Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Underground Pumping Plants"The pumping of the underground water of the Butte mines is largely done from two central plants of the Anaconda Copper Mining Co. The mines of one part of the mining district are served by a modern and mechanically efficient underground plant at the High Ore mine, and the remaining part by a similar one at the Leonard mine. Properties not affiliated with the A. C. M. Co. have separate pumping plants, although in several instances that company handles the water of outside companies, under which arrangement costly single plants are dispensed with. An extensive system of underground crosscuts and drifts connects these mines to both the main pumping plants, so that either may receive the water from all the mines in case there should be a failure in the other to perform its designed service.Quintuple) vertical electric pumps, 7 inches by 12 inches each, of a capacity of 600 gals. per minute under a head of 1,203 feet, are installed at both the plants. Each pump is direct connected to two 150 h-p. motors using 2,300 volts, the motors being on top of the pumps.At the High Ore plant the power cable of 400,000 c. m. is placed in a nearby shaft, the cable at present being hung from the surface to the 2,200 level. From this cable feeders of 300,000 c. m. are laid in connecting crosscuts to the pumping station at the High Ore shaft.The Leonard motors use 440 volts. The practice of building the pumps with the motors on top requires stations with high roofs, but permits the operation of the pumps if they should be submerged by an unusual flow of water."
Jan 1, 1913
-
Iron and Steel Division - Effects of Manganese and Its Oxide on Desulphurization by Blast-Furnace Type SlagsBy Nicholas J. Grant, Ulf Kalling, John Chipman
THE operation of a blast furnace is dependent to an important extent upon the sulphur content of materials charged and the desired limit of sulphur in the product. It has long been known that the blast furnace is the most efficient tool for desulphurization in common use and that this efficiency is associated with the strongly reducing conditions of the hearth and is enhanced by increased basicity and fluidity of the slag. The chemical reactions of desulphurization may be studied from the viewpoint of the ratio of the process or of the final equilibrium conditions. Both kinds of studies contribute to an understanding of the process and both are included here. A simple measure of the desulphurization power of a slag is given by the ratio: Pct sulphur in slag (Pet S) Pct sulphur in metal [Pct S] This ratio was used by Holbrook and Joseph',' to measure relative desulphurizing powers under controlled laboratory conditions. It was also used by Hatch and Chipman3 as a measure of the equilibrium distribution. For the latter purpose it would be preferable to employ thermodynamic activities rather than percentages, but until very recently this has been impossible for lack of data. Now, thanks to the work of Morris and Williams and Morris and Buehl," the effects of carbon and silicon upon the activity of sulphur in the metal are known. The confirmation of this work and its extension to include the effects of other elements by Sherman and Chipman and by Rosenqvist and Cox' make it possible to calculate the activity of sulphur in pig iron of any composition. Hence it is now possible to use data on the equilibrium distribution of sulphur to find its activity in the liquid slag and to approach an ultimate solution of the thermodynamic aspects of the problem. The rate of transfer of sulphur from metal to slag is the problem of major industrial importance and indeed the principal need for equilibrium data has been as a necessary adjunct to the kinetic studies. The rate of approach to equilibrium under laboratory conditions seems slow compared to the requirements of industrial practice, and it is clear that further laboratory studies of rates are needed. In the research reported below, the items which were investigated were the following: I—The role of mechanical stirring on the approach to equilibrium. 2—The role of MgO in desulphurization as compared to CaO. 3—The role of MnO in desulphurization. 4— The limiting reactions which constitute the slow steps in desulphurization. Experimental Procedure The experimental set-up and procedure previously described by Hatch and Chipman" were essentially followed with several small modifications. The graphite crucible containing the slag and metal charge was altered to provide considerably more active stirring and mixing of the slag and metal in the carbon monoxide atmosphere. For this purpose the crucible was machined to provide two deep cylindrical wells which were interconnected at top and bottom as shown in Fig. 1. A graphite screw with a flat thread and of shallow pitch (4 threads per in.) spinning at 600 to 800 rpm was used to lift the slag and metal over the partition between the two wells and throw them over into the second well, where the metal settled through the slag into the reservoir at the bottom. It was possible to see actual particles of slag and metal being thrown over the partition. In this respect, the stirring was more vigorous than used in the work of Hatch and Chipman. A charge of 400 g of wash metal was first melted, and 20 g of FeS was then added to yield a bath containing 1.65 pct S. Immediately 400 g of slag (as pure mixed oxides) was added and fused. The slag was generally fused in 1 hr * 10 min. Within 30 to 45 min after melting, the temperature was adjusted to 1525"C, and the first slag and metal samples were taken. The slag was picked up on the end of a cold Armco iron rod, whereas the metal was sucked into a silica tube. The wash metal composition was (in percent): 4.29 C; 0.022 S; 0.021 P; 0.38 Si. The slags used were of four fixed starting compositions covering a wide range of acid-base ratios shown in Table I. Deliberate variations in MgO were made in these slags to check the role of MgO in blast-furnace desulphurization. Changes due to additions and reactions were followed by analysis of samples. Additions of Mn and MnO were made to most of the heats to note the role of Mn and MnO on desulphurization. Three heats (62 through 64) were made in an open pot induction crucible (graphite) using a
Jan 1, 1952
-
Reservoir Engineering-Laboratory Research - Rapid Analysis of Condensate Systems by ChromatographyBy D. M. Kehn
A method has been devloped for chromatographic analysis Of the vapor and liquid phases Of a a system containing methane to components having 20 or more carbon atoms. The method uses a windowed equilibrium cell in which volumetric phase behavior of the system can be observed accurately and from which small samples of gas or liquid can be withdrawn for analysis. Analyses are made using two chromatographs, one for the lighter and one for the heavier components in a sample. Combination of the two analyses yields a detailed analysis of the gas or liquid sample. The complexity of the condensate heavy ends is evident from the chromatograms of these fractions, and the predominance of the paraffin hydrocarborn serves as a useful marker in interpreting the chromatograms. The K-values obtained in this analytical method are presented for a high-pressure condensate system and predict closely the observed volumetric behavior of the system. INTRODUCTION Quantitative analysis of hydrocarbons from natural gas reservoirs is necessary for several reasons—to calculate the amount of sales gas produced, to calculate the amount of natural gasoline produced, to plan a liquid recovery system, or to calculate the potential economic value of a reservoir produced under one or more of several different conditions. Analysis of natural gas fluids produced to the surface consists of identifying and computing the mol fraction of each component of the mixture. Although methane is the predominant component, varying amounts of ethane, propane, butane, pentanes and heavier components are also present. Materials containing up to 30 carbon atoms occur in amounts which decrease with increasing molecular weight. However, the quantities of components in the 20 to 30 carbon atom range are usually so small that their importance is negligible, and they are undetect-able in natural gas by ordinary analytical methods. All the components up to those having 20 carbon atoms may sigsficantly affect phase behavior, however. Commonly, only the methane-through-pentane fraction is analyzed quantitatively for each component, while components heavier than Pentane are lumped and repored as "hexane- plus". Expensive, tedious techniques are required for analysis of this fraction. Consequently the detailed analyses needed for prediction of reservoir behavior are usually undertaken only when major gas fields are being developed. The need for complete analyses of condensate systems is apparent when it is recalled that most gas fields are produced by pressure depletion. As the pressure declines, some of the heavier hydrocarbons are lost as liquids which are in the reservoir. In many instances the amount of liquid in equilibrium with the gas phase at high pressure constitutes only 1 or 2 mol per cent of the total system. Flash calculations generally must predict the actual amount of liquid with an accuracy of a few per cent in order to be useful. This retrograde condensation has been understood for years, but accurate correlation methods to permit quantitative prediction of phase behavior in the retrograde region are not presently available. The increasing importance of natural gas has made accurate prediction of phase behavior and composition of produced natural gas streams an economic necessity. The work reported here was undertaken to provide a rapid, economical method for obtaining the vapor-liquid equilibrium information needed to predict accurately the composition of the fluids produced from a gas reservoir throughout its life. TO develop this method, a pressure cell equipped with windows was designed and built for observing the volumes of liquid and gas present at reservoir pressures and temperatures. Use was made of established chromatographic methods for rapid and detailed analysis of both phases. This paper describes the equipment and techniques developed for obtaining vapor-liquid equilibrium data, presents the results of analyses of a condensate system, and indicates the usefulness of these data in predicting hydrocarbon phase behavior. DESCRIPTION OF EQUIPMENT USED The equipment used in obtaining the required information on phase behavior and the complete analysis of hydrocarbon mixtures through C, will be described first, followed by a discussion of the operation of the equipment. It will be helpful, however, to consider first a brief outline of the technique used. A sample of separator gas and liquid is charged to the windowed cell (see Figs. 1 and 2) where volumetric equilibrium phase behavior at reservoir pressures and temperatures can be determined. Then samples of the coexisting phases are withdrawn. The methane-through-pentane fraction is analyzed with a chromatograph equipped with a hot-wire detector, and the pentane-plus fraction is analyzed with a second chromatograph equipped
