Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Potential Cadjebut Plant Performance Enhancement by the Air-Sparged HydrocycloneBy Willey GJ
A brief test program was undertaken to assess the viability of air-sparged hydrocyclone beneficiation at the Cadjebut concentrator. Three different process streams were processed (lead rougher feed,
Jan 1, 1993
-
Pre-Strip-Mining by Bucket Wheel ExcavatorsDragline performance drops considerably when chop-down and double handling of material is needed due to increasing overburden thick- ness or total pit depth. Beyond a certain pit depth the dragline
Jan 1, 1981
-
Some Observations on the Minerology and Paragenesis of the Crocidolite Veins at Wittendom Gorge, W.A.The mineralogy of the crocidolite (blue asbestos) veins at Wittenoom Gorge was examined to determine the cause of failure to recover soma of the fibre by the ore-dressing methods currently being pract
Jan 1, 1963
-
Geotechnical Management at the Martha PitSubsidence issues associated with historic mine workings have highlighted the need for enhanced geotechnical management of the Martha pit over the remaining life. In conjunction with a detailed analys
Jan 1, 2004
-
Geochemical and Bacteriological Studies of the Cupriferous Environment at Pernatty Lagoon, South AustraliaA number of small copper deposits occur in the Pernatty Lagoon-Mt. Gunson area. Textural and mineralogical differences distinguished the lagoon sulphide deposits, which occur in a water filled basin o
Jan 1, 1971
-
Selective recovery of very fine particles-future prospectsThe processes most likely to be adopted for beneficiating ores or concentrator streams containing a large proportion of particles finer than 10 um are froth flotation, selective flocculation, wet magn
Jan 1, 1986
-
The use of mercury in small-scale gold mining operations: effectiveness and pollution aspectsBy Maru Y
The use of mercury for amalgamation has been an integral part of the small-scale gold mining industry in developing countries owing to its low investment cost, simplicity of the technique and high gol
Jan 1, 1994
-
Optimisation of Copper Electrowinning at BHASBy Mark C. J
Since the commissioning of the BHAS Copper Plant in 1984 the copper electrowinning operations have not fully met expectations. During 1988, a laboratory scale electrowinning unit was constructed to
Jan 1, 1989
-
Fundamentals of Open Pit Planning and SchedulingOpen pit planning and scheduling play a significant role in establishing, maintaining and improving the economics of open pit mining ventures.The development of an open pit plan and schedule involves
Jan 1, 1992
-
A Simple Method of Calculating Grouted Rock BoltsBy Yu-Jun Z
According to site measurement and labora- tory experiment, the authors suggest a new mathematical model of grouted rock bolts. The rock bolt is taken as an elastic bar, and the grout is substituted
Jan 1, 1987
-
Geotechnical Aspects of Open Stope Design at BHP CanningtonOpen stoping dimensions are typically controlled by a number of factors including production drilling capacity, scheduling, fill constraints, orebody dimensions and host wall rock conditions. Frequent
Jan 1, 2000
-
Commissioning and Operation of the Pressure Oxidation Circuit at Porgera, PNGPorgera is located in the Central Highlands of Papua New Guinea. Porgera Joint Venture treats a high grade epithennal gold deposit. Most of the gold occurs as submicroscopic particles in a sulphide ma
Jan 1, 1992
-
Drilling and Blasting Through Old Underground Workings at Westside MineBy T Galvin
Drilling and blasting at Westside Mine near Wallsend, NSW, has presented a challenge for Orica Explosives, Australia. The colliery produces 600 000 tonnes of steaming coal per year from two seams usin
Jan 1, 1999
-
Quantifying Evaporation From Soils Using Experimental and Mathematical MethodsBy S M. Mousavi
The issue of estimating evaporation in soils is central to the design of engineered soil caps for mine waste and landfill applications. In general, because evaporation from the soil is difficult to me
Jan 1, 2003
-
Two Stage Iron Purification of Zinc Plant SolutionsBy Kershaw MG
At the Risdon plant of the Electrolytic Zinc Company of Australasia Limited, impurities toxic to the electrolytic production of zinc metal, notably arsenic and antimony, have traditionally been coprec
Jan 1, 1985
-
Design Factors Leading to Prevention of Bridged Stopes at Jundee OperationsBy G Lind
Bridging of production stopes in narrow vein gold deposits contributes to significant financial losses and production delays. Bridging is caused when underbreak in the stope production blast occurs, r
Jan 1, 2008
-
Borehole Damage Effect on Stress WavesAccounting for borehole damage in analytical modelling of explosively generated stress waves is important for predicting the finer details of the stress wave patterns observed in the field. The clas
Jan 1, 1990
-
The Effect of Open Pit Scale Economies on the Mt Leyshon Gold MineBy Hodkinson I, Slight M
Over the last five years Mt Leyshon has matured into a sizeable gold mine by Australian Standards. In the later part of 1990, after commissioning of the 3.5 mtpa CIP Plant upgrade, experience indicate
Jan 1, 1992
-
Bacterial Leaching of Chalcopyrite at Low Relative HumiditiesBy Madgwick J. C
Bacterial leaching of museum grade chalcopyrite and chalcopyrite concentrates at low sorptive relative humidities (55-91 per cent rH) was demonstrated. Optimum release rates were 13 and 27 mg/gram/100
Jan 1, 1984
-
Wall Rock Alteration and Geochemistry of the Bulyanhulu Gold Deposit, Tanzania: Preliminary ResultsBy E du Plessis, J Kapusta, J L. Mauk
The world-class Bulyanhulu gold deposit (375 t Au) is in the Sukumaland greenstone belt, Northwestern Tanzania. The main mineralised quartz vein structure, termed Reef one, occurs at the contact of fe
Jan 1, 2002