Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Material Instability Hazards In Mine Processing OperationsBy John W. Fredland
Many accidents occur in the mining industry as a result of the instability of material during handling and processing operations. Accidents due to dump point instability at stockpiles, and at spoil or
Jan 1, 1993
-
Surface Fracture Development From Mine Subsidence In Eastern KentuckyBy Clyde DeRossett
Surface fractures, sometimes of significant size, are observed in eastern Kentucky over high extraction areas. Field observations were correlated with mine maps and a regional subsidence prediction co
Jan 1, 1993
-
Field Experience Of Measuring The Acoustic Energy From A Hammer Blow To Coal Mine Roof And Its Relationship To Roof StabilityBy Peter Altounyan
The rate of decay of the energy from a hammer blow to a coal mine roof is related to the size and nature of the contacts between the rock being struck and its surroundings The use of this principle as
Jan 1, 2000
-
Monitoring Mobile Roof SupportsBy Kenneth E. Hay
Researchers from the U.S. Bureau of Mines conducted a field study to assess the safety of remotely controlled mobile roof supports (MRS) in a retreat pillar mining operation, Data were collected to pr
Jan 1, 1995
-
A Study On Stress Distribution And Reasonable Size Of Coal Pillar In A Coal FaceBy H. C. Li
Mechanical models are established in accordance with the degree of mining on both sides of the coal pillar, and formulae were derived which calculated the superposition stress distribution and the wid
Jan 1, 1992
-
Factors Influencing the Occurrence of Coal Pillar Bumps at the 9-Right Section of the Olga MineBy David C. Oyler
The Bureau of Mines conducted research at the 9-Right Section of the Olga Mine to determine the cause of bumps and aid in the development of appropriate control techniques. The purpose of this paper i
Jan 1, 1987
-
The Extraction of Main Heading Pillars with a Longwall at Nre Wongawilli CollieryBy Ry Stone
To maintain longwall continuity, NRE Wongawilli Colliery extracted the approximately 20-year-old Thompson Mains and in doing so, 20 roadways were holed into during longwall retreat. The orientation of
Jan 1, 2012
-
Control of Hard-to-Collapse Massive Roofs in Longwall Faces Using a Hydraulic Fracturing TechniqueBy Hideki Shimando
Periodic weighting and windblast which are caused by the dynamic effects of overburden in a longwall panel significantly affect longwall mining This study describes past experience with wind blast
Jan 1, 1998
-
Comparative Studies In The Mechanics Of Grouted Roof BoltsBy Stephen P. Signer
To improve the understanding of the support interaction mechanics between grouted bolts and coal mine roofs and to help lay the foundations for improved design and evaluation techniques, the 0.8. Bure
Jan 1, 1988
-
Mitigating Longwall Subsidence Effects on a Large Industrial BuildingBy Yi Luo
The efforts to mitigate longwall subsidence influences on various residential and farming structures by many coal mining companies have been successful in the recent years (Luo, et al, 2003). The succ
Jan 1, 2005
-
An Analysis Of Longwall Shield Cycle Effectiveness By Polycorder MonitoringBy Greg Hendon
Various methods have been used to evaluate the effectiveness of shields in place. The most common method used is static recording of leg pressures by visually examining pressure gauges. In an effort t
Jan 1, 1990
-
Aspects of Chain Pillar Design in Relation to Longwall MiningBy B Whittaker
The paper examines the role of chain pillars in longwall mining layouts as used in several countries. The application of chain pillars in relation to their expected design role is discussed. An import
Jan 1, 1987
-
Coal Combustion Byproducts-Based Artificial Mine Supports - Recent DevelopmentsBy Y. P. Chugh
The use of wooden supports, supplementary to the primary method of roof control using roof bolts in mines, consumes over 3 million cubic meters of hardwood in the U.S. annually. These supports arc pri
Jan 1, 2004
-
An Application Of Fem Back Analysis Method To Mine RoadwayKnowledge of initial ground pressures or in-situ stresses and mechanical properties and geological conditions is of great importance in drivage and maintenance of a mine roadway. Field measurements
Jan 1, 1990
-
Comparison Of Empirical, Analytical, And Numerical Methods Of Pillar Design And The Development Of A Site Specific Pillar FormulaBy Vincent A. Scovazzo
Many accepted and useful methods have been developed and used for pillar design. Each method has its own particular strengths and weaknesses. Three methods addressed in this paper are; empirical, anal
Jan 1, 1995
-
Application Of A Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model For Subsidence PredictionBy Witold M. Pytel
A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the thi
Jan 1, 1992
-
Assessing Coal Bumps From Excess Energy in Finite Difference ModelsBy Ryan Garvey
A numerical investigation is made into unstable failures of coal pillars (i.e. coal bumps) using the finite difference software FLAC3D. A static energy balance is first derived to calculate the excess
Jan 1, 2013
-
Requirements and Performance of Pumpable Cribs in Longwall Tailgate Entries and BleedersBy Peter Zhang
Pumpable cribs are being increasingly used in longwall tailgate entries and bleeders for roof support under abutment pressure. Their high peak capacity and confinement-controlled yield characteristics
Jan 1, 2012
-
Improved Intersection Design And Monitoring In The Sydney CoalfieldBy G. R. Corbett
The introduction of roof bolts to Phalen Colliery in the Sydney Coalfield, Nova Scotia (annual output of 2Mt) has been successfully implemented in maingate and tailgate entries over the last four year
Jan 1, 1995
-
Pillar Optimization For Initial Design And Retreat RecoveryBy Charles Steed
The design of pillars in room and pillar operations is always a compromise between factor of safety and ore recovery. In actively mined and accessed areas the stability of pillars must be sufficient t
Jan 1, 2003