Tunnel Lining for Drill and Blast TunnelsBy Björn Johansson
"SUMMARY Every tunnel designer has to consider the power of water ingress when designing a new tunnel. Either you choose solutions with simple methods to divert the ingress water or a robust system wi
Jan 1, 2016
-
Streamlining Open-Pit Operations With Automated Equipment MonitoringBy M. Baumann
Operating and maintaining the heavy equipment used in open-pit mining operations is an ongoing challenge for mines. Typical operations employ a combination of shovels, wheel loaders, and haul trucks t
Feb 23, 2014
-
Reconciling Mine Plans with Mine Operations at Freeport-Mcmoran SierritaBy R. E. Vivas, J. Garcia
"INTRODUCTION Freeport-McMoRan is a leading international natural resources company that operates large, long-lived, geographically diverse assets with significant proven and probable reserves of copp
Jan 1, 2015
-
A risk-management approach to improve coal-pillar extraction - SME Transactions 2012By C. J. Bise, P. Bucks
Central Appalachian coal reserves are a valuable natural resource in high demand, both domestically and internationally, justifying efforts to increase percentage recovery through pillaring. Unfortuna
Jan 1, 2012
-
Innovative Support of Cross-Passage Openings in Segmented LinerBy Karel Rössler, Petr Vítek
"The Ejpovice tunnels in Czech Republic were built by EPBM in soft Clyashale, and in weathered profile with low soil overburden. The segmented liner at the cross-passage openings required support, whi
Jan 1, 2016
-
A New Era of Tunneling Planned for Houston—Going Deep to Solve Regional Water Supply, Wastewater, and Drainage Problems - RETC2021By Eric Hansen, Todd Wanless, Chris Mueller, Shannon Dunne, Scott Elmer
Between 2010 and 2018, Houston added more than 1 Million residents; the third largest rate of growth in the nation. With growth, the region faces new challenges with water supply, capacity of its wast
Jun 13, 2021
-
Artifact Reduced Localization of Uncertainty – Lipstick on a PigBy J. Boisvert, E. Daniels, C. Deutsch
"INTRODUCTION Conventional mine planning is performed on a single resource model at a selective mining unit (SMU) scale deemed appropriate for the deposit and mining method. Estimation methods such as
Jan 1, 2015
-
Steepening of Inter-Ramp Slopes on a Final Wall at the Goldstrike Open PitBy J. Mattern
Performance monitoring, operational practices and ongoing collection of geologic data in open pit slopes all provide valuable information for quantifying potential steepening of subsequent slopes. Min
Jan 1, 2019
-
Graphical Simulation of Continuous Miner Production SystemsBy S. C. Suboleski, R. Zhao
A Simulation/Animation Model (SAM) with several unique features has been developed for continuous mining in room-and-pillar production systems. Initial cut data are generated by the program based on a
Jan 1, 1993
-
Historic Rock Tunnel Rehabilitation—Designing for the Unknown - NAT2022By Ryan Marsters, Adam Pring, Robin Dornfest
Raw water supply in the central Rocky Mountains often relies on trans-basin conveyance. Many of these older diversions incorporate high-elevation, miles-long tunnels driven over a century ago in hard
Dec 1, 2022
-
Upgrading the Coal Creek Trunk Sewer - RETC2021By Joseph Clare
It’s not the 1960s anymore. Upgrading wastewater pipelines in the current era demands the latest trenchless technology to minimize impacts. King County Wastewater Treatment Division in Seattle, Washin
Jun 13, 2021
-
Remote Control And Monitoring Of Ventilation At The Henderson MineBy Bradley V. Nelson
A number of improvements in the ventilation system at the Henderson Mine have been made during the past several years. A key to these improvements was the installation of a computerized monitoring and
Jan 1, 1995
-
Mining in the Future: Academic Mining 2050By M. Javier
"Mining makes civilization possible. It also creates socio-economic problems surrounded by sustainability controversies yet continues extraction without considering the balance and finitude of nature.
Jan 1, 2018
-
An Integrated Approach To Production And Cost ManagementBy R. L. Grayson
An integrated approach to mine management is presented. A model for achