Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Woodsreef Magnesium Project ù An Example of Sustainable Mineral Waste Processing from Mined Ore and its Utilisation to Produce Refined Metal Products

    By N Green

    The production of approximately 550 000 tonnes of æwhiteÆ or chrysotile asbestos fibre between 1972 and 1983 at the Woodsreef Mine in New South Wales left behind 24 million tonnes of tailings and 75 m

    Jan 1, 2002

  • AUSIMM
    Deriving Quantitative Dust Measurements Related to Iron Ore Handling From Airborne Hyperspectral Data

    By P T. Hick, T J. Cudahy, M S. Caccetta

    Dust derived from mining and handling of ore has been identified as a major concern for the mining industry in Australia and may be critical to the future viability of some resource industries (CSIRO,

    Jan 1, 2002

  • AUSIMM
    Nature and Distribution of Gibbsite in Some Western Australian Iron Ores

    By M Paine

    Work to date has shown that the use of Al2O3:SiO2 ratios is suitable for identifying potential gibbsite bearing samples. Subsequent confirmatory XRD analysis helps to refi ne this initial identificati

    Jul 11, 2011

  • AUSIMM
    Benchmarks of Performance for Truck and Loader Fleets

    The cost of production from truck and loader fleets is influenced by management development of the culture of the organisation, work practices, systems and procedures of the production and maintenance

    Jan 1, 1992

  • AUSIMM
    Use of Electronic Detonators at Cracow Gold Mine (cae53c6c-ca7c-4748-be49-2a87f16e60c2)

    By N Strong

    Cracow is a high-grade; low-tonnage underground gold mine located approximately 500 km north-west of Brisbane in Central Queensland. It is a steeply dipping, narrow vein, epithermal gold and silver de

    Jan 1, 2008

  • AUSIMM
    Survey Work in Connection with the Sinking of No. 7 Shaft, Broken Hill South Limited, Broken Hill, N.S.W.

    THE South Mine. owned by the Broken Hill South Limited, occupies mineral leases 7 and 8 on the Broken Hill lode. The ore reserves are 4,250,000 tons, and the ore hauled for the year ended June, 1930,

    Jan 1, 1930

  • AUSIMM
    Control System Improvement Through Alarm Reduction

    By R West

    The Olympic Dam smelter facility processes copper concentrate feed using direct-to-blister smelting technology to support the current site production rate of 225 000 t/a copper. The metallurgical cont

    Jan 1, 2005

  • AUSIMM
    Development of Explosive Monitoring Techniques for Use in Quality Control and Production Blast Analysis

    By Moxon NT, Torrace AC

    The detonation pressure of an explosive is a function of its density and its velocity of detonation (VOD) and relates directly to the degree and manner in which the explosive loads the surrounding r

    Jan 1, 1988

  • AUSIMM
    A methodology for assessing stope design modifying factors for the Olympic Dam Mine

    By S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant

    The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order

    Mar 15, 2021

  • AUSIMM
    Orepass Loss Mitigation Approach in Malmberget Mine

    By A Salama, J Greberg, B Skawina

    In today’s underground mass mining, the orepass is an important part of the infrastructure as it connects two or more mine levels and is used for conveying or storing large amounts of material. One of

    May 9, 2016

  • AUSIMM
    Application of Mining Process Simulation to Reduce Risk, Costs and Improve Operational Performance

    By P Hawkes

    Within the mining industry computers have made their most significant impact with 3D design, visualisation and resource modelling/ optimisation. Recently, the application of computers to data gatherin

    Jan 1, 2003

  • AUSIMM
    The Use of High Pressure Grinding Rolls for Crushing Magnetite

    The paper describes data from test work programs on a range of magnetite ores in Australia and overseas. The analysis looks at the behaviour of material of different sizes fed to the rolls and the cha

    Jan 1, 2009

  • AUSIMM
    Coal Sizing Equipment - Expression and Presentation of Result of Performance Tests

    By Partridge AC

    In order to provide a'valid description of the performance of size classifying equipment it is necessary that a standard procedure be established for testing and for the subsequent expression

    Jan 1, 1984

  • AUSIMM
    The Application of Numerical Modelling to the Assessment of the Potential for, and the Detection of, Spontaneous Combustion in Coal Mines

    pNumerical modelling has been used to examine the relationship between the results of two commonly used methods of assessing the propensity of coal to spontaneous combustion, the R70 and Relative Igni

    Jan 1, 2005

  • AUSIMM
    Iron ore transfer chutes – directions after 30 years of scale modelling

    By P Donecker

    Like all chains, iron ore values chains are only as strong as their weakest link, which in ore processing is often the humble chute. While mechanically the simplest element in the iron ore flow sheet,

    Sep 18, 2023

  • AUSIMM
    The Sustainability of Biologically Treated Nickel/Copper Mine Effluent Suitable for Irrigation

    By A Geldenhuis, M Hagger, J Maree

    Disposal of mine water is a worldwide problem occurring in the coal and gold as well in the metal ore mining areas. Since southern Africa is a (semi) arid region, mining effluents should be treated to

    Jan 1, 2003

  • AUSIMM
    Characterisation of Long-Term Scaling Effects of Ceramic Filter Media Used in the Dewatering of Iron Ore

    By R Salmimies

    Choosing a ceramic capillary action filter is often favoured in processes where low energy consumption is important, such as the dewatering of iron ore. In addition, the performance of the filter medi

    Jul 11, 2011

  • AUSIMM
    Phreatic uncertainty in the unsaturated zone of tailings storage facilities: an examination of two Australian case studies

    By E J. Coyle, L A. Millington

    Tailings storage facilities are geotechnically complicated structures that develop heterogeneous strength profiles and varied porewater conditions. The monitoring of porewater pressures is one of the

    Jul 1, 2021

  • AUSIMM
    Dredger drop impact on slope stability – Hazelwood Mine

    By J Stipcevich, N Patel, J Faithful5, S Narendranathan, L Tatnell4

    ENGIE, the current owner and operator of the Hazelwood Open Cut coalmine, are in the process of rehabilitating the mine site in preparation for mine closure. Bucket wheel excavators (dredgers) used du

    Jun 21, 2022

  • AUSIMM
    BHP Billiton West Australian Iron Ore Geometallurgy - Past, Present and Future

    By M Flanagan, T Sua, B Wright, T Carroll, B Van Dijken

    "BHP Billiton (BHPB) West Australian Iron Ore (WAIO) conducts an extensive geometallurgy (geomet) program for its iron ore deposits in the Pilbara. The geomet program provides accurate information to

    Sep 29, 2013