Search Documents

  • IIMP
    Sistema de control maestro para sopladores en paralelo

    By Richard Manrique

    "La implementación del proyecto de modernización de la fundición de cobre de Southern Peru Copper Corporation requiere cambiar la metodología de funcionamiento de los sopladores para la etapa de conve

    Sep 19, 2006

  • SME
    Metallurgical Developments At Palabora Concentrator

    By Johann Steynberg

    The design and construction of a Concentrator based on initial pilot plant work is rarely perfect. Palabora's plant was no exception although the basic objective to produce copper in a safely con

    Jan 1, 1985

  • CIM
    Application of kinetics and liberation data to analysis of an industrial flotation process

    By N. W. Johnson

    "Two analysis tools which have been applied to problems in industrial flotation processes are the application of kinetics and detailed mineralogical or liberation data, both on a size-by-size basis. T

    Jan 1, 1987

  • AUSIMM
    Drawbacks in Sluice box operating Practices in Papua New Guinea

    Sluice box operating practices in Papua New Guinea (PNG), and published work on sluice boxes are briefly reviewed. Some recent work on sediment entrainment mechanisms occurring in sluice boxes hav

    Jan 1, 1991

  • AUSIMM
    The Geology of The Triton Gold Mine, Reedy, W.A.

    The method of investigation was to study the distribution of ore in great detail, to make a thorough structural study of the lode and the mine area, and then to compare the results of the two studies.

    Jan 1, 1943

  • CIM
    Spiral Surface Property Investigation

    By X. Louw

    "This paper examines the change in surface properties of the Polyurea used on spirals at different operational times: unused spiral, 28 months in operation and 58 months in operation. This is being do

    Jan 1, 2017

  • AUSIMM
    The Structural Evolution of the Hyde-Macraes Shear Zone at Round Hill, Otago, New Zealand

    The Hyde Macraes Shear Zone (HMSZ) is an extensive low angle semibrittle mineralised structure in the Otago Schist Belt, New Zealand. The shear zone is located on the lower limb of a late metamorphic

    Jan 1, 1992

  • CIM
    Discrete Event Control and Dynamic Scheduling for Tele-Robotic Mining

    By Jamie King

    This paper describes the use of dynamic scheduling and discrete event control to provide coordinated control of multiple automated vehicles. In the past decade there have been significant advances in

    May 1, 2001

  • AIME
    Discussion of Papers Published Prior to September 1963 - New Concepts in Thickener Design, Underflow Pump Arrangement and Automatic Controls

    By D. L. King, C. D. Rubert, R. W. Christy, B. A. Schepman

    R. W. Christy (Manager of Sales, Sanitary Engineering Equipment, Link-Belt Co.) and C.D. Rubert (Barrett, Haentjens & Co.) — Messrs. King and Schepman have presented an excellent paper which outlin

    Jan 1, 1963

  • AUSIMM
    Water Balancing in Mineral Processing - Issues and Opportunities

    Water Balancing in Mineral Processing - Issues and Opportunities

    Sep 13, 2010

  • SAIMM
    Establishment Of Rapid Prototyping/Additive Manufacturing In South Africa - Synopsis

    By D. J. de Beer

    South Africa had a late start with rapid prototyping (RP), with the first system being available in 1991. Up to 1994 only three systems were available in SA. Through active research participation from

    Jan 1, 2011

  • SME
    Electric Rope Shovel Monitoring

    By J. Hansen

    This paper has been written for presentation during the Open Pit Mining Session at the SME Annual Meeting and Exhibit, Denver, Colorado, February 26 to 28, 2001. The paper addresses the application o

    Jan 1, 2001

  • SAIMM
    Recycling And Environmental Issues Of Metallurgical Slags And Salt Fluxes

    By M. Reuter, U. Boin

    The target of the current metallurgical industry is to recycle and utilize all their by-products, so as to close the sustainable production loop. Slags are the important wastes and by-products of meta

    Jan 1, 2004

  • TMS
    Solvent Extraction Of Cu²+ With Laminar Flow Of Microreactor From Leachant Containing Cu And Fe

    By Jiang Feng, Li Chuanhua, Zhang Libo, Peng Jinhui, Ju Shaohua

    Solvent extraction of Cu2+ from the leaching liquor contain Cu and Fe use a microfluidic technology. Currently, the conventional copper extraction process has many problems such as long distance and s

    Jan 1, 2015

  • SME
    Improving Truck-Shovel Energy Efficiency Through Discrete Event Modeling

    By K. Awuah-Offei

    Energy efficiency has become significant due to cost and environmental considerations. Comminution and material handling have been identified as the two most energy intensive processes in mining. The

    Jan 1, 2012

  • AUSIMM
    Amphibole Au-Cu Skarn and Massive Sulfide Replacement at the Peak Deposit, Eastern Interior, Alaska

    By P Illig, R Newberry

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Recent exploration efforts in Eastern Interior, Alaska have discovered significant ca 72 Ma

    Mar 18, 2015

  • DFI
    Statnamic Pile Testing Case Studies

    By Michael J. Brown

    It is often necessary to undertake some form of pile testing to verify design calculations. Historically this has been limited to static and dynamic tests. Newer rapid testing methods such as Statnami

    Jan 1, 2006

  • ISEE
    Examination and Comparison of Shock Wave Characteristics in Open-Air Arena Test vs. Shock Tunnel Confinement

    By D J. McLane, J T. Rathbun, B T. Lusk

    The dynamics of explosive detonations are understood, however recreating a real-world, full scale scenario is costly. The use of a shock-tunnel allows testing to be done on a smaller scale, with the s

    Jan 1, 2013

  • SAIMM
    The effect of slimes content on the rougher spiral circuit in a heavy mineral sands operation

    By R. Abela

    Heavy mineral sands are usually beneficiated in a spiral concentrator circuit prior to separation of heavy minerals into streams of zircon, rutile and ilmenite. The performance of the spiral concentra

    Jan 1, 2003

  • DFI
    Reducing Construction Interference when Implementing Geotechnical Instrumentation and Monitoring in Urban Excavation Projects

    By Martin B. Hudson, Daniel Brescia, Zhangwei Ning

    Due to the complexity and sensitivity of surrounding environments, instrumentation and monitoring (I&M) is critical for many urban deep excavations. The objects to be monitored include shoring bulkhea

    Jan 1, 2018