Jan 1, 1965
-
Reservoir Engineering-General - A Study of the Vaporization of Crude Oil by Carbon Dioxide RepressuringBy R. F. Nielsen, D. E. Menzie
The object of this study was to determine if crude oil could be produced successfully by a process of crude oil vaporization using carbon dioxide repressuring. This process appears to have application to highly fractured formations where the major oil content of the reservoir is contained in the non-fractured porosity with little associated permeability. Crude oil was introduced into the windowed cell and carbon dioxide was charged to the cell at the desired pressure. A vapor space was formed above the oil, and the crude oil-carbon dioxide mixture was allowed to come to equilibrium. The vapor phase was removed and the vaporized oil collected as condensate. Samples of all produced and unproduced fluids were analyzed. Tests were also performed to evaluate the amount of vaporized oil that can he produced by rocking from a high to a lower pressure. The carbon dioxide repressuring process was applied to a sand-filled cell to investigate the performance in a porous medium. A test was performed to evaluate how the condensate recovery changes as the size of the gas cap in contact with the oil changes. INTRODUCTION This study has been directed toward a relatively new process of vaporization of crude oil designed to increase ultimate production of hydrocarbons through the application of carbon dioxide to an oil reservoir. Suggested advantages of carbon dioxide repressuring of a petroleum reservoir are: (1) reduction in viscosity of liquid hydrocarbons due to the solubility of carbon dioxide in crude oil, (2) swelling of the reservoir oil into a larger liquid-oil volume with a resulting increase in production and decrease in residual oil saturation due to an increase in the relative permeability to oil, (3) displacement of more stock-tank oil from the reservoir since the residual liquid is a swelled crude oil, and (4) gasification of some of the hydrocarbons into a carbon dioxide-hydrocarbon vapor mixture. Balanced against these advantages are several detrimental factors which must be evaluated; i.e., high compression costs and corrosion of well equipment and flow lines. Some of the more outstanding contributions to the study of carbon dioxide injection have been reviewed in order to furnish a basis for a continuation of research pertaining to this method. The literature reviewed1-8 has been limited to that dealing with carbon dioxide repressuring processes or with carbon dioxide-crude oil-natural gas phase behavior. Articles relating to carbonated water injection and literature published on the use of low pressure carbon dioxide gas injection in water flooding have not been included in this study. In 1941 Pirson5 suggested the high pressure injection of carbon dioxide into a partially depleted reservoir for the purpose of causing the reservoir oil to vaporize and thus produce the oil as a vapor along with the carbon dioxide gas. By reducing the pressure on this produced mixture of hydrocarbons and carbon dioxide at the surface, it was proposed to separate the hydrocarbons from the carrier gas. He theorized that essentially all the oil in a reservoir could be produced by simply injecting enough carbon dioxide to vaporize the residual oil. This present investigation deals with the vaporization of a crude oil by carbon dioxide, the molecular weight and gravity of the vaporized oil product and the characteristics of the residual oil after several repressuring cycles with carbon dioxide. An attempt is made to evaluate the merits of a vaporization process for the crude oil rather than a flow process where the oil recovery is determined by relative permeability considerations. Such a vaporization of crude oil by carbon dioxide repressuring appears to have possible use in a highly fractured formation where the major oil content of the reservoir is contained in the non-fractured porosity with little permeability. The carbon dioxide flows into the fractures, contacts the crude oil in the matrix and vaporizes part of the crude oil; this vaporized oil is produced and recovered and the carbon dioxide is reinjected again. The specific problem of this study is to attempt to answer this question; Can crude oil be produced successfully (technically, but without economic considerations) from a petroleum reservoir by a process of vaporization of the crude oil by carbon dioxide repressuring? DEFINITION OF TERMS AS APPLIED IN THIS STUDY Carbon Dioxide Contact: One cycle in which carbon dioxide was injected and bled off. Condensate: The hydrocarbon liquid which was condensed out of the mixture of hydrocarbon-carbon dioxide vapor upon reduction of the pressure of the vapor. Hydrocarbons Produced (HCP): All the hydrocarbon!, which were vaporized by the carbon dioxide repressuring process and were removed from the cell during any specific cycle or carbon dioxide contact. Hydrocarbons Unproduced (HCU): All the hydrocarbons which were not vaporized by the carbon dioxide
-
Industrial Minerals - American Potash & Chemical Corp. Main Plant CycleBy M. L. Leonardi
THE Searles Lake orebody is located in the north- west corner of San Bernardlno County. It is a dry lake bed with an exposed salt surface covering an area of 12 square miles. Recoverable mineral values are contained in the mother liquor below the surface of the lake. Stratification in the lake bed has separated the brine into two bodies which dlffer in composition. Although liquor is processed from both bodies, this paper will discuss only the upper structure brine. Fig. 1 illustrates a typical cross-section of the two commercial orebodies. The orebody is composed of a porous salt deposit 70 to 90 ft deep. The upper structure is separated from the lower orebody by a 12 to 16-ft thick impervious mud seam, as shown in Fig. 1. These salt structures are composed of 55 pct solid-phase salts and 45 pct voids which are filled with the original mother liquor. The brine wells are drilled to the separating mud seam and cased to wlthin 10 ft of the bottom. This is done to draw the brine horizontally from the bottom of the structure. It is pumped with multistage centrifugal pumps Into the plant at the rate of 3 milllon gal per day. The first process that was successful was developed by Charles P. Grimwood for the recovery of potash. The first evaporator unit was built in 1916. In the early twenties, Dr. Morse worked out a process for the recovery of borax. This made the cycle more efficient, as the end liquor could be sent back to the evaporators rather than being sewered. In 1926 the American Potash & Chemical Corp. was formed as a new company, and the entire plant was remodeled. The plant at that time produced only potash, borax, and boric acid. Since then the American Potash & Chemical Corp. has added processes for the production of USP boric acid, refined potash, sulphate of potash, soda ash, salt cake, lithium concentrates, Pyrobor (Na2B4O7) bromine, phosphoric acid, and lithium carbonate. The main plant cycle may be depicted as a closed cycle, see Fig. 2. The raw material, brine, enters the cycle to be mixed with the end liquor, known as ML2, from the pentahydrate borax crystallizers. The mixture of these two forms evaporator feed. Evaporator feed is pumped to the evaporators where it is concentrated, with respect to potash and borax. In the same operation water vapor, sodium chloride, salt trap salt, and clarifier salt are removed from the cycle, see Fig. 3 for potash plant product. The evaporators produce a concentrated liquor which contains approximately 19.5 pct KCI. This liquor is diluted as it enters the potash plant to keep all salts, except potash (KCI, 97.0 pct) in solution. Here the moist potash leaves the cycle at 100°F. The end liquor, known as ML1, is pumped to the borax pentahydrate crystallizers, where crude borax pentahydrate is crystallized and removed as solid phase. The ML2 is sent back to pan feed to be reconcen-trated, see page 207. Note that the only water to leave the cycle is in the form of vapor and moisture in the solid phase products crystallized. Thus there is a constantly cycling volume of liquor to which brine is added. Since the volume of liquor cycled does not increase, the brine is, in effect, evaporated to dryness. This would be true if there were no liquor losses. But, as in all processes, there are always unavoidable and accidental losses which reduce the volume of cycling liquors. The losses must be made up with brine. The concentration process is the beginning and the end of the cycling liquors. In this process there are three evaporator units of the triple effect counter-current type, that is, there are three pans in each unit and the heat flows in one direction while the liquor flows the other way through the evaporator pans, see Fig. 4. During the evaporation process a great deal of sodium chloride, burkeite, some sodium carbonate monohydrate, and a little lithium-sodium phosphate are crystallized. The volume of these salts is so great that they must be removed as they are formed or the process would come to a standstill. Brine and recycled mother liquor No. 2 enter the third effect evaporator pan from the evaporator feed storage tanks, see Fig. 5. A steady flow of liquor is removed from the bottom of the No. 3 pan and is pumped through the No. 3 cone of the salt trap, a clear liquor being returned to the NO. 3 pan. A portion of this clear liquor is pumped to the second effect pan. This process is repeated in each pan. The liquor from the No. 2 pan is pumped through the No. 2 salt trap cone and returned to the No. 2 pan.
