Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Review Of Recent Accidents Involving Explosives TransportBy Richard J. Mainiero, James H. Rowland
When most people think of explosives transport they think of a hazardous operation. We all know that we aren’t allowed to transport explosives through tunnels and are discouraged from traveling throu
-
Production and Ventilation Management Towards in Integrated Mine Information SystemBy Ward M
The current and future requirements for an underground mine information management system are being met with a flexible, value-engineered approach to mine information/communication infrastructures.
Jan 1, 1995
-
Dispute Review Boards -- Current Status And RecommendationsBy Robert M. Matyas, P. E. Sperry, Robert J. Smith, A. A. Mathews
INTRODUCTION The first Dispute Review Board (DRB) was utilized on a tunnel project 20 years ago. Increasingly utilized on a wide range of construction projects, DRB's are becoming the norm on
Jan 1, 1995
-
Derivation Of Mineral Processing Environmental Sustainability Indicators Using A DEA Weight-Restricted AlgorithmBy I. Tsolas
This paper presents the use of non-parametric approach (i.e., data envelopment analysis, DEA) for the development of environmental sustainability indicators in mineral processing using environmental,
Jan 1, 2008
-
Part VIII – August 1968 - Papers - Study of the Manganese-Rich End of Mn-Sn SystemBy K. P. Gupta, A. K. Pal, L. Chandrasekaran, U. P. Singh
The Mn-Sn binary system, investigated at the high-manganese end and between 500° and 1000° C, shows four phases at temperatures below 727"C, namely the u Mn, the p Mn, the Mn3 Sn, and the Mn, Sn phase
Jan 1, 1969
-
Opening Speech for 2006 NZ Branch Annual ConferenceGood morning ladies and gentlemen, and may I thank you for inviting me once again to address your conference. I would first like to welcome you all, especially international delegates and conference s
Jan 1, 2006
-
Extending The Upper Particle Size Limit For Coal FlotationNovel flotation reagents were developed to improve the flotation of coarse particles. Laboratory tests conducted on an anthracite coal sample from Kyung-Dong Coal Company, Korea, showed that the reage
Jan 1, 2002
-
Exploratory Shafts For The Nuclear Waste Repository In BasaltBy Birger Schmidt
INTRODUCTION Conceptual design of the first Exploratory Shaft (ES-I) for the Nuclear Waste Repository in Basalt (NWRB) began in July 1981; detailed design began in February 1982, and was largely co
Jan 1, 1987
-
To Protect Pit-Wall By Means Of Chemical Grouting In Excavation Work Of Deep Foundation PitBy Xiong Houjin
In the excavation works of some deep foundation pits within the boundaries of Guangdong Province of China, though some measures, such as steel sheet piles, diaphragm walls, etc. were taken to protect
Jan 1, 1991
-
Annual Report - For The Year Ended 30th June, 2003Council for 2002/2003 President S.J. Ramokgopa President-elect T.R. Stacey Vice-presidents Senior F.M.G. Egerton Junior W.H. van Niekerk Immediate Past-president A.A.B. Dougla
Jan 1, 2003
-
The Impact Of Platinum Production From Ug2 Ore On Ferrochrome Production In South AfricaBy J. Basson, L. R. Nelson, L. A. Cramer
The South African based platinum mines produce the world?s majority of platinum metal that is used in autocatalysts and jewellery. As the platinum market is forecast to grow at healthy rates into the
Jan 1, 2004
-
Extractive Metallurgy Division - Thermodynamics of Iron-Silicate Slags: Slags Saturated with Gamma IronBy R. Schuhmann Jr., P. J. Ensio
As a first step in a study of the physical chemistry of copper-smelting slags, experimental measurements were made of the oxygen pressure of simple iron-silicate slags in equilibrium with solid iron.
Jan 1, 1952
-
Part VII – July 1969 – Communications - Metastable Solubility of Tungsten in AluminumBy A. Tonejc, A. Bonefacic
As can be seen from the phase diagram A1-W1 the equilibrium solubility of tungsten in aluminum is practically nil at room temperature. By quenching from the liquid state (50,000°C per sec), Varic, Bur
Jan 1, 1970
-
Expert Control Of A High Altitude Crushing PlantBy M. Valdebenito, J. Rajala
An OCS Expert control system was implemented by Svedala Cisa at the Minera Maricunga Refugio Crush-Leach Operation near Copiapo, Chile. The purpose of the Expert system was to maximize production thr
Jan 1, 2002
-
Enhancement Of Bacterial Iron And Sulfate Respiration For In Situ Bioremediation Of Acid Mine Drainage Sites: A Case Study (9e023564-700d-405d-941a-989b38ed4fb9)By A. A. Bilgin
The prevention of acid mine drainage (AMD) in situ is more attractive than down-gradient treatment alternatives that do not involve source control. AMD source control can be achieved by shifting the m
Jan 1, 2007
-
The Stillwater Paste Backfill PlantBy Frank Yu, Bob Fukuhara
"The Stillwater mine is a 3,000 tons/day platinum/palladium underground mine and flotation concentrator located in the Beartooth mountain range in south-central Montana. The site elevation is 5,000 fe
Jan 1, 2000
-
Inline analysis of washability parameters for process controlBy M P. Cipold, J F. Bachmann, C C. Bachmann, J Ha, H B. Wurst
In washability, the objective is to establish the set of maximum possible separation performance criteria for a given mineral feed. The method of choice for this has been the conventional sink–?float
May 9, 2017
-
Case Studies with the Falcon ConcentratorBy G. Naud, J. Robitaille, M. Buonvino, A. Veltmeyer, A. R. Laplante
"A B6 Falcon concentrator was tested on several systems: a synthetic magnetite-silica ore, a massive sulphide gold-copper ore, a fine gold-pyrite-silica flotation tail, and a high grade gold ore in a
Jan 1, 1993
-
Drilled Shaft Difficulties and a Micropile SolutionBy Jeff Jackson, Paul Axtell, David Graham
The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were
Jan 1, 2018
-
Pelletizing Fine Coal Recovered From Pumped RefuseBy H. N. Egan
Faced with a severe disposal problem of their fines from a coal mine in the heart of the Appalachian Mountains of extreme eastern Kentucky, Eastern Coal Corporation has built a special plant to pellet
Jan 11, 1967