An Assessment Of Engineering Noise Controls At A Talc Processing PlantBy E. R. Spencer
National Institute for Occupational Safety and Health (NIOSH) researchers conducted an investigation to quantify sound levels and to determine the amount of sound reduction provided by engineering noi
Jan 1, 2008
-
Narrow vein shrinkage stope ventilation measurement using tracer gas and numerical simulationBy G. Arpa
Ventilation survey using tracer gas measurement is one of the techniques for mine ventilation design, monitoring and investigation of movement of fresh air and contaminants. However, there has been li
Jan 1, 2009
-
Tunneling In Residual Soil And RockBy Lee W. Abramson, Kenneth P. Akins
The authors have accumulated published data on residual soil and rock tunnels in the United States and have compared it to transit tunneling experience in Atlanta, Georgia, and tunnels in other soil a
Jan 1, 1983
-
Silicate Coating Technology to Prevent Acid Mine DrainageBy Kostas Fytas, Pierre Bousquet, Bill Evanelou
Acid mine drainage (AMD) is a serious environmental problem that preoccupies the Canadian Mining Industry. Considerable amounts of money are spent every year in an effort to prevent or reduce the acid
Jan 1, 2000
-
New Rakeless Thickener Technology In Mineral ServiceBy D. Bedell, J. Robitalle, D. Macgilliveray
Agnico Eagle (Cadillac Quebec, Canada) selected the new Eimco PEC E – CAT™ clarifier thickeners for their counter-current decantation circuit, which handles approximately 200tph leached gold/silver or
Jan 1, 2002
-
Geolocation for Underground Coal Mining Applications: Classi?cation of SystemsThe ability to track miners and communicate with them while they work in underground coal mines is important during normal daily operation, and critical in emergency conditions. This was evident durin
-
Uncertainty Based Push-Back Design Algorithm In Open Pit MiningBy J. Gholamnejad
In open pit mine planning and design, push back mine sequencing is widely used for long-term production planning. In push back design, a series of nested pits is generated and then considered as possi
Jan 1, 2007
-
Climax High Capacity Processor – A Novel Design for Coal Pre-Combustion Cleaning – Preprint 97-74By J. V. Ghelarducci, M. A. Sharpe, D. G. Chedgy
This article presents a novel design, called the Climax, High Capacity Processor (HCP), for pre-combustion cleaning of coal. This design is particularly suitable for the plant capacities of 400 ~ 660
Feb 24, 1997
-
Adding A Third Main Fan At The Waste Isolation Pilot Plant (SME Annual Meeting March 1-3, 1999, Denver, Colorado)By K. H. McDaniel, L. Griswold
The Waste Isolation Pilot Plant (WIPP) is adding a third fan to operate in parallel with, and supplement, its two existing main fans. An engineering analysis conducted in 1995 identified the need for
Jan 1, 1999
-
Development and integration of ventilation simulation tools for colliery ventilation practiceEffective tools are not only essential for the design of practical and efficient underground mine ventilation systems but must also play an integral part in the operation of the mine. One such tool is
Jan 1, 2009
-
Prediction Versus Actual Response of Rocks in an Excavation of Underground Cavern at the Lam Ta Khong Pumped Storage ProjectBy Pratoomkhuan N. Lertsgoon
A large underground cavern with dimensions of 25m × 175m × 49m (W×L×H) was excavated in sandstone and siltstone to house 4 units of hydropower generator and was completed in 2000. In feasibility study
Jan 1, 2003
-
Long-Range Planning Commission: Report of the Scope CommitteeBy Charles C. Dahl, Gordon C. Presley, Andrew E. Nevin, Bruce A. Kennedy
How does SME-AIME cope with profound changes in technology, markets - and most importantly - in employment patterns facing its membership today? This is the question that prompted the Society's B
Jan 4, 1984
-
Groundwater Inflow into Hard Rock Tunnels: A New Look at Inflow EquationsBy John H. Raymer
Groundwater inflow into hard rock tunnels is strongly affected by recharge and drawdown of the water table. Previous analytical and empirical methods for estimating inflow have generally not accounted
Jan 1, 2005
-
Design of Rock Shafts Adjacent to Heavily Loaded ColumnsBy Nikolas K. Sokol
Underground construction often requires working within a very congested urban environment, including excavating shafts adjacent to highly sensitive and multistoried structures, sometimes even within s
Jan 1, 2008
-
Evaluating The Use Of Booster Fans In Two Underground Coal Mines (dad85aba-30c3-4dbb-bffb-81f370700600)By J. M. Wempen
As development in underground coal mines progresses away from the critical components of the ventilation system, including the main fans and ventilation shafts, resistance is markedly increased. This
Jan 1, 2011
-
Selection Of A Novel Mine Tracer Gas For Assessment Of Ventilation Systems In Underground MinesBy S. Underwood
The tracer gas method of conducting ventilation surveys is a means of determining air quantity in underground mines with knowledge of the concentration of the tracer in the atmosphere and the flow rat
Jan 1, 2012
-
Chemical Stabilization Of Fine Coal Waste As An Alternative To Slurry ImpoundmentsBy Z. Duan
A novel concept involving the deployment of chemical stabilization has the potential to eliminate the need of slurry impoundments and significantly reduce the release of trace elements from the high s
Jan 1, 2012
-
Industrial Minerals 2004 - PerliteBy K. N. Santini, J. M. Barker
The perlite industry in the United States continued to undergo rapid change and increased competition last year as it did in 2002. U.S. production in 2004 was 510 kt (562,000 st),an increase followin
Jan 1, 2005
-
Verification and calibration of ventilation network modelsBy F. F. von Glehn
There is no doubt that simulated ventilation networks must be adequately verified before they can be extrapolated and used for predictive purposes. There are two general approaches as to how the verif
Jan 1, 2009
-
The Fallacy of Tunnel Formwork RemovalBy Wern-ping (Nick) Chen
In concrete lined tunnels, formwork removal timing may be controversial. Contractors seek to strip the form as soon as possible, and designers seek to keep the formwork in place as long as practical t
Jan 1, 2008