Jan 1, 1955
-
Coal - Advancing Through Caved Ground with Yieldable ArchesBy J. Quigley
As the outcrop mines in the West developed into underground operations, systems of ground support were gradually evolved. In the early coal mines there was little need for support except near the dirt line in portals, where stone masonry was common. Where the top was shaley or broken, native pine props with light cross bars and legs furnished enough support even in Utah's 25-ft coal seams. As depth of workings increased. roofs and backs of the same general nature as those near the surface became more and more unstable and required more and more support. Some coal airways show this tendency very clearly. From the surface down the same type of roof shows deterioration which an experienced eye can translate into a measure of depth under surface rather than change in rock characteristics. Rock bolts, developed by various companies and by the U. S. Bureau of Mines, have become an effective substitute for timber in sections of some metal and nonmetal mines formerly requiring escessive timber support, and further use of war surplus landing mats, chain link fencing, and a new punched channel developed by one of the steel companies has enabled other mines to operate deposits where costs of timber and lack of clearance for timber support would have prohibited mining. The block caving mines have made extensive use of reinforced concrete underground to achieve similar ends under difficult conditions. Steel sets are standard in many Bureau of Reclamation projects, although these are usually covered in with concrete to make the permanent structures the Bureau's reclamation projects require. But the use of steel in mining operations is limited and has been confined principally to the iron ore mines of Michigan, Wisconsin, and Minnesota. Some mines have installed used rail as posts, caps, and crossbars, but a rail section is not suited for load carrying, and used rails are generally brittle. having a tendency to fail without warning when overloaded. European mines were the first to reach the size of worked out areas and depths of cover resulting in major roof problems. The Europeans resorted to pack walls and masonry walls, in conjunction with timber arched sets. rail arches, and combination timber and rail and steel arches. The give in these pack walls and wooden blocking was supplemented by a hinge in the center of the arch. This design is called an articulated arch Through various refinements of this principle of the support giving graduallv with the load. Toussaint-Heintzmann developed the yielding or sliding arches, in which yield is accomplished by friction in the overlapping joints of the arch. This type has gained widespread acceptance in the Ruhr and Lorraine Basin and is being manufactured by Bethlehem Steel for sale in this country. In North America the anthracite mines in Pennsylvania, followed by certain iron ore mines in upper Michigan and Canada, were the first to employ these arches to any extent. The practice was later adopted by Kennecott at Ruth, Nev., and by others. Despite high initial cost, the use of these arches is growing in many parts of the country because of their suitability in heavy ground. In its present form of manufacture the yield-able arch consists of open U-shaped rolled section with heavy beads on the edge. The open edge of the U is placed toward the wall. The section nests in another section of the same dimensions, and an arch can be built up from rolled radii and tangents of various weights and lengths. Sections are fastened together by U bolts and saddles. The lap on the joint varies from 12 to 24 in., and ordinarily the bolts are tightened with a 1-in. drive air wrench. The arches are spaced with channel struts held by J bolts and saddles. Sections can also be obtained that are composed of various combinations of radii and tangents and true circles. The joints can be placed to bear against anticipated loads and asymmetrical loads imposed by dipping strata. In the arches now being manufactured clearance widths up to 19 ft are obtainable in weights of sections from 9 to 30 lb per ft. The circular cross sections are available in the same weights ranging from 8 to 16 ft diam. At present most of the arches sold are supplied only in carload lots. It is hoped that demand will grow so that distributors can stock various weights and sections to give small operators a chance to try this new type of rock support under their own particular conditions. Several excellent papers have discussed the properties of various sections now manufactured, the dimensions of the sets obtainable, and their application under widely differing conditions. The present article will describe the methods and results of a special use of the arches at Kaiser Steel mine No. 3. Sunnyside, Utah. Problem at Mine No. 3 : In 1953 Kaiser Steel Corp. laid out Sunnyside mine No. 3 to recover coking coal left by the previous operator, Utah Fuel Co.. below workings that had been abandoned in 1928. Two seams had been worked, the upper and lower, separated by 30 to 42 ft of rock. Approximately 10 million tons of coal had been extracted from this area some 3000 ft down the itch from the outcrop to a 1500-ft depth of cover. The mine had been opened by slopes in both upper and lower seams. Sometime in the late 1920's the lower slope
Jan 1, 1960
-
Hecla's Mayflower Mine Uses Hydraulic Sandfill In Stoping OperationsBy G. L. Wilhelm
Prior to the construction of a 450 tpd concentrator at the Mayflower mine, owned by the New Park Mining Co. and operated by the Hecla Mining Co., the common mining methods were cut and fill, with waste or gob filling and square set timbering with waste fill. Stoping operations were beset with the usual problems related to waste filling methods- storage and handling of fill material from development, costly waste excavations necessary to obtain a portion of the needed waste rock, slow mining cycles due to filling and inefficient ground support. After Hecla Mining Co.'s successful utilization of sandfill in its mines in the Coeur d'Alene district, utilization of hydraulic fill in stoping operations at the Mayflower was a logical development of the modernization plan then in progress. The mine, located in the southeasterly part of the Park City mining district, Utah, is a medium size producer of lead and zinc ores, with gold, silver and copper as secondary minerals. The mine has been producing commercial ore since 1939 from a dual vein system which outcrops at an elevation of 7200 ft in the Wasatch Range. Access to the present mining areas is gained by a 7200-ft haulage tunnel and by an interior, three-compartment main shaft. The present mining horizons are about 2400 ft deep. The average horizontal cut and fill stopes, ranging from 3-15 ft wide and up to 120 ft long, can be classed as small.
Jan 5, 1968
-
Sources of InformationBy Robert Hoy
If the reader finds that the basic information in a commodity chapter is insufficient, he can consult the appropriate sources in this chapter to find more detailed or more up-to-date information. In these days, technology develops so rapidly that this 4th edition will be somewhat out of date even by the time it is distributed. A comparison of this edition with the 3rd edition (1960) of Industrial Minerals and Rocks will clearly demonstrate how rapidly the scene changes. One of the best sources of new information, of course, is attendance at technical meetings. For example, the papers presented at the national and sectional meetings of AIME usually discuss new developments in the respective divisions of the society. Frequently this information is available in Preprints. In addition some are printed in Mining Engineering and/or the Transactions of the Society of Mining Engineers of AIME. Furthermore, other professional and trade journals contain articles pertinent to the field. A journal introduced in 1967, Industrial Minerals, published by the Metal Bulletin, Ltd., London, is an excellent source of information. The Mining Journal, Ltd., also in London, publishes a weekly journal, a Mining Magazine (monthly), and a Mining Annual Re- view. The latter covers the field from three aspects: (1) by commodities, (2) through technical developments, and (3) geographically. Other useful magazines and periodicals include Engineering and Mining Journal, Pit and Quarry, Rock Products, and World Mining, all published in the United States. In addition many new books related to industrial minerals have been published since the 3rd edition of Industrial Minerals and Rocks. Most of these, of course, are included in the bibliography of each chapter in this volume. Another excellent information source is the proceedings of the Forum on Geology of Industrial Minerals. This group, which held its 11th annual meeting in 1975, is sponsored by a state geological survey or another mineral agency on a rotational basis. The proceedings have been published by the various sponsors and are available as indicated in Table 1. Two major sources of basic industrial mineral and rock data in the United States, and also a good source for many foreign countries, are the U.S. Geological Survey and the U.S. Bureau of Mines. The two agencies publish many reports and maps on a variety of geo- logical and mining subjects. In addition, each agency has an indexed list of all their publications with a free service announcing new publications. (New Publications of the Geological Survey, U.S. Geological Survey, Washington, D.C. 20242) and New Publications-Bureau of Mines, Publications Distribution Branch, U.S. Bureau of Mines, 4800 Forbes Ave., Pittsburgh, Pa. 15213). The U.S. Bureau of Mines (USBM) publishes annually Minerals Yearbooks which provide statistical data on mineral products including production, consumption, imports and exports, as well as information on new developments. Another very useful USBM series is called Mineral Facts and Problems. Editions were published in 1960, 1965, and 1970. Three other major series of publications by the Bureau are Information Circulars, Reports of Investigations, and Mineral Trade Notes. The latter is particularly good for news of foreign developments. A new Professional Paper No. 820 of the U.S. Geological Survey, 1973, summarizes data on the mineral resources of the entire country. The USGS, in cooperation with USBM, other Federal and various state agencies, has also prepared summary reports on mineral and water resources of given areas which include
Jan 1, 1975
-
Periclase Refractories In Rotary KilnsBy Leslie W. Austin
ROTARY kiln operators will agree that some of the most severe conditions a refractory must stand occur in the hot zone of a kiln burning Portland cement, dead burn dolomite, magnesite, periclase, and similar materials. Frequently the operator is faced with factors beyond his control which drastically shorten the life of refractories. Shutdown due to mechanical failure can be serious if the period is of sufficiently long duration to cause the dropping of coating or the loosening of the lining. A change in slurry can affect the coating and cause ring buildup. A change in type of fuel and its effect upon the flame can cause a shift in location of the hottest zone. Weekend shutdowns or any other interruption can cause the operator trouble and may damage the refractories, since stopping and starting a rotary kiln is certainly more difficult than stopping and starting a motor. Some operators have tried to set an estimate of damage for each shutdown in equivalent days of running time. Conditions affecting the refractory may be roughly grouped in four classes: chemical attack, mechanical stress, thermal shock, and abrasion. Chemical Attack: The drive to obtain maximum production through a kiln demands maximum operating temperatures, temperatures which are limited more by the ringing up or melting of the clinker. This can cause interface temperatures at the junction of coating and refractory which require the use of a basic kiln block to withstand the chemical attack. Chemical changes take place within the refractory itself, especially in chemically bonded or unburned kiln blocks: These changes cause the formation of the ceramic or burned bond. Migrating liquids or fluxes from the kiln charge have an effect within the refractory and lead to mineral or glass formation. The alkalies, sodium and potassium, migrate into the refractory as silicates, chlorides, sulphates or other salts. They may move under capillary action or may be caused to move by volatilization with condensation in the cooler portion. Mechanical Stress: Concentrated stress may be caused by several factors or combinations thereof. 1-The rings of refractories must be kept tight and rigid within the kiln, and this alone demands considerable force to hold the blocks in place. So that the force will not be concentrated, the blocks should fit the circle as perfectly as possible, with the faces in contact overall. 