Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Construction Management And Team Effort Soft Ground Tunnel Project, Alexandria, Egypt

    By Chaitanya "Teny" Mittal

    INTRODUCTION A team effort by the Owner, Engineer, and Contractor can help avoid serious problems on a construction project. It can save cost and time for both Owner and Contractor, as illustrated

    Jan 1, 1989

  • SME
    Subsidence of bedrock above abandoned coal mines in Illinois produces few fractures

    By R. A. Bauer

    Investigations of bedrock within subsided areas over abandoned coal mines in Illinois reveal very little disturbance of the bedrock. In areas that have surface subsidence of 0.3 to 1 m (1 to 3.25 ft),

    Jan 1, 1987

  • SME
    What Is Dry and Does Your Tunnel Need to Be? - NAT2022

    By Adam Bedell, Brad Crenshaw

    Tunnel project contract documents often present groundwater infiltration requirements for components of the underground portions of the project. All too often these documents require quantifiable targ

    Dec 1, 2022

  • SME
    Quantifying the Texture of Coal Images with Different Lithotypes through Gray-Level Co-Occurrence Matrix - SME Annual Meeting 2024

    By Yuting Xue, Taghi Sherizadeh, Mark Van Dyke, Dogukan Guner, Khaled Mohamed

    The Coal Pillar Rib Rating (CPRR) technique has been developed to assist in rib support design in underground coal mines. One major challenge of the data collection process is the measurement of coal

    Feb 1, 2024

  • SME
    Designing And Modeling Wireless Mesh Communications In Underground Coal Mines

    By K. R. Griffin

    New and developing communication systems enable underground miners to not only connect to the surface from an increased communication coverage area but also to be discovered in the event of an emergen

    Jan 1, 2010

  • SME
    Opportunities And Advantages Of 3d Geologic Modelling For Tailings Storage Facilities - SME Annual Meeting 2023

    By H. D. Lelono, M. Walden, G. Johnson

    3D modelling can be used throughout the mine lifecycle and has proven to be a powerful tool for consultants and mining companies. One of the most significant benefits of 3D models is their ability to

    Feb 1, 2023

  • SME
    Markets For Southern Powder River Basin Coal (52e91515-cf94-4a48-b1d9-bcd7d99bfef0)

    By Patti J. Best

    The Southern Powder River Basin (SPRB) now commands 30% of the US utility, coal market due to the region's low mine production costs, competitive rail rates and low sulfur content. In 1997, produ

    Jan 1, 1998

  • SME
    Scrubbing Of Western Phosphate Ore ? Introduction

    By K. W. Vincent

    This paper, deals with the beneficiation of a low grade Western phosphate to ore. More specifically it summarizes the results of a study made to optimize a scrubbing step in the process, and to provid

    Jan 1, 1965

  • SME
    Multielement Extraction System For Determining 19 Trace Elements In Gold Exploration Samples

    By John G. Viets, J. Robert Clark

    A multielement extraction system is being used successfully to provide essentially interference-free geochemical analyses to aid in gold exploration. The Methyl isobutyl ketone-Amine synerGistic Iodid

    Jan 1, 1990

  • SME
    La Simulacion Digital: Una Valiosa Ayuda Para El Diseño De Plantas De Proceso

    By A. L. Mular

    Si define la simulación digital y las técnicas de simulación son revisadas. La metodologia tipica conlleva la selección de modelos, el ajuste o reajuste de los datos primarios, la selección de una est

    Jan 1, 1982

  • SME
    State-of-the-Art Transfer Chute Design Using 30 Parametric Modelling

    By C. W. Benjamin

    The paper covers the development of an efficient, "state-of-the-art" design approach encapsulating extensive research and development by Gulf on soft loading, low impact, zero spillage transfer chutes

    Jan 1, 2000

  • SME
    The Critical Pillar Concept In Yield Pillar-Based Longwall Gate Road Design

    By J. R. Koehler

    Yield pillar-based gate road designs oftentimes fail to provide mine operators with adequate ground control because of the unknowing misemployment of "critically" sized pillars. A "critical" pillar is

    Jan 1, 1995

  • SME
    Horizontal stress and longwall headgate ground control (f04c9550-0a29-4e7e-9795-c59d77d72a59)

    By D. Dolinar, T. P. Mucho

    Horizontal stresses are caused by global platetectonic forces. During 1995 alone they were largely responsible for the closing of two longwall mines in the United States. This paper presents six case

    Jan 1, 1999

  • SME
    Grass Roots Kaolin Plants -- Can They Be Justified? ? Introduction

    By T. M. Sukel

    Engelhard Corporation is one of the leading producers of kaolin based products in the world, having acquired the assets of Freeport Kaolin company in 1985. Much of the production technology used in th

    Jan 1, 1987

  • SME
    Development and Scale-Up of Large Flotation Cells (49397335-092e-4959-bee9-d97a26f115c9)

    By Nathaniel Arbiter

    The increasing size of flotation cells as the use of flotation has increased is traced from the first United States application of the process in Montana in 1911 through the following eight decades, u

    Jan 1, 1999

  • SME
    New BESA Insoluble Anode for Electrolysis in Aqueous Solutions

    By J. E. Hoffman, Massimo Maccagni, T. J. Keefe, Marco Olper, O&apos

    The problem relating to the use of insoluble anodes in acidic and highly aggressive environments has still not been definitely solved, and it is therefore a recurring subject of discussion. The fie

    Jan 1, 1993

  • SME
    Mine Accident Liabilities -- Planning For Prevention

    By T. M. Biddle

    If an accident occurs at a mine, the mining company, its parent and affiliates, and its supervisory employees may face substantial -- and sometimes unexpected -- liabilities and costs. This presentati

    Jan 1, 1986

  • SME
    Tunnels And Shafts - Des Plaines System

    By Thomas F. Martin, Daniel J. Sieve

    In April 1988, the joint venture of Morrison-Knudsen and Paschen Contractors (M-K/P) was the successful low bidder for the Metropolitan Water Reclamation District of Greater Chicago's (MWRD) Cont

    Jan 1, 1991

  • SME
    An Electrokinetic Study On The Amine Flotation Of Oxidized Coal

    By W. W. Wen

    The objective of this investigation was to study the electrokinetic behavior of oxidized coals to indicate the feasibility of separating oxidized coals from ash materials and pyrite by an mine flotati

    Jan 1, 1976

  • SME
    Reduction Of Environmental Noise Levels At The Meadow River No. 1 Preparation Plant

    By David G. Chedgy

    The Meadow River No. 1 Preparation Plant, owned by Sewell Coal Company, a subsidiary of the Pittston Company, was commissioned in the spring of 1974. The plant is designed to process 400 TPH of 5" x 0

    Jan 1, 1976