapperton, Jocelyn Bouchard, Jaime Cristobal Rojas-Montes, Benjamin Legare

    "Several grinding mill dynamic simulators have been developed in the last half-century. However, complete circuit simulations are mainly limited to academic investigations, and on-site applications fo

    Jan 1, 2016

  • CIM
    Bacterial corrosion studies at Ontario Hydro

    By A. C. Headon, K. W. Lam, D. P. Dautovich

    "Microbiological activities affecting the performance of materials have been encountered in diverse situations within Ontario Hydro. Case histories of bacterial problems which are presented include gr

    Jan 1, 1984

  • CIM
    Diesel-generating plant waste heat recovery systems at remote locations

    By D. Kovachevich, M. A. Pfeifer

    "A t remote locations typical of mines and associated ore processing plants, diesel electric generators are ideally suited for power plants due to their inherent operating flexibility, efficiency and

    Jan 1, 1984

  • CIM
    Metallurgical Characterization of the Collective and Selective Flotation Plants at Minera Los Pelambres

    By F. Henríquez, V. Iriarte, L. Vinnett, J. Yianatos, F. Díaz

    Metallurgical characterizations of the collective (Cu/Mo) and selective flotation plants were carried out in Minera Los Pelambres, Chile. The selective plant allows the valuable minerals of Cu and Mo

    Jan 1, 2015

  • CIM
    The application of residence time distributions to flotation and mixing circuits (50aced84-3f19-4383-b90c-f475002bcac5)

    By J. E. Nesset

    "This paper discusses the importance of considering residence time distribution (RTD) in the design of flotation and mixing circuits and in the analysis of operating problems. The experiences and succ

    Jan 1, 1988

  • CIM
    The application of residence time distributions to flotation and mixing circuits

    By J. E. Nesset

    "This paper discusses the importance of considering residence time distribution (RTD) in the design of flotation and mixing circuits and in the analysis of operating problems. The experiences and succ

    Jan 1, 1988

  • CIM
    Design of refractories and bindings for modem high-productivity pyrometallurgical furnaces

    By J. G. Schofield, R. C. Francki, K. M. Donaldson, F. E. Ham

    "Developments in pyrometallurgical technology have led to larger furnaces operating under more intense process conditions. In order to maintain the reliability of these furnaces, which are frequently

    Jan 1, 1993

  • CIM
    Proper equipment replacement timing the key to replacement economy

    By R. E. Stewart

    "Using the concept of economic life and marginal analysis, it can be shown that proper equipment replacement timing can save a mining company many thousands of dollars. To assist management with deter

    Jan 1, 1980

  • CIM
    Tumbler Ridge: a new approach to resource community development

    By R. A. Rabnett, G. Paget, Patrick Walsh

    "Tumbler Ridge, Canada's newest resource community, has been developed differently than have been other resource communities.Since its conceptualization, emphasis has been placed on the establish

    Jan 1, 1983

  • CIM
    Material Characterization – An Absolute Mustfor Predicting The Flow Behaviour Of Your Hazardous Material

    By C. Holmes, T. Holmes

    Engineered-in material handling problems are responsible for significant unrealized value in mineral processing plants. At the root, is a lack of awareness and understanding of bulk material handling

    Jan 1, 2020