2-As the kiln is heated, thermal expansion takes place at the hot end of the kiln block. Since this disturbs the plane face it too can cause a concentrated stress at the two ends of the block, and shearing stress can be set up within the brick itself because of the difference in expansion between the two ends. 3-If a lining becomes loose and moves in the shell very severe stress can be set up, and as the kiln rotates this load changes and gives the effect of repeated loading. Permanent expansion of the refractory can also cause severe loading. 4-Not least important, flexing of the kiln is frequently the cause of concentrated stresses. Thermal Shock: Thermal shock, the result of heating and cooling too rapidly, occurs on starting and stopping or when a large patch of coating drops, exposing the bricks. Again, its destructive effect is often the result of phase change, liquid to solid or the reverse; dense refractories loaded with glass-forming impurities are particularly susceptible. Thermal shock is a problem with refractories set in the wall or roof of a stationary furnace, and becomes even more serious in a rotary kiln, the tendency to spall being magnified with movement and concentration of stress. Uniform rate of feed and loading insures both better coating and a more uniform stress. Abrasion: If the refractories do not take a coating, abrasion can become a most destructive factor. Movement of the lining in shell or movement of loose blocks causes abrasion, which is also most destructive if the refractories do not take a coating. An analysis of the problem of basic lining for the hot zone reveals, therefore, a number of desirable characteristics: high refractoriness, basic chemical reaction, resistance to spalling, good strength at all stages, ability to take coating, true sizing, volume stability, and abrasion resistance. Increased demand
Jan 1, 1952
-
Primary Blasting Practice At ChuquicamataBy Glenn S. Wyman
CHUQUICAMATA, located in northern Chile in the Province of Antofagasta, is on the western slope of the Andes at an elevation of 9500 ft. Because of its position on the eastern edge of the Atacama Desert, the climate is extremely arid with practically no precipitation, either rain or snow. All primary blasting in the open-pit mine at Chuquicamata is done by the churn drill, blasthole method. Since 1915; when the first tonnages of importance were removed from the open pit, there have been many changes in the blasting practice, but no clear-cut rules of method and procedure have been devised for application to the mine as a whole. One general fact stands out: both the ore and waste rock at Chuquicamata are difficult to break satisfactorily for the most efficient operation of power shovels. Numerous experiments have been made in an effort to improve the breakage and thereby increase the shovel efficiency. Holes of different diameter have been drilled, the length of toe and spacing of holes have been varied, and several types of explosives have been used. Early blasting was done by the tunnel method. The banks were high, generally 30 m, requiring the use of large charges of black powder, detonated by electric blasting caps: Large tonnages were broken at comparatively low cost, but the method left such a large proportion of oversize material for secondary blasting that satisfactory shovel operation was practically impossible: Railroad-type steam and electric shovels then in service proved unequal to the task of efficiently handling the large proportion of oversize material produced. The clean-up of high banks proved to be dangerous and expensive as large quantities of explosive were consumed in dressing these banks, and from time to time the shovels were damaged by rock slides. As early as 1923 the high benches were divided, and a standard height of 12 m was selected for the development of new benches. The recently acquired Bucyrus-Erie 550-B shovel, with its greater radius of operation compared to the Bucyrus-Erie 320-B formerly used for bench development, allowed the bench height to be increased to 16 m. Churn drill, blasthole shooting proved to be successful, and tunnel blasts were limited to certain locations where development existed or natural ground conditions made the method more attractive than the use of churn-drill holes. Liquid oxygen explosive and black powder were used along with dynamite of various grades in blasthole loading up to early 1937. Liquid oxygen and black powder were discontinued because they were more difficult to handle due to their sensitivity to fire or sparks in the extremely dry climate. At present ammonium nitrate dynamite is favored because of its superior handling qualities and its adaptability to the dry condition found in 90 pct of the mine. In wet holes, which are found only in the lowest bench of the pit and account for the remaining 10 pct of the ground to be broken, Nitramon in 8x24-in. cans, or ammonium nitrate dynamite packed in 8x24-in. paper cartridges, is being used. This latter explosive, which is protected by a special antiwetting agent that makes the cartridges resistant to water for about 24 hr, currently is considered the best available for the work and is preferred over Nitramon. Early churn drill hole shots detonated' by electric blasting caps, one in each hole, gave trouble because of misfires caused by the improper balance of resistance in the electrical circuits. Primarily, it was of vital importance to effect an absolute balance of resistance in these circuits, the undertaking and completion of which invariably caused delays in the shooting schedule. Misfires resulting from the improper balance of electrical circuits, or from any other cause, were extremely hazardous, since holes had to be unloaded or fired by the insertion of another detonator. The advent of cordeau, later followed by primacord, corrected this particular difficulty and therefore reduced the possibility of missed holes. After much experimentation, the blasting practice evolved into single row, multihole shots, with the holes spaced 4.5 to 5 m center to center in a row 7.5 to 8 m back from the toe. Such shots were fired from either end .by electric blasting caps attached to the main trunk lines of cordeau or primacord. The detonating speed of cordeau or primacord gave the practical effect of firing all holes instantaneously. Double row and multirow blasts, fired instantaneously with cordeau or primacord, proved to be unsatisfactory in the type of rock found at Chuquica-
Jan 1, 1952
-
Reservoir Engineering - Estimation of Reserves and Water Drive from Pressure and Production HistoryBy Francis Collins, E. R. Brownscombe
A study has been made of the material balance-fluid flow method of estimating reserves and degree of water drive from pressure and production history data. By considering the effect of random pressure errors it is shown that in a particular example a standard deviation of three and one-half pounds in each of ten pressure survey? permits the determination of the reserves with a standard deviation of 8 per cent and the water drive with a standard deviation of 15 per cent, assuming that certain basic geologic data are correct. It is believed that this method of estimating reserves and water drive is useful and reliable in a number of cases. The method is particularly valuable when reservoir pressure data are accurate within a very few pounds, but may also be applied with less accurate pressure data if a relatively large reservoir pressure decline occurs early in the life of the field, as for example in an under-saturated oil field. INTRODUCTION A knowledge of the magnitude of reserves and degree of water drive present in any newly discovered petroleum reservoir is necessary to early application of proper production practices. A number of investigators have contributed to methods of relating reserves, degree of water drive, and production and pressure history. 1-8 Three types of problems of increasing complexity may be mentioned. If a reservoir is known to have no water drive. and if the ratio of the volume of the reservoir occupied by gas to the volume of the reservoir occupied by oil (which ratio permits fixing the overall compressibility of the reservoir) is known, then only one further extensive reservoir property remains to be determined, namely the magnitude of the reserves. A straightforward application of material balance considerations will permit this determination. The problem becomes very much more difficult if we wish to determine not only the magnitude of the reserves but also the magnitude of water drive, if any, which is present. In principle, a combination of material balance and fluid flow considerations will permit this evaluation. Finally, if neither the magnitude of reserves, the degree of water drive, nor the ratio of oil to gas present in the reservoir is known and it is desired to determine all three of these variables, the problem could in principle be solved by a fluid flow-material balance analysis which determines the overall compressibility of the reservoir at various points in its history. The change in compressibility with pressure would provide a means of determining the ratio of gas to liquid present, since the compressibilities of gas and liquid vary differently with pressure variation. However, in practice this problem is probably so difficult as to defy solution in terms of basic data precision apt to be available.' It is the purpose of this discussion to illustrate the second case, which involves the determination of two unknown variables, single phase reserves and degree of water drive, from pressure and production history and fluid property data, and to study the precision with which these unknowns can be determined in this manner in a particular case. Although an electric analyzer developed by Bruce as used in making the calculations to be described, numerical methods necessary in carrying out the process have been devised and have been applied for this purpose. Schilthuis,' for example, developed a comprehensive equation for the material balance in a reservoir. He combined this with a simplified water drive equation, assuming that the ratio of free gas to oil was fixed by geological data and that a period of constant pressure operation at constant rate of production was available to determine the constant for his water drive equation. On this basis he was able to compute the reserves and predict the future pressure history of the reservoir. Hurst developed a generalized equation permitting the calculation of the water drive by unsteady state expansion from a finite aquifer. He showed in a specific case how the water influx calculated by his equation, using basic geologic and reservoir data to fix the constants, matched the water influx required by material balance considerations. Old3 illustrated the simultaneous use of Schilthuis' material balance equation and Hurst's fluid flow equation for the determination of the magnitude of reserves and a water drive parameter from pressure and production history. He used this method to calculate the future pressure history of the reservoir under assumed operating conditions. As a basis for determining reserves, Old assumed a value for his water drive parameter and calculated a set of values for the reserves, using the initial reservoir pressure and each successive measured pressure. The sum of the absolute values of the deviations of the resulting reserve numbers from their mean value was taken as a criterion of the closeness of fit to the experimental data possible with the water drive parameter assumed. New values of the water drive parameter were then assumed and new sets of the reserves calculated until a set of reserves numbers having a minimum deviation from the average was established. The average value of- the re-
Jan 1, 1949
-
Institute of Metals Division - On the Yield Stress of Aged Ni-Al AlloysBy N. S. Stoloff, R. G. Davies
