Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Flotation Data - Now that I've got all these numbers what do I do with them?

    By Grano S. R, Ralston J

    It is the perennial problem most metallurgists face when examining data collected from laboratory float tests and plant surveys - there are more numbers than we know what to do with! The objective o

    Jan 1, 1994

  • AUSIMM
    Brisbane Airport Link Earth Pressure Balance Machine Two Component Tailskin Grouting – A New Australian Record

    By A Reschke

    The Thiess John Holland Group is undertaking the design and construction of Brisbane’s Airport Link Project, the largest single investment in transportation infrastructure in Australian history. Twin

    Mar 8, 2011

  • AUSIMM
    Quantifying Geotechnical Risk in the Mine Planning Process

    By T P. Medhurst

    In many cases mine design is the most important driver of the profitability of a mining project, however to reach an æoptimumÆ mine plan many compromises have to be made. Some of the fundamental profi

    Jan 1, 2000

  • AUSIMM
    Plant rejects disposal strategies applied at Caval Ridge open cut coal mine

    By J Li, H Hooi, D Payne

    Caval Ridge Mine (CVM) is one of the newly established open-cut coal mines of BHP in Queensland, where no tailings dam is planned to be built in order to minimise environmental impacts from mining act

    Jul 23, 2018

  • AUSIMM
    Research and Application of Total Tailings Backfill at Zhangmatun Iron Mine (163a2830-6e6a-4b23-b34c-e44378a86b18)

    By Aiming Z, Shenyi S, Xialei W

    Zhangmatun Iron Mine is situated in the suburbs of Jinan city. Shandong, China. Because of surface environmental constraints, no suitable site can he selected to dispose of mill waste. The full mill

    Jan 1, 1998

  • AUSIMM
    Peanuts and Tunnel Stuffing - The Brightwater Conveyance System East Contract

    By M E. Trim, J J. Johnson, W Cranston

    The Brightwater conveyance system is located near Seattle, Washington in the north-western United States. The East Contract portion of the system consists of a 4.3 km long, 5.9 m diameter tunnel in so

    Jan 1, 2008

  • AUSIMM
    The Application of High Energy Primers to Underground Development

    By D L. Kennedy

    It has always been a challenge to accelerate the underground development progress by increasing the advance rate of each development round. Surveys have shown that most of the development rounds have

    Jan 1, 1999

  • AUSIMM
    Pushing the boundaries of slag operability – processing of high-MgO nickel concentrates with the Ausmelt TSL process

    By J Coveney, A Rich, D Grimsey, J Wood, S Creedy

    In 2021, BHP and Metso examined processing of high-MgO nickel sulfide concentrates using Metso’s Ausmelt Top-Submerged-Lance (TSL) technology. Test work was conducted in Metso’s pilot test work facili

    Aug 21, 2024

  • AUSIMM
    Goafstream Sampling and the Barometer

    By M Brady

    "It has long been recognised that the barometer infl uences areas of underground coal mines that havebeen sealed off from the current, or active, mine workings but it appears litt le formal research h

    Jun 1, 2012

  • AUSIMM
    Effective Control of Respirable Dust in Underground Coal Mines in the United States

    By G V. R Goodman, G J. Chekan, J M. Listak

    The extraction and transport of coal from underground coal mines can result in significant liberation of coal and/or silica dust into the mine atmosphere. Mine operators have long used ventilating air

    Jan 1, 2005

  • AUSIMM
    Modelling of a æTrue-Belt SamplerÆ - A New Device for Sampling from a Conveyor Belt

    By R Steinhaus, D M. Frantois-Bongarton, P W. Cleary, G K. Robinson, M D. Sinnott

    Multotec Process Equipment and Dominique Frantois-Bongarton have a patent for a mineral sampling device, which they call a æTrue-Belt SamplerÆ. This uses a plough, which is rotated about an axis paral

    Aug 21, 2012

  • AUSIMM
    Calibrating Comminution Models Using Operating Data to Forecast and Optimise Plant Performance

    By A L. Zawadski, B G. Putland

    "This paper discusses a method to build a calibrated comminution circuit model, using historic operating data and blend information that is useful for forecasting and optimising plant performance, as

    Oct 10, 2016

  • AUSIMM
    Mist Diffusion Experiment and Evaluation of Water Tube for Blasting Demolition Dust Control

    By H-S Yang, H Park, S-J Kim, Y-H Ko, H-S Kim, S-H Cho, J-K Kim

    An investigation was undertaken to devise a new method for reducing dust spread during blasting demolition utilising water tube and detonating cord. Modelling of smooth particle hydrodynamics (SPH) wi

    Aug 24, 2015

  • AUSIMM
    Comparison between Gaussian Processes and Dynamic Time Warping for Classification of Marker Shales in Iron Ore Deposits

    By A Melkumyan, K Silversides

    The banded iron formation-hosted iron ore deposits located in the Hamersley Ranges of Western Australia contain marker shales that are used to distinguish lithology for geological and orebody mapping.

    Nov 24, 2014

  • AUSIMM
    The Development of Colloidal Mixer Based CRF Systems

    The high-shear colloidal mixer is generally recognised as the most efficient method of mixing cement based grouts. Only recently however has this technology been applied to the production of cemented

    Jan 1, 1998

  • AUSIMM
    A Dynamic Sediment Simulation to Predict the Variability of Suspended Solids Concentrations over Life-of-Mine for Application to a Risk-based Environmental Assessment

    By M Ind, B Usher

    Environmental regulators are increasingly adopting risk-based approaches to protect aquatic ecosystems. The Australian and New Zealand Environment and Conservation Council (ANZECC) and the Agriculture

    Jul 16, 2014

  • AUSIMM
    Banking Needs for Project Development Financing (591555b9-102c-4033-a3e1-dcf0b636a120)

    Some only types of bank finance are appropriate for mining development, with conventional fixed rate finance having significant limitations of flexibility. New, innovative and flexible instruments

    Jan 1, 1983

  • AUSIMM
    Application of Borehole Imagery in Iron Ore - Examples from the Hamersley Group, Western Australia

    The borehole televiewer is a downhole geophysical logging device that produces continuous, oriented, 360¦ images of the drill hole wall. Two types of borehole images are currently being generated at t

    Jan 1, 2007

  • AUSIMM
    Reduction of Mechanical Entrainment by Polymer Depressants

    By Y Peng, D Wannas

    In the fine particle flotation technologies being developed today the fine hydrophilic (gangue) particles are usually well dispersed. These highly dispersed fine particles can be recovered into the fl

    Jan 1, 2005

  • AUSIMM
    Acid Rock Drainage Prediction and Waste Rock Segregation Plan for Ankerite-Containing Mine Waste ù Restigouche Mine Case Study

    By R Carreau

    The results of a detailed acid rock drainage (ARD) prediction program were used to revise the waste rock segregation criteria at the Restigouche open pit mine. Waste rock at the site was predominately

    Jan 1, 2003