Search Documents

  • SME
    A Review on the 3D Cartographic and Spatiotemporal GIS Models for Safety of Accidents in Deep Underground Coal Mines - Mining, Metallurgy & Exploration (2024)

    By Hakan Akcin, Pinar Eksert

    The aim of this study was the safety risk assessment of accidents that occur because of production dynamics in deep coal mining, one of the highly dangerous business class, with spatiotemporal GIS. In

    Apr 24, 2024

  • AUSIMM
    Mesozoic-Cenozoic Tectono-Magmatic Evolution and Metallogeny of the East China Continental Margin

    By S Hu, P Ni, H Xu, P Chen

    Indosinian (T) orogeny amalgamated the Mongolia-Xingan fold zone, the North China continent, the Yangtzi platform and the SE China fold zone into a unified continent. The early to middle Yanshanian (J

    Jan 1, 1995

  • SME
    Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3

    By Yifan Ding, Shemek Oginski, Patrick Finn

    The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,

    Jan 1, 2007

  • CIM
    Product stewardship at Dofasco: A discussion paper

    By B. W. Steele

    "Dofasco began operations in 1912 as a steel foundry located in Hamilton, Ontario. Today, Dofasco is a fully integrated mill that manufactures hot rolled, cold rolled, galvanized and tinplate steels.

    Jan 1, 1996

  • DFI
    Augered Cast-In-Place Concrete Piles In Flood Plains - 1.0 Introduction

    By Javaid M. Alvi

    This paper is an attempt to outline the emergence of Augered Cast-ln-Place piles as one of the more economical types of foundation for supporting high-rise buildings and heavily loaded structures rece

    Jan 1, 2001

  • AUSIMM
    Remarks on the Brown Coal Beds and Associated Deposits of the Werribee Plains, Victoria

    The district specially referred to in this paper comprises the very gently sloping country extending from the western shores of Port Phillip from the mouth of the Yarra to Footscray along the Bacchus

    Jan 1, 1902

  • AUSIMM
    Production of Sulphur Compounds by Reaction of Carbon and Sulphur Dioxide

    Variations in product distribution in the carbon-sulphur dioxide system due to variations in reaction temperature, sulphur dioxide concentration in the feed gas, and gassolid contact time were studied

    Jan 1, 1974

  • SME
    52. Discovery of the Yeelirrie Uranium Deposit

    By E. Cameron

    Yeelirrie lies toward the center of Western Australia, 650 km (404 miles) northeast of Perth (Fig. 1). The ore reserves have been estimated as 52.5 kt (57,871 tons) of contained U3O8, at an average gr

    Jan 1, 1991

  • AUSIMM
    Difficulties in Developing Mineral Ventures

    By P M. Outhwaite

    Everyone present today is especially aware of the need for minerals in this society of ours. The words 'especially aware' were deliberately chosen because this is a meeting of the NZ Branch

    Jan 1, 1976

  • SAIMM
    Methodologies In The Valuation Of Mineral Rights

    By E. V. Lilford

    A number of countries have introduced codes governing the valuation of mineral assets and securities. The African continent will follow suit in due course considering the importance of the global mine

    Jan 1, 2002

  • SME
    Removal Of Cadmium From Raw Indium By Physical And Chemical Methods

    By Z. H. Zhou

    It is difficult to remove cadmium from raw indium using only electrolytic refining because their standard potentials are similar. In this paper, physical and chemical methods were used to remove Cd fr

    Jan 1, 2007

  • SME
    Application of Derrick high frequency fine screening technologies in Kelsey Jig zircon tailings recovery (DuPont, Starke, Florida)

    By C. P. Kelley, T. J. McKeon

    Several recent developments in fine screening technology have been implemented at the DuPont Starke, Florida plant allowing enhanced zircon recoveries while minimizing operator requirements and total

    Jan 1, 2005

  • CIM
    Stratigraphic Positions of Mineralized in the Mount Bourbeau and Lac Berrigan Regions and their Significance

    By J. Guha, A. Gobeil, P. Pilote, A. Tremblay, E. Dimroth

    The Mount Bourbeau Lac Berrigan area is located just to the north of the Town of Chibougamau. The axial trace of the Chibougamau syncline borders the northern part of both areas. The area contains Arc

    Jan 1, 1984

  • AUSIMM
    Geoscan AMSS Leads to Gold Mineralisation at Crossroads, Qld

    By Honey F. R, Furnell R. G, Lyon R. J P

    A Joint Venture between Union Oil Development Corporation and Geoscan Proprietary Limited carried out an Airborne Multispectral Scanner Survey over approximately 15,000 square kilometres in the C

    Jan 1, 1989

  • SME
    Nature Friendly Sustainability: Mining

    By M. Javier

    This concept paper is presented in the hope of raising the awareness of mankind on the necessity for its peaceful coexistence with nature. It is a food for thought. It takes compromise and sacrifice o

    Feb 27, 2013

  • AUSIMM
    Lessons Learnt and Performance – Installing and Commissioning an Ausenco Carbon Reactivation Kiln in Africa

    By D Preedy, J K. Claflin, S R. La Brooy

    A gold mine in north-eastern Africa has expanded throughput from 5 to 10 Mt/y in recent years. The original carbon regeneration kiln was incapable of achieving required throughput or meeting process c

    Sep 7, 2015

  • SME
    Ventilation planning at Energy West?s Deer Creek Mine

    By L. Tonc

    In 2004, the engineers at the Deer Creek Mine located near Huntington, Utah initiated the ventilation planning to exploit a remote area of the mine?s reserves. This area was located under a mountain w

    Jan 1, 2009

  • AUSIMM
    Putting Geology and Engineering Back into Resource/Reserve Determination

    By M Darvall And R Fare, D Dormer

    The Argo Archaean lode gold deposit is hosted within a structurally complex shear zone system, 70 km south of Kalgoorlie, and 3 km west of the crustal-scale Boulder û Lefroy Fault. Argo is an active u

    Jan 1, 2006

  • CIM
    "Linatex Dewatering Equipment in Selected North American Applications"

    By T. A. Kirk

    "The Linatex Dewatering System is a compact, low capital and maintenance cost matched set of processing equipment suitable for solids recovery, dewatering and desliming sand-like materials in the rang

    Jan 1, 1978

  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999