A study has been made of the efject oj different dislocation-precipitate interactions upon the temperature dependence of the flow stress of aged Ni-14 at. pct A1 alloy. It is observed that when the dislocations bow between widely spaced (-20004 coherent Ni3Al particles the flow stress decreases with increasing temperature in the normal way. However, when the dislocations cut closely spaced (-5004 particles the flow stress is independent of temperature from -100 to 600°C, due to a balance between softening of the matrix and an increase in strength of the particles with increasing temperature. The retention of strength at high tempera-tures of commercial nickel-base alloys, which are strengthened by the precipitation of a phase based upon Ni3Al, is thought to be due to the unusual strength properties of Ni3Al. The flow stress of Ni3Al increases continuous1y from -196"C to a maximum at -600"C. It is concluded from a series of thermal-mechanical tests that the sevenfold increase in flow stress over this temperature interval is due to a lattice effect and is not diffusion-controlled. The flow stress of precipitation- or dispersion-hardened materials depends on the resistance to dislocation motion within the matrix and the extra energy required for dislocations to bow between or to cut particles. If the dislocations bow between the particles or if the strength of the cut particles is constant with temperature, then the flow stress of the precipitation-hardened alloy must decrease with increasing temperature due at least to the decrease in elastic modulus of the material. There will be softening also from thermally activated cross-slip or climb, offering an additional degree of freedom for dislocations to avoid particles. For example, in the case of nickel containing a dispersion of thoria,' which most probably deforms by dislocations bowing between particles, the flow stress decreases by about 50 pct between 25" and 650°C. In A1-Cu alloys2 aged to produce the 8" precipitate, dislocations cut the particles, and the flow stress decreases by about 20 pct between -269" and 25°C. However, many commercial high-temperature nickel-base alloys, for example Inconel-X and Udimet-700, exhibit little or no decrease in flow stress with increasing temperature up to about 700°C. A characteristic feature of these alloys is that they are strengthened by the precipitation of a phase based upon Ni3A1. Guard and westbrook4 and flinn' have shown that Ni3Al (and alloys in which a third element such as molybdenum or iron is substituted for part of the aluminum) is unusual in that the hardness and flow stress increase with temperature to a maximum at about 600°C. For the flow stress of a precipitation-hardened alloy to be independent of temperature we propose that the particles must be cut by dislocations moving through the matrix and that the strength of the particle must increase with increasing temperature. Theories of precipitation hardening do not take into account the flow stress of the dispersed particles that are cut during deformation; the only dissipative process usually considered7 is the creation of interface within the particle and between the precipitate and matrix. The purpose of the present investigation has been to study in detail the temperature dependence of the flow stress of a nickel-base alloy strengthened by the precipitation of Ni3Al in two structural conditions such that when deformation occurs it does so by dislocations a) bowing between the particles and b) cutting the particles, respectively. A simple binary Ni-14 at. pct A1 alloy was chosen because considerable information is already available for this system concerning phase equilibria and precipitation reactions and rates.' Dislocation-precipitate interactions in the binary alloy should be similar to those in the more complex commercial alloys. In addition, the mechanical and physical properties of NisAl were studied in detail in the hope of elucidating the mechanism by which the strength increases with increasing temperature up to 600°C. EXPERIMENTAL PROCEDURE For the study of the effect of precipitation of Ni3A1 upon the temperature dependence of the flow stress, an alloy containing 14 at. pct A1 was utilized; a Ni-8 at. pct A1 solid-solution alloy was employed as a comparison material. Vacuum-cast ingots were hot-rolled at 1000°C and cylindrical compression samples, 0.20 in. diam by 0.40 in. high, were prepared from the 1/4-in.-diam rod. Specimens were recrystallized and solution-treated at 1000°C for 1/2 hr and then water-quenched. A preliminary study revealed that, when the Ni-14 at. pct A1 alloy was aged for 1 hr at 700°C, significant precipitation hardening was obtained, and that the structure was free from grain boundary discontinuous precipitation; an overaged condition was produced by annealing the aged specimens at 850°C for 1 hr. To circumvent the difficulties involved in the hot rolling and swaging of Ni3A1, compression samples,
Jan 1, 1965
-
Reservoir Engineering - Estimation of Reserves and Water Drive from Pressure and Production HistoryBy E. R. Brownscombe, Francis Collins
A study has been made of the material balance-fluid flow method of estimating reserves and degree of water drive from pressure and production history data. By considering the effect of random pressure errors it is shown that in a particular example a standard deviation of three and one-half pounds in each of ten pressure survey? permits the determination of the reserves with a standard deviation of 8 per cent and the water drive with a standard deviation of 15 per cent, assuming that certain basic geologic data are correct. It is believed that this method of estimating reserves and water drive is useful and reliable in a number of cases. The method is particularly valuable when reservoir pressure data are accurate within a very few pounds, but may also be applied with less accurate pressure data if a relatively large reservoir pressure decline occurs early in the life of the field, as for example in an under-saturated oil field. INTRODUCTION A knowledge of the magnitude of reserves and degree of water drive present in any newly discovered petroleum reservoir is necessary to early application of proper production practices. A number of investigators have contributed to methods of relating reserves, degree of water drive, and production and pressure history. 1-8 Three types of problems of increasing complexity may be mentioned. If a reservoir is known to have no water drive. and if the ratio of the volume of the reservoir occupied by gas to the volume of the reservoir occupied by oil (which ratio permits fixing the overall compressibility of the reservoir) is known, then only one further extensive reservoir property remains to be determined, namely the magnitude of the reserves. A straightforward application of material balance considerations will permit this determination. The problem becomes very much more difficult if we wish to determine not only the magnitude of the reserves but also the magnitude of water drive, if any, which is present. In principle, a combination of material balance and fluid flow considerations will permit this evaluation. Finally, if neither the magnitude of reserves, the degree of water drive, nor the ratio of oil to gas present in the reservoir is known and it is desired to determine all three of these variables, the problem could in principle be solved by a fluid flow-material balance analysis which determines the overall compressibility of the reservoir at various points in its history. The change in compressibility with pressure would provide a means of determining the ratio of gas to liquid present, since the compressibilities of gas and liquid vary differently with pressure variation. However, in practice this problem is probably so difficult as to defy solution in terms of basic data precision apt to be available.' It is the purpose of this discussion to illustrate the second case, which involves the determination of two unknown variables, single phase reserves and degree of water drive, from pressure and production history and fluid property data, and to study the precision with which these unknowns can be determined in this manner in a particular case. Although an electric analyzer developed by Bruce as used in making the calculations to be described, numerical methods necessary in carrying out the process have been devised and have been applied for this purpose. Schilthuis,' for example, developed a comprehensive equation for the material balance in a reservoir. He combined this with a simplified water drive equation, assuming that the ratio of free gas to oil was fixed by geological data and that a period of constant pressure operation at constant rate of production was available to determine the constant for his water drive equation. On this basis he was able to compute the reserves and predict the future pressure history of the reservoir. Hurst developed a generalized equation permitting the calculation of the water drive by unsteady state expansion from a finite aquifer. He showed in a specific case how the water influx calculated by his equation, using basic geologic and reservoir data to fix the constants, matched the water influx required by material balance considerations. Old3 illustrated the simultaneous use of Schilthuis' material balance equation and Hurst's fluid flow equation for the determination of the magnitude of reserves and a water drive parameter from pressure and production history. He used this method to calculate the future pressure history of the reservoir under assumed operating conditions. As a basis for determining reserves, Old assumed a value for his water drive parameter and calculated a set of values for the reserves, using the initial reservoir pressure and each successive measured pressure. The sum of the absolute values of the deviations of the resulting reserve numbers from their mean value was taken as a criterion of the closeness of fit to the experimental data possible with the water drive parameter assumed. New values of the water drive parameter were then assumed and new sets of the reserves calculated until a set of reserves numbers having a minimum deviation from the average was established. The average value of- the re-
Jan 1, 1949
-
Industrial Minerals - Importance and Application of Piezoelectric MineralsBy Hugh H. Waesche
Of all the military services, the Signal Corps is the most concerned with piezoelectric minerals because of its function as a supply service to the strategic and tactical military forces. Consequently this paper is written from the point of view of one associated with that organization. The Signal Corps is responsible for the research, development, and supply of communications, radar, and components to the using services of the Department of the Army and to some extent the Other branches of the National Defense Department. Their work therefore includes the study of the sources* characteristics, and application of quartz and other piezoelectric materials. These materials have become a vital consideration in strategic planning and are essential for efficient tactical operation by all the Armed Forces. The Signal Corps at the beginning of world War 11 Was respon-sible for both Army Ground and Air Force electronic equipment. Since that time this Army service organization has probably done more in the development of frequency control devices using piezoelectric materials than any other group. The U.S. Department of the Interior, Bureau of Mines, Minerals yearbook of 1945, shows that during the four war years, 1942 through 1945, 9,598,-410 Ib of quartz crystal were imported for all uses and of this total, 5,168,000 lb were consumed to produce 78,320,-000 crystal units for electronic application. Other government records confirm these data which conclusively show that approximately 53 pct of the crystalline quartz imported was consumed in the production of electronically applied quartz crystal units. It may be assumed that some effort was made to maintain a stockpile over demands for all purposes. and this would mean that the actual percentage of quartz used electronically was considerably over the 53 pct figure. These data only emphasize that electronic application of crystalline quartz was the greatest requirement, and per- haps the actual value in this application to national defense is many times greater in importance than is apparent on first inspection. Current electronic research and development programs of the Armed Forces are planned around the fundamental use of piezoelectric minerals for frequency control and this at present, at least, means quartz. Definition and Early Development The word piezoelectricity is formed from combination of the Greek word "piezein". meaning "to press," and "electricity." It is that property shown by numerous crystalline substances whereby electrical charges of equal and opposite value are produced on certain surfaces when the crystal is subjected to mechanical stress. It appears to be intimately associated with the better known property, pyro-electricity and in fact, the two may be manifestations of the same phenomeuon. This property was discovered by Pierre and Jacques Curie in quartz, tourmaline, and other minerals in 1880 while studying the symmetry of crystals. The converse effect, that is, mechanical strain in the crystal when placed in an electrical field, was predicted by the French physicist, G. Lippman, in 1881, and verified by the Curies almost immediately. As has been the case with many discoveries of similar character in the basic sciences, not much