    Water Systems for Distributing Cooling in Deep South African Gold Mines

    By De Carvalho J

    The average installed refrigeration capacity on South African gold mines has increased by about eighteen per cent annually for the past 15 years; both the number of installations and their duties h

    Jan 1, 1988

  • AUSIMM
    The Initiation of Primers by Detonating Cord

    The initiation of cast Pentolite primers by detonating cord has been examined by the combination of two different experimental techniques with computer simulation by the finite element hydrodynamic

    Jan 1, 1988

  • AUSIMM
    Ensure Your Fleet is Always Operating at its Top Efficiency Using Advanced Monitoring and Benchmarking Technology

    By Rogers R, Kinnane T

    In a typical open cast mining operation, investigation of how existing truck performance compares with the highest achievable truck performance is largely neglected. This paper addresses this issue

    Jan 1, 1994

  • AUSIMM
    Taking Control of the Mill Feed: Case Study û Partial Secondary Crushing Mt Rawdon

    By B Siddall, A Gunstone

    The use of a partial secondary crushing circuit provides a flexible way to optimise existing SAG comminution circuits limited by rock competency or enables optimal processing of an ore through second

    Jan 1, 2004

  • AUSIMM
    Underground Mining at the Cadjebut Joint Venture

    By McGuckin P. H

    The Cadjebut orebody is a MississippiValleyType (MVT) zinc-lead deposit, and is located approximately 80 km southeast of Fitzroy Crossing in the Kimberley region of Western Australia. It is one of fiv

    Jan 1, 1992

  • AUSIMM
    Mining Equipment - Mine Transportation

    EQUIPMENT TO BE DISCUSSED It is the intention of this paper to discuss the transporting of large skid mounted equipment and track machines around open cut mines. By large I mean 100 to 350 tonne cap

    Jan 1, 1989

  • AUSIMM
    Cambrian Tectonics and Mineralisation in Western Tasmania

    By Keele R. A

    The Cambrian structure in the Mt Read Volcanics was produced by four deformational events: obduction of forearc-derived mafic/ultramalic complexes in the early Middle Cambrian, a middle Middle Cambr

    Jan 1, 1997

  • AUSIMM
    Simulation of the Mineralogical and Chemical Aspects of Heap and Dump Leaching as an Aid to Ore-Process Evaluation

    By Box JC

    A comprehensive computer simulation has been developed for heap and dump leaching processes. It deals with complex chemical interactions, involving several minerals and reagents, which vary with t

    Jan 1, 1983

  • AUSIMM
    Notes on Mount Isa Geology

    This paper deals briefly with three of the more controversial aspects of the geology of the Mount Isa ore deposits namely the geologic structures, the method of ore deposition and the origin of the or

    Jan 1, 1961

  • AUSIMM
    HMS Cyclone Development at Argyle Diamonds

    The heavy media cyclones at Argyle Diamonds are subjected to extremely abrasive service conditions and have been the subject of a development program from the time the first ore was treated in the

    Jan 1, 1996

  • AUSIMM
    Overburden Removal Activities Associated with the Yallourn Open Cut Township Field

    By Fraser C. J

    The township of Yalloum was established in 1921 to provide accommodation for the work force on the sites of the power station and open cut which were to become the basis of Victoria's electricity

    Jan 1, 1992

  • AUSIMM
    Longwall Production - Review of Scheduling Factors and Overall Effects of Some Natural Hazards

    The results expected from a longwall face can best be estimated from the ideal production rate, determined by the capacity of the equipment and the conditions in which it is installed, the effective o

    Jan 1, 1991

  • AUSIMM
    Northparkes Mines ù Design, Sudden Failure, Air-Blast and Hazard Management at the E26 Block Cave

    By A van As

    This paper serves to outline the circumstances and causes of the air-blast that occurred at Northparkes Mines in November 1999. It describes the design of the mine, the geotechnical issues surrounding

    Jan 1, 2005

  • AUSIMM
    HydroCopper<sup>«</sup> ù A New Method for Treating Copper Concentrates

    By E Yll÷, O HyvSrinen

    Outokumpu has developed a new chloride leach process, called HydroCopper«, to treat copper concentrates. Chalcopyrite is quite refractory in leaching and in sulfate milieu an autoclave of high tempera

    Jan 1, 2005

  • AUSIMM
    Summary of Japanese Coal and Gas Outburst Experiences and Measures Taken Against the Problem

    By Higuchi K

    In this paper, the history of Japanese coal and gas outbursts is presented and circumstances and countermeasures at the time cf outbursts are summarized statistically. Then the present meth- ods fo

    Jan 1, 1986

  • AUSIMM
    Environment Studies to Determine the Impacts of Re-opening Banksa Stiavnica-Hodrusa Ore District in Czechoslovakia

    By Skaviniak M

    Some better perspectives applying to the exploitation and dressing of polymetallic ores in the Banskfa. gtiavnica-Hod- rusea Ore District are supposed to be achieved after a suc- cessful investigatio

    Jan 1, 1988

  • AUSIMM
    Optimisation of Cut-off Grades During Design of Underground Mines

    The theory of declining optimimum cut-off grades is more than 25 years old, but for a number of reasons it is still not widely used in industry. A lack of faith in the veracity of estimated grades i

    Jan 1, 1991

  • AUSIMM
    Metalliferous Mining Methods

    This paper covers the key issues such as orebody geometry and grade, geotechnical data and metallurgical response. These must be considered in selecting a mining system for a new orebody. It then

    Jan 1, 1997

  • AUSIMM
    Some Petrographic and Genetic Aspects of Rampura - Agucha Zinc - Lead Deposit, District Bhilwara, Rajasthan, India.

    By Singh TN

    Rampura-Agucha Zinc-Lead deposit is unique as it is reported for the first time in the gneissic terrain with a rich oregrade quality of early to middle Proterozoic of Bhilwara supracrustal belt in the

    Jan 1, 1990

  • AUSIMM
    Estimating the Remaining Fatigue Life of Stockyard Machines

    By S Rice, A Midlin

    Many of the stacking and reclaiming machines employed in the mining industry today are operating in ways that were never envisaged in the days before they were commissioned, with greater throughput, i

    Jan 1, 2007