Toppling failure — A proposed analytic solutionBy J. I. Mathis
"The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was
Jan 1, 2004
-
Old insurance policies : An often unrecognized source of pollution liability insuranceBy Walter R. Curtner
Many, if not most, of today's pollution liability claims are related to events ("occurrences") that happened in the past. This fact creates an opportunity to obtain a large amount of insurance co
Jan 10, 1987
-
Institute of Metals Division - Zirconium-Chromium Phase Diagram - DiscussionBy E. T. Hayes, A. H. Roberson, M. H. Davies
R. F. Dornagala and D. J. McPherson (Armour Research Foundation, Chicago)—I should like to compliment the authors for a workmanlike job in determining the partial phase diagram of a system comprised o
Jan 1, 1953
-
Process Development at the Raglan ConcentratorBy Joe Holmes, Peter Langlois
"Falconbridge’s Raglan Concentrator, located at the northern limit of Quebec’s Nunavik Region, has been in operation since December 1997. Originally designed to process 800,000 tonnes per year of high
Jan 1, 2001
-
Nui Phao mine – flotation circuit upgradeBy S Morgan, A Jakowetz, S Taylor, B Weekes, S Litson, P Bourke, T L. Do
In the current tough mining environment with lower commodity prices, operators need to improve operational profitability. Optimised equipment asset management is a sustainable way to achieve this obje
Sep 11, 2017
-
Design Methods For Earthquake-Induced Pile BendingBy George Mylonakis
The curvatures and subsequent bending imposed to piles by the surrounding soil during the passage of strong seismic waves is studied. This type of bending develops even in the absence of a superstruct
Jan 1, 2002
-
Construction Of Longueuil "Centre" 4.0 M Diameter Interceptor In The Montreal AreaBy Rudy Scarabelli, John R. Wagner
At one time explosives were the only economical means of rock tunnel excavation. Except in relatively long tunnels in the right rock explosives are still the cheapest means of rock excavation where th
Jan 1, 1987
-
A Simulation of a Multi-Pit Surface Mining Operation - IntroductionBy C. B. Manula
This paper presents the results of an application of the PSU/USBM Open Pit Materials Handling Simulator (1) to a large stripping mine in the Southwestern Coalfield. The specific objective of the study
Jan 1, 1979
-
Evidence of Reduced Water Infiltration by Microhardpans û Electrical Resistivity Measurements at Pe±a de Hierro, Rio Tinto, SpainBy M Furche, U Noell, C Grissemann, J A. Meima, T Graupner, A Romero-Baena
The mining residues at the abandoned copper mine site Pe±a de Hierro, located at the headwaters of the Rio Tinto, contribute substantially to the pollution of the river with high loads of Fe, As, Pb,
Jan 1, 2008
-
Geotechnical Considerations for Underground Mining of the Dy Deposit, Faro, YukonBy Nick D. Rose
The Dy deposit is a 21 Mt Pb-Zn-Ag-Au SEDEX-type massive sulphide resource located in the Anvil District, Faro, Yukon. This relatively unexplored orebody lies at a depth of 480 to 920m below surface,
May 1, 2002
-
The Implementation of Selective Mining Practices at Hadleigh Castle Mine, Charters TowersBy I P. Hodkinson
SMC Resources Limited is implementing a selective mining approach at the Hadleigh Castle mine, formerly operated by Aurora Gold Limited. The main ore zone has a length of 250 metres and dips at 40 - 4
Jan 1, 1998
-
Supergene Enrichment of the Khanong Copper Resource, Sepon Project, Lao PDRThe Khanong supergene-enriched copper resource, (~23 Mt at 3.0 per cent Cu), is one of several resources recently discovered in the intrusive-centred, sediment-hosted Au-Cu Sepon mineral field located
Jan 1, 1999
-
OFR-160-81 Evaluation Of Coal-Mine Electrical-System SafetyBy Lloyd A. Morley
This final report concludes the documentation under Grant G0155003 and details research not covered under foregoing report volumes. The first chapter lists all other reports. The following chapters ar
Jan 1, 1981
-
Computer-Aided Design & High-Precision Systems in Drilling & BlastingBy William Wilkinson, Vladisla Kecojevic
Current three-dimensional (3D) computer design technology leveraged into drill and blast planning and operations is changing the way engineers and operations approach drill and blast design. Additiona
Jan 1, 2004
-
Sidewall Design For Improved Lining Life In A PGM Smelting FurnaceBy I. McDougall
The matte/slag tidal zone in a nickel-copper-iron-sulphide matte smelting furnace is subject to severe process conditions that can lead to premature failure of the lining. The MgO-FeO-SiO2 slag is agg
Aug 1, 2013
-
Notices Transportation and the EnvironmentNotices TRANSPORTATION AND THE ENVIRO NMENT The 5th Quinquennial Convention of the S.A. Institution of Civil Engineers will take place at the Carlton Centre, Johannesburg, from 20th to 24th August, 19
-
The safety imperative?transforming the workplace to protect peopleBy G. Winkel
Safety conditions in industry have greatly improved over time. However, around the world, in Canada, and in each province or territory, people are still the victims of serious industrial accidents. Th
Sep 1, 2004
-
Study on A New Electrolysis Technology of Preparing High NB Bearing Tial Alloy From Metal OxidesBy Fanke Meng
Electrolyzing oxides of titanium, aluminum and niobium could prepare high-Nb bearing TiAl alloy (Ti-45Al-9Nb) at 1500°C. The chosen electrolysis voltage is 3.5V, which is lower than reducing voltage (
Jan 1, 2009
-
Coal - Petrography for Coal Mining and Coal Preparation. Part IIBy J. W. Leomrd, B. A. Donahue
Results of research are presented examining the extent to which the analytical characteristics of the relatively distinct coal bands from a variety of coal seams can be related to each other. This pap
Jan 1, 1968
-
Factors Influencing Base Metal Recovery From Waste Reverberatory Furnace Slags In A50 KVA Laboratory DC Plasma Arc FurnaceBy W. Banda
Paper written on project work carried out in partial fulfilment of Phd. (Process Engineering) degree* The recovery of cobalt and copper from waste slag was studied in a plasma DC-arc furnace in red
Jan 1, 2004