attention was paid to this property for man)- years except as an entertaining curiosity. Between 1890 and 1892 a series of papers was published by W. voigt in which the theoretical physical properties were put into mathematical form. The first practical application of piezoelectricity occurred during World War I when professor P. Langevin of France used quartz mosaics to produce underwater sound waves. The same mosaics were used to pick up the sound reflections from submerged objects which were in turn, amplified by electronic means and used to determine the distances to such objects. This device was intended for use as a submarine detector but development was not completed in time for war service although it was used later for determining ocean depths. About the same time, A. M. Nicholson, of Bell Telephone Laboratories, developed microphones and phonograph pickups using Rochelle salt crystals. A major step in the application of piezoelectric quartz came in 1921, when professor W. G. Cady, of wesleyan university, showed that a radio oscillator could be controlled by a quartz crystal; from that date, this use of quartz has increased steadily, reaching its peak in world war 11 as is shown by the figures previously given. Essentially all American electronic equipment for communication, navigation, and radar, utilized quartz crystals for the exacting frequency control required. Crystalline Minerals with piezoelectric Properties QUARTZ Hundreds of piezoelectric crystalline materials are known, most of which are water soluble. Of these, quartz appears to be without a peer for electronic frequency control. Unfortunately, the quartz must be of superior quality. It must be free of mechanical flaws, essen-tially optically clear, free of both Brazil and Dauphiné twinning and must be, for average uses, over 100 g in weight. Because of these stringent requirements, raw quartz of the quality desired is of rare occurrence. In addition to quartz, several other naturally occurring crystalline materials are known to have the piezoelectric property and could perhaps be substituted for quartz in some applications. These
Jan 1, 1950
-
Metal Mining - Mine Drainage at Eureka Corp., Ltd., Eureka, Nev.By George W. Mitchell
THE property of Eureka Corp. Ltd. is located in the approximate geographic center of Nevada, 2 miles from Eureka, the county seat. The great sources of power, the Colorado, Snake, and Salmon Rivers and the rivers of northern California, are 300 to 500 miles distant, and no lines serve areas closer than 150 miles. Fuel for diesel and steam generation is available in Utah, 300 to 400 miles to the east. Eureka's railhead is 80 miles north where two trunk lines cross the county. A spur line serves Ely, 77 miles east. Good highways connect Eureka to the railheads. Activity in the Eureka mining district began in the early 1870's. The oxidized high grade lead-sil-ver-gold ore terminated against the footwall of the Ruby Hill fault, and in 1890 the main operations ceased. In 1938 Eureka Corp. Ltd. discovered ore in the hanging wall of the fault by diamond drilling. The history of Eureka in the late 1800's indicates that there was some water at 600 to 800 ft in the old workings, probably accumulations above the water table which did not seriously interfere with mining operations. Both the Locan and Richmond shafts were sunk to a level below the table, but apparently the only serious difficulty with water occurred in the Locan. The steam pump used when the last work was done on the 1200 level in 1923, many years after exhaustion of the main orebodies, is still installed on the Locan 900 level. The capacity was about 500 gpm, lifting 750 ft to the 100 level, which connected with the surface. In addition to this. bailers were used to keep the 1200 level free of water. It is said that pumping in 1923 lowered the water in the Holly shaft, about a mile and a half away, but this seems doubtful. The pumping was of short duration because no ore was found. When work at the new Fad shaft was started in 1941 Eureka Corp. Ltd. engineers were fully aware of the probability of encountering water in large volume. Their primary exploration and development had to be carried on at the 2250 level. The first water was encountered at 300 ft. This was undoubtedly surface drainage in the bedding of the Pogonip limestone and was less than 100 gpm. The fractured, loose Hamburg dolomite at the water table was not well cemented, and relatively little water, 300 gpm, percolated through it with difficulty. At 1350 ft well-cemented dolomite containing some open fractures was encountered. These fractures produced the first water of consequence, 750 gpm. At 1700 ft the volume was 1000 gpm increasing to the maximum during shaft sinking, 1600 gpm, at the 2000 level. Secret Canyon shale, a dry formation, was entered at 2100 ft, where a concrete water ring was placed to catch all of the water. The volume decreased rapidly to a constant flow of 1200 gpm. Below 2100 ft the shaft and stations remained in the shale and water was not a problem. Several faults of moderate displacement, including the reverse Martin fault, had been intersected during the traversing of 1000 ft of wet Hamburg, but no undue quantities of water were encountered. Observations in the diamond drill holes in the ore zone area showed a rapid lowering of the water table. The shaft was flooded when it left the dry shale and entered the water-bearing Eldorado dolomite on the 2250 level, crossing a fissure which paralleled the Martin fault. High pressure water doubled the volume then being pumped. Pipe failure through a water door bulkhead was a contributing factor. Immediately following this flooding in March 1948 preparations were made to recover the shaft as rapidly as possible by increasing power and pump capacities as needed. Measurements before flooding indicated the water could be lowered at a fast rate. However, the water table did not recede as rapidly as expected and volumes required to lower the water in the shaft were higher. Obviously the size of the main water channel on the 2250 level was increasing because of erosion, allowing greater volumes to enter the workings and draining beyond the cone originally being drained during shaft sinking. Eroded material was being deposited in the shaft below the 2250 level in serious proportions. In December 1948 a second flooding of the Fad shaft was allowed for the purpose of reassessing existing conditions and studying alternate methods of attack. The detailed geology of the Eureka mining district, see Fig. 1, has been described during the past 75 years by many geologists.' Only the general features and those which seem to affect the drainage problem will be discussed. The old ore zone, mined between 1870 and 1890, is located in a wedge-shaped block of Eldorado dolomite between the footwall of the Ruby Hill fault and the underlying Prospect Mountain quartzite, see Fig. 2. Production of high grade oxidized lead ore containing high values in gold and silver has been variously estimated at $50 to $90 million. The tonnage mined was probably close to 1,500,000, nearly all of which was found above the water table. The new ore, discovered by diamond drilling in the hanging wall of the Ruby Hill fault, is a flat-
Jan 1, 1954
-
The Paley Report: ManganeseHIGH-GRADE manganese ore, from which manganese is obtained commercially, is not found in large quantities in any major steel-producing nation in the free world. The U. S. is a "have not" nation with respect to deposits of directly mineable high-grade manganese ore. Known resources of 48 pct Mn or better grade ore amount to less than 200,000 tons. In 1950 the U. S. steel industry consumed 1.8 million short tons of metallurgical grade manganese ore that contained about 800,000 tons of manganese. About 16 pct of the manganese content was lost in processing, so that about 650,000 tons, or 13 pounds per ton of steel actually entered into steel production. Under present practices use expands directly with steel output, and by 1975 the demand in both the U. S. and the rest of the free world is expected to be roughly 60 pet greater than in 1950. In peacetime about 80 pet of manganese consumption goes into steel production; high-manganese steel, dry cells, and chemicals account for the remainder. The manganese supply problem centers around high-grade ore for ferromanganese production. Use of ores containing less than 35 pet Mn sharply increase the costs of making ferromanganese. Use of ferro-manganese of grade below 70 pet in turn requires changes in steelmaking that increase steel cost. Under normal conditions the present small domestic production cannot be expected to increase. Major resources in the U. S. consist of 12 low-grade deposits. The cost of mining and treating these ores to extract a product as good as that yielded by imported ores is at least twice and in some cases more than four times the 1951 price of foreign ores delivered to the U. S. However, as long as trade relations and overseas shipping are not interrupted, deposits in India, Africa, and Brazil can meet steadily increasing demand at approximately present costs. Cost considerations indicate that the U. S. should continue to rely upon overseas sources for its peace-time supply, and that this situation is satisfactory. But, this does not take into account the question of how the U. S. will be able to meet its needs in war. Position of the Rest of the Free World In 1950, free world steel producers outside the United States, with a steel output of 70 million ingot tons, consumed about 1.3 million tons of metallurgical-grade ore. Their manganese ore demand, expected to increase directly with steel production, will by 1975 be about 2.3 million tons. Russia possesses over half the known manganese ore reserves of the world and is producing twice the tonnage of any other country. It supplied more than a third of the U. S. manganese requirements up to 1938 and again in 1948, but by 1950 Soviet manganese exports to the free world had virtually ceased. The free world's supply of manganese now comes mainly from India and Africa. Somewhat over 10 pet of U. S. imports came from Brazil and Cuba. Security Considerations In the event of war the U. S. might be substantially cut off from 90 pet of present sources. Reduction in manganese specifications might cut consumption by over 10 pet without seriously affecting steel quality. By elimination of losses in the production of ferromanganese savings as high as 10 pet might be possible. But, wartime manganese requirements cannot be met through conservation alone. To meet possible future emergencies the U. S. should continue its comprehensive security program for manganese, including stockpiling and research on the economic use of low-grade ore, domestic ores, the recovery of manganese from slag and the reduction of manganese requirements in steel production. If this work, including additional pilot plant operation is pursued vigorously, it should be possible in an emergency to get an adequate supply of manganese from domestic sources. The national stockpile then can be looked upon as a source of supply during the period of at least 2 years required to reach full-scale production from low-grade resources. Ferromanganese Smelting In comparison with smelting of pig iron, ferro-manganese smelting is a very wasteful process. Under present ferromanganese blast-furnace smelting practice, about 8 pet of the manganese in the furnace charge is lost to the slag, and roughly the same amount is lost to the stack gases; the total loss approaches 15 pct. Present practice is a compromise between excessive slag loss and excessive stack loss. In fact, it may be seriously questioned whether conventional blast furnace design is suitable for manganese smelting. U. S. Resources The known manganese deposits of the U. S. contain a total of 3500 million long tons of raw material and 75 million long tons of metallic manganese. More than 98 pct of this contained metal is in 12 large low-grade deposits of which the most important are those at Chamberlain, S. Dak; Cuyuna, Minn.; Aroostook County, Maine; and Artillery Peak, Ariz. Reserves of high-grade ore (48 pct Mn) amount to less than 200,000 tons. About 20 million tons of ore average over 15 pct Mn, and when grade is decreased to 10 pct Mn reserves amount to about 100 million long tons. If cut-off grade is decreased to 5 pet Mn, resources amount to 800 million long tons. Many of these low-grade ores may be beneficiated by flotation or other concentration methods. Pyrometallurgical Methods For smelting ferromanganese, it is essential to have an ore containing at least 50 pct manganese, with an Mn:Fe ratio of about 8:1. Direct smelting of 20 pct Mn concentrates is not promising. The only method that offers any promise involves two-step smelting.
