Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Flotation control using froth stability: past, present and future

    By C Smith, J Cilliers, K Hadler

    Unstable flotation froths, that burst before they overflow, produce no concentrate. Increasing the froth stability to improve recovery is therefore an obvious control strategy. Froth stability can be

    Aug 29, 2018

  • AUSIMM
    Mining at Depth - the Major Issues

    By Lloyd F, Arnold D. A, Hagan T. O

    This paper investigates the problems that are encountered in mining at extreme depths. It looks into the rock mechanic aspects, especially the high stress levels that will occur, and the hazard of

    Jan 1, 1986

  • AUSIMM
    Calibration and Testing of a Geometallurgical Leaching Protocol for Determining Copper Mineralogical Deportment

    By N L. Turner, D J. Robinson, A J. McFarlane, N M. Chapman, L L. Kuhar, R L. Meakin, R Martin

    A number of geometallurgical tests have been developed within the AMIRA P843A Geometallurgical Mapping and Mine Modelling (GeMIII) project, an interdisciplinary collaborative research project involvin

    Sep 29, 2013

  • AUSIMM
    Assessments of Ground Conditions for Exploration Prospects and Mines

    Mining software systems have provided a basis for integration of resource, survey, and design functions. They can similarly provide a basis for incorporating ground conditions into the process.Explora

    Jan 1, 1993

  • AUSIMM
    A ‘no tailings dam future’ – preconcentration strategies ‘down the sizes and across the value chain’

    By P Revell, B Adair, D King, L Keeney

    Grade Engineering®, integrated across the mine value chain, has a pivotal role to play in achieving step change reductions in energy and water usage in mine operations. High levels of gangue rejection

    Nov 10, 2020

  • AUSIMM
    Martha Hill Mine - The Mining Contractor's Viewpoint

    By R Butler

    Contract m1n1ng in New Zealand developed in the coal industry and has become an element in the success of recently opened hard rock gold mines. At Martha Hill, the mining contractor is undertaking a w

    Jan 1, 1991

  • AUSIMM
    Considerations and Challenges in the Design and Construction of Tunnels for Remote Hydropower Projects

    By A G. Noble

    Tunnelling for hydro-electric power projects can be a very challenging component of the overall development. In contrast to urban transportation tunnelling where the logistics for access and supply of

    Mar 8, 2011

  • AUSIMM
    Open stope design; beyond the Stability Graph

    By B McFadyen, Y Potvin, K Woodward

    The Australian Centre for Geomechanics (ACG) held two workshops in 2019—one in Australia and one in Canada—to discuss processes and methods currently used in the mining industry for stope design and r

    Mar 15, 2021

  • AUSIMM
    Localised Uniform Conditioning in the Multivariate Case - An Application to a Porphyry Copper Gold Deposit

    By W Assibey-Bonsu

    The paper provides a brief review of the multivariate uniform conditioning and the localised multivariate uniform conditioning techniques and presents a case study based on a porphyry copper gold depo

    Sep 26, 2011

  • AUSIMM
    Recovery of the northern mining block at Cliffs Nickel Mine

    By M Hopkins, A Mutale, A E. Vidal da Silva

    The Cliffs Nickel Mine extracts a narrow near vertical nickel vein using a mining method of underhand bench stoping with paste backfill. In 2014, at a depth of 400 m below surface, the Northern block

    Mar 15, 2021

  • AUSIMM
    Reducing the Cost of Tunnel Design in Australia

    By B Rouvray, R Bertuzzi

    The development of a design-and-construct tunnelling project in Australia from its concept to its construction requires designs to be prepared and reviewed at several distinct stages prior to document

    Sep 17, 2014

  • AUSIMM
    Turning Ideas into Gold Bars

    The invitation to speak today was in the form of a single sentence instruction: How does your company run and how do you communicate from top to bottom? It looks like I'll have to let you into

    Jan 1, 1995

  • AUSIMM
    Implicit Modelling Applied to Grade Control Data

    By J Ireland, S Rose

    The main outcomes of mining grade control include defining the boundary between ore and waste and then categorising the ore according to which stockpile it should be sent. A typical workflow includes

    Aug 18, 2014

  • AUSIMM
    Do You Understand Your Legal Obligations in the Industry?

    Most new engineers in the mining industry do not realise the importance of legal obligations. During investigations the first question you are asked is: Do you have any proof or evidence? The smallest

    Jan 1, 2007

  • AUSIMM
    Reducing the Energy Required in Grinding Clinker to Cement – Some Case Studies

    By H Benzer

    Grinding clinker to finished cement consumes more energy than any other comminution process. World production of cement in 2009 was 2840 million tonnes and the energy required for comminution was 40-6

    Aug 8, 2011

  • AUSIMM
    Perspectives of chemical metallurgy fundamentals in slag innovation

    By S Lee, I Sohn

    The ferrous and non-ferrous metallurgical industries have been utilising slags, fluxes and mattes for process optimisation and quality improvements at high temperatures. Understanding the fundamentals

    Jun 19, 2024

  • AUSIMM
    Mine Environment Monitoring - So what has Changed Since Moura No 2?

    By D Cliff

    "It has been 17 years since the mine disaster at Moura No 2 Mine in Queensland. Recent disasters in the USA and New Zealand prompt the question what has changed since 1994. This paper att emptsto answ

    Jun 1, 2012

  • AUSIMM
    The Impact of a Derelict Base Metal Mine on the Aquatic Environment

    By McIlveen GR

    The water pollution hazard posed by the derelict Conrad mine site, to the water and associated stream sediment of Borah and Maids Creeks and the nearby Copeton Dam storage, has been assessed. Mine w

    Jan 1, 1988

  • AUSIMM
    Reporting of Gold Ore Reserves Standards Need to be Lifted

    Over the last five years the :forward momentum in the Australian resources sector has been dominated by gold production and exploration companies. While reporting of exploration results to sharehold

    Jan 1, 1987

  • AUSIMM
    Modelling Based on the Similarity Principle and Variables Optimisation on Hydrocyclone Classifiers

    Hydrocyclones are widely used in both mining and various industrial sectors. Considerable fundamental research work on the modelling of hydrocyclone classifiers has been carried out through the past

    Jan 1, 1993