Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Linear Programming Approach To Mine Scheduling Optimization - IntroductionBy Mark Gershon
This paper describes a linear programming (LP) application that schedules mining operations in an optimal manner. The model is developed such that it can be applied to a broad spectrum of mining activ
Jan 1, 1982
-
Limestone-Nature's Gift To The EnvironmentBy F. A. Renninger
Limestone and dolomite are the most common rock types mined and quarried as industrial minerals in the United States. In 1993 over 720 million tons of limestone and dolomite valued at over 3.1 billion
Jan 1, 1995
-
The Design And Operation Of Industrial Sulfide Mineralsize Reduction Circuits From The Viewpoint Of Maximizing Downstream Froth Flotation ProcessesBy Richard R. Klimpel
This paper discusses some important industrial interactions between size reduction and downstream froth flotation processes. Experience gained at the industrial level is clearly indicating that how si
Jan 1, 1995
-
Extraction of copper from chalcopyrite concentrates without sulfuric acid generation via chlorination - Part 2: Selective oxidation of chlorinated productsBy T. Tamagawa, I. Iwasaki, N. X. Fu, M. Kobayashi
A low-temperature-chlorination selective oxidation followed by aqueous chloride leaching and SX-EW for producing electrolytic copper, elemental sulfur and ferric oxide was investigated for hydrometall
Jan 1, 2000
-
Jet Grouting In Combination With NATMBy J. Koinig, K. Mussger, St. Reischl
Jet grouting is a viable supplementary measure for NATM tunneling in special softground conditions. In particular it is used as a type of forepoling to maintain face stability and to provide initial s
Jan 1, 1987
-
Design Of Mount Baker Ridge Freeway Tunnel In SeattleBy E. B. Johnson, G. Kjerbol, L. J. Holloway
The Mount Baker Ridge Tunnel is a major improvement of Interstate Route 90 in the State of Washington. The total length of planned underground construction is about 3,400 feet (1,040 m) of which 1,332
Jan 1, 1983
-
The Geosat Program: Geological Remote Sensing From SpaceBy Frederick B. Henderson
On 10 August 1976, The Geosat Committee was organized in Denver to institute The Geosat Program. This program is an industry backed effort to evaluate and help select optimum space remote sensing syst
Jan 1, 1976
-
Particle Size Control In A Wet Grinding CircuitBy S. K. Kawatra
For efficient control of particle size in a wet grinding circuit, three alternative methods for monitoring pro- duct particle size are available. These methods are based on: 1. Ultrasonic wave abso
Jan 1, 1979
-
Self-Propelled Abrasive Jet Reamer/Miner For Deviated Boreholes In Hard RockBy John H. Archibald, Arthur L. Miller, George A. Savanick
As part of its continuing research on selective mining, the Bureau of Mines has made progress toward developing a tool capable of remotely extracting hard minerals through a borehole. As the successor
Jan 1, 1991
-
Tunnel Design Aspects for the New Haven Downtown Storm Sewer Infrastructure Improvement Project - RETC2021By Michael Schultz, Gregory Sanders
The City of New Haven is proposing to construct Downtown Storm Sewer Infrastructure Improvement project to mitigate on-going stormwater flooding in the Long Wharf District. The proposed project includ
Jun 13, 2021
-
Optimization of Fire Design for FRC Tunnel Segments - NAT2024By Nader Shahcheraghi, Verya Nasri, Mehdi Bakhshi, Ali Haghighat
An accidental fire load is one of the major loads considered in design of segmental linings in transit tunnel. Typically, a two-dimensional coupled thermo-mechanical finite element analysis (FEA) is c
Jun 23, 2024
-
Tunneling Under Pleasure Bay with an Open-Face TBM - RETC 2021By Joshua Farmer, Mike Gianforte, Tao Jiang, William Gettings
The Two Rivers Water Reclamation Authority (TRWRA) in Monmouth County, New Jersey, is replacing its aging Pleasure Bay Interceptor (PBI) with a new 54-in interceptor in a 3,250-foot long 8 to 10-foot
Jun 13, 2021
-
Surface mine reserve definition and the high-grading fallacy (Technical Note)Introduction Surface mining is a business, and the objective of most businesses is to make as much money as possible within certain responsible constraints. Businesses normally measure their potent
Jan 1, 2000
-
A Comparison Of The Methodologies Of Intake Measurement And Bioassay For Assessing Exposure To Personnel In Uranium Milling OperationsBy A. H. Leuschner, P. J. Kruger, J. Kruger
INTRODUCTION This paper deals with some practical aspects of the use and interpretation of dosimetric methods for assessing the exposure of workers to natural uranium. Consideration must be given n
Jan 1, 1981
-
High-Efficiency Assessment and Valuation of Underground Mining MethodsBy Thomas Oberndorfer
INTRODUCTION Since several years the author is engaged in research activities in the field of mining method modelling (Oberndorfer, 1993 and 1994). The initial goal was to improve and assist the s
Jan 1, 1996
-
Shaft And Tunnel Lining Techniques Used At The Rocky Mountain Pumped Storage ProjectBy W. D. Presley, T. R. Harrell
This paper will be a case history of the shaft and tunnel concrete lining techniques used at the Rocky Mountain Pumped Storage Project located in northwest Georgia. Emphasis will be placed on the shaf
Jan 1, 1985
-
Process Choices For Carbon TechnologyBy R M. Whyte, D McArthur, A Macintosh
In designing a gold extraction circuit utilising carbonin-pulp (CIP) technology a number of process options can be considered. These include various combinations of leach or pre-leach, CIP or carbon-
Jan 1, 2000
-
Anticipated Ground Conditions for the Riverside Badlands TunnelBy D. B. Desai, J. T. Waggoner, J. S. Hill, R. R. Redd, S. J. Klein
The 13 km (8 mile) long Riverside Badlands Tunnel is planned for construction starting in 1998. Extensive geotechnical investigations indicate that the 3.7 m (12 ft) finished diameter tunnel will be
Jan 1, 1997
-
IS PYRRHOTITE (FES1 +x) REALLY A CYANICIDE IN CARBON-IN-PULP/LEACH CIRCUITS?By H. G. Linge
Pyrrhotite (FeS1+x ,0<x<0.15) is an iron sulfide which is considered to be a pest in carbon-in-pulp/ leach (CIP/L) gold processing [l].The perceived influence of pyrrhotite on gold processing by CIP/L
Jan 1, 1995
-
The Nature and Stability of Precipitated Solids From Arsenopyrite Bio-Oxidation EffluentsBy A. N. Islam, C. Simons, M. N. Hughes, J. Barrett
The effluent from the bio-oxidation of arsenopyrite contains high concentrations of iron(III) and arsenic(V), the pH being in the range 1.0-1.3. The use of lime to increase the pH causes the precipita
Jan 1, 1991