Jan 1, 1952
-
Producing–Equipment, Methods and Materials - Laboratory Study of Paraffin DepositionBy E. B. Hunt
Paraffin deposition has been studied in the laboratory under conditions simulating deposition in well tubing. A theoretical analysis has been made of the cooling of the oil and the precipitation of paraffin from the oil as it flows up the well tubing and through surface flowlines. It is proposed that paraffin deposits are initiated by the precipitation of paraffin directly on or adjacent to the pipe wall and grow by diffusion of paraffin from solution to the deposit. This mechanism is consistent with laboratory and field observations, and has proved useful in the design and interpretation of laboratory paraffin-deposition tests. Tests have been made of the effect of plastic pipe coatings and chemical additives on paraffin deposition. INTRODUCTION Paraffin deposits which form in well tubing and surface flowlines interfere with production and must be removed. Over the years much progress has been made in developing and improving methods of removing these deposits after they form. Much less progress has been made in developing methods of preventing or inhibiting the formation of paraffin deposits. This is due, it is believed, to the lack of knowledge of the mechanism of paraffin deposition, the absence of satisfactory laboratory testing methods and the difficulties in evaluating the results of field tests of preventive treatments. The present investigation was undertaken to elucidate the mechanism of paraffin deposition and to develop suitable laboratory tests for studying the inhibition of paraffin deposition in well tubing and surface flowlines. Current theories on the mechanism of paraffin deposition have been evolved from field observations, from laboratory studies of various factors which might be involved in paraffin deposition, and from laboratory paraffin-deposition tests.1-9 Paraffin deposits have been formed in the laboratory by immersing a cold finger into a hot wax-oil solution and by flowing hot wax-oil solutions through cooled pipe or over cooled plates. These laboratory conditions differ in important features from field conditions, and the observed deposition behavior is not entirely field-like." Thus, there is reason to question the field applicability of the results of these tests. The present investigation was undertaken to determine how to perform and interpret laboratory paraffin-deposition tests to obtain information on the inhibition of deposition in the field. The paraffin problem in the broadest sense encompasses the formation of any predominantly organic deposit in well tubing, surface flowlines and other equipment in contact with crude oil or gas. The present investigation was limited to paraffin deposition involving the precipitation of paraffin wax from solution by cooling and its concentration in a deposit on a cooled surface. This probably excludes its applicability to those problems arising from asphaltic-base crudes, but not those arising from paraffin-or mixed-base crudes. This also excludes its applicability to emulsion and congealing oil problems which are often included as part of the paraffin problem. The phenomenon of cooling appears to be the controlling factor in paraffin deposition involving the precipitation of paraffin wax and its concentration in the deposit. Deposits of this type are usually found in the field only where cooling occurs. Early in this laboratory investigation, it was not found possible to form deposits under constant temperature conditions from a wax-oil slurry, either by steady flow through pipe or by gas-lift up a pipe. Thus, the investigation was limited to situations involving cooling. THEORY The relationships involved in establishing the temperature profiles in an oil stream as it flows up well tubing with a linear (geothermal) pipe-wall temperature distribution or through surface flowlines with essentially constant pipe-wall temperature are presented in the Appendix. The relationship between radial distance in the pipe and the rate of cooling of the oil is then combined with a relationship between cloud point and rate of cooling to develop the pattern of formation of a wax cloud in the oil. The following discussion of paraffin deposition under various laboratory and field conditions is based upon this development which is presented in the Appendix. PARAFFIN DEPOSITION IN SURFACE FLOWLINES The average temperature of the oil coming out of a well is somewhat higher than the ground temperature. Thus, the oil continues to cool on its trip through the surface flowline, and wax deposition can occur. The temperature distributions calculated from Eq. A-4 are given in Fig. 1. As can be seen, almost all the cooling occurs in the first 500 ft from the wellhead. In addition, the radial temperature gradient near the wall decreases rapidly with distance and becomes very small after a few hundred feet. Thus, growth of a paraffin deposit would be expected to decrease rapidly with distance from the wellhead and become negligible after a few hundred feet, since growth is dependent on concentration gradient. Wax precipitation and diffusion of wax to the already
-
Mine ReportsBy Samuel H. Dolbear
THE purpose of a technical report is to record facts, usually collected by investigation, and to interpret these facts in understandable language. The audience may range from a small shareholder without technical knowledge, to a highly trained engineer or geologist. If the client is a mining company with technically trained executives, the report writer's problem is relatively simple. The writer will then be appraised not only for his conclusions, but for clarity of language and organization of the report. If the writing is bad, the construction careless, and there is a failure to clearly convey to the reader the facts and the author's conclusions, the report is a failure and the writer may have damaged his professional character. Spoken words die quickly, written words may constitute a permanent record and if they are badly composed they may rise up to damn the author. "A good measure of an author's understanding of his subject is his ability to express it clearly in plain words." Good English Teachers in the fields of mineral technology have frequently complained that even in post-graduate groups there is an appalling indifference to their appeals for good English. Some have even noted a student's belief that the use of refined English is effeminate. If those with such immature beliefs could measure the pay-check damage arising from the use of "sloppy" language, they would realize that precision and refinement in English may be quite as important as technical accuracy. When the reader audience is without technical knowledge simplicity in treatment becomes especially important. If one is engaged in consulting work, in government service, or in any field where reports have public distribution, the language employed should be technically adequate but simple enough to be understood by non-technical readers. For example, one may use the term "visual" in place of "megascopic." Technical language can be so obscure that it cannot be understood even by highly-trained students. In the March-April (Vol. 47-No. 2) issue of Economic Geology, Nicholas Vanserg ridicules these extremes and quotes various paragraphs from published material, such for example: "However, lattice orientation unaccompanied by cognate dimensional orientation can never be attributable to growth from an isotropic blastetrix." "The temperature declines because of cessation of the exothermic chemical and mechanical equilibriopetal processes." These he calls "good geologese" and they are calculated not only to baffle the reader but to impress upon him the erudite character of the author. Revision In some cases, difficulty arises from the fact that the writer is too close to the subject and unconsciously assumes that his reader is equally familiar with the background of the report. It is difficult for the writer to regard his work objectively and to determine to what extent it is likely to be understood. Every important manuscript will gain in clarity if the author will have it reviewed by an informed reader. But the writer must not be oversensitive to criticism and should not treat his composition as perfect and beyond the possibility of improvement. The first draft of a report always requires revision, regardless of the care used or the ability of the writer. Three or four revisions are not uncommon. The first draft usually requires expansion in places, the deletion of non-essential material, and language changes to promote clarity of expression. This should be done by the author after a lapse of time, even if only overnight, in which his mind has been occupied on some other subject. Possible improvements are always more visible. The manuscript should be passed on to another reader for further suggestions. Organization of Material The engineer should study available reports and library references before going into the field. If the previous reports have been responsibly done and can be accepted as correct, then much field time can be saved. It is, of course, customary to make some on-the-ground checks to confirm earlier reports, particularly those relating to ore reserve which may have undergone changes. Report writing requires time and expense, but nevertheless, the basic reasons for conclusions should be presented even in the case of a worthless property, for it may prevent a duplication of the work. If the mine examined is obviously of no further interest, no useful purpose can be, served by preparing a report in detail. In one case an engineer travelled all the way to South America only to find that the mine had been grossly misrepresented and was valueless. His cabled report "Nonsense" is a case of over-simplification, but it served his company's purpose. The first step in report organization should be the selection of subjects. This should be done at the mine, and the data collected for each subject should be reviewed in considerable detail on the ground. Otherwise one may find that he has failed to collect some essential details not readily obtained after he has returned to headquarters. If the property to be described is undeveloped, then many of the subject titles are automatically eliminated. Usually no useful purpose is served by an attempt to calculate the cost of production under such circumstances, although the cost of exploration
Jan 1, 1952
-
Iron and Steel Division - Further Studies of the Tuyere Zone of the Blast Furnace (correction page 1018)By J. B. Wagstaff
The raceway in front of the tuyere of the blast furnace has been studied quantitatively and a correlation obtained for the penetrastudiedtion of the blast. Some evidence is presented for the height and width of the raceway which suggests that all the raceways of a ffurnace overlap. The size of the coke in this zone has been measfurnaceoverlap.ured photographically during normal operation and results are given for the various areas. IN an earlier paper,' it was shown that a raceway exists opposite each tuyere of a blast furnace. This raceway is formed by the jet effect of the air emerging from the tuyere and consists essentially of a turbulence in which coke particles are recir-culated at high speed. Its presence was deduced originally from observations on movies taken with a high-speed camera through the tuyeres of various furnaces and was confirmed by experiments made on a model. In the model described,' this raceway was shown as operating in a vertical plane only, although there was a suggestion in the motion-picture film exhibited at that time that the raceway was three dimensional, unless artificially restricted. There was also some doubt then about the factors influencing its size. This paper describes the next steps in the investigation. Since the size of the raceway is obviously of importance in the operation of the furnace, it seemed worth while to study the subject more carefully. It is probably in this region that about half the coke in the furnace is consumed, so that the movement of the stock column may well be controlled by raceway behavior. Furthermore, there is some evidence to suggest that the coke is packed densely in the center of the furnace to form the "dead man" and more loosely above the raceway. It is therefore probable that the bulk of the gases passing up the stack flow from the top surface of this raceway. Clearly then, a knowledge of this critical zone is of interest to the blast furnace operator, and the first half of this report is devoted to a quantitative discussion of the subject. A further topic of interest among operators is the degree of breakdown of coke in the furnace, with which is inseparably linked the importance of a strong coke. Indeed, the whole question of the optimum size and type of coke may be as dependent on the condition of the coke in the bottom of the blast furnace as at the top. Attempts have been made from time to time to obtain samples of coke from the tuyeres and other furnace openings but they all suffer from the fact that the coke is filled to a varying degree with metal and slag and is probably broken up by the very act of taking the sample. It has proved difficult to make any reliable studies of coke size by these methods. However, it did seem possible to use the highspeed movies mentioned earlier1 to estimate the size of the coke. These movies provide an accurate record of individual coke particles so that, in theory at least, it should be possible to measure the size of the particles one by one and to obtain, for the first time, information on the coke being blown around the raceway under actual operating conditions while the furnace is performing normally. Such a study has been made and is discussed in the second half of this paper. The results obtained enabled the blast furnace data to be correlated with the model results given in the first half. Raceway Size In order to make a quantitative study of the size of the raceway it was necessary to devise some apparatus of laboratory scale, which could be handled quickly and easily. This focused attention on models, which in turn means that the laws of similarity governing this particular process must be ascertained. Method of Procedure: Since the work was to be carried out on a smaller scale than the blast furnace, the linear dimensions of the model became unimportant provided that the scale was known; it is only important to insure that the container does not affect the raceway being observed. The studies therefore were carried out in a glass-sided box, 11 in. high x 7 in. wide x 3 in. deep, using air jets ranging
Jan 1, 1954
-
Extractive Metallurgy Division - Sintering Practice at Josephtown SmelterBy Karl F. Peterson, H. K. Najarian, Robert E. Lund
PRIMARY products of the Josephtown smelter are zinc metal of various grades, lead-free zinc oxide pigments, cadmium metal, and sulphuric acid. Zinc concentrates of domestic and foreign origin are blended and desulphurized at the roaster plant. The equipment includes five, 12-hearth Herreshoff roasters and two modified Trail-type suspension roasters. The sulphur dioxide containing gases from the roasting operation are diverted to a four-unit contact acid plant for the manufacture of sulphuric acid. The roasted calcines are agglomerated by sintering on Dwight-Lloyd-type sintering machines; the sinter is crushed and sized within required limits; and the sized sinter is smelted in vertical shaft-type electro-thermic furnaces. Of the 13 electrothermic furnaces of various sizes now in operation, four are designed to produce American process zinc oxidc of various specifications; and the remaining nine furnaces are equipped with vacuum-type condensers and produce zinc metal. Papers describing the general smelting practice at Josephtown have been published by AIME. Since both High Grade zinc metal and lead-free zinc oxide pigments are produced direct from the electrothermic furnaces without need for subsequent refining, the elimination of impurities such as lead and cadmium has to be accomplished during roasting and sintering operations. To effect the producing of both High Grade and Prime Western zinc products, the roasting and sintering operations are on two separate circuits. A High Grade circuit produces finished sized sinter low in lead, cadmium, etc., for the High Grade furnaces; and the Prime Western circuit produces finished sinter destined for the furnaces producing Prime Western metal. Sintering at the Josephtown smelter differs in many important respects from the sintering practice in smelters operating horizontal retort zinc furnaces. Requirements of the electrothermic smelting furnaces define the physical characteristics of the sinter, while the chemical composition of the sinter is controlled according to the grade of metal and oxide to be made as final products. Three principal objectives in the sintering process at Josephtown smelter are: 1. To transform the zinc calcine from the roasting operations into a hard, yet porous agglomerate that will not crumble in the smelting furnace. 2. Crushing and sizing of the sinter to obtain a proper screen analysis which is normally —% in. down to +1/4 in. particle size. 3. To eliminate, particularly in the High Grade circuit, as much of the impurities such as sulphur, lead, and cadmium as possible. The sintering plant as originally built in 1930 was equipped with three standard 42 in. x 44 ft Dwight-Lloyd sintering machines. Each machine was equipped with a 15x60 in. sintering corporation fan driven by 150 hp, 900 rpm synchronous motor through a magnetic clutch and capable of delivering 30,000 cfm of air at 15 in. of water and 150°F. Each sintering machine was driven by 7½ hp dc motor with controllers for varying the speed of the machine from 8 to 32 in. per min. The pallets were cast iron and the grates of the herringbone type. The charge was mixed in a 4 ft diam x 8 ft Stehli pugmill and transported by belt conveyor, elevator and tripper conveyor to a small bin over each machine. Shortly after the start of operations the following changes were found necessary: 1. The herringbone grates which plugged very quickly and were difficult to keep clean were replaced by straight, narrow cast-iron grate bars running at right angles to the travel of the pallets. These grate bars are held in place by a center bar extending across the pallet on the 24 in. dimension and by removable retaining plates which form the sides of the pallets. 2. Mechanical grate knockers were developed in conjunction with new grate bars for continuously and automatically cleaning the grates. 3. As the cast-iron pallets cracked, they were replaced with cast-steel pallets. In 1938, the capacity of the sinter plant was increased with the installation of two 42 in. x 22 ft machines which were brought from the company's Herculaneum lead smelter. With a circulating load of some 250 to 300 pct, production of finished sinter on the 42 in. x 44 ft machines at this time amounted to about three tons of sized sinter per machine hour. In 1945, one of the 42 in. x 22 ft machines was replaced by a 60 in. x 44 ft machine of our own design. In 1948, as part of the plant-wide expansion program, the sinter plant not only was expanded but also divided into two separate plants; namely, Prime Western and High Grade circuits. The sinter destined for furnaces producing Prime Western zinc metal is made in a new plant comprising two 60 in. x 44 ft Dwight-Lloyd-type sintering machines, each having a 45,000 cfm Sturtevant fan at 18 in. water static pressure and served by an 8 ft diam x 12 ft long rotary charge pclletizer and auxiliary crushing and sizing equipment. The sinter destined for furnaces producing High Grade zinc metal and zinc oxide pigments is produced in the old sinter plant which was expanded to accommodate four of the 60 in. x 44 ft sintering machines, replacing the old sintering units. In the High Grade sinter circuit, two units of the 60 in. x 44 ft machines are used as preliminary soft sinter machines; and the remaining two units of the 60 in. x 44 ft machines are used to make finished hard sinter. Purification Theory Partial elimination of lead and cadmium in the sintering of zinc ores is common knowledge. However, by some manipulation and by taking advantage of the double circuit, it is possible to make zinc sinter which is nearly free of contaminators. Lead
Jan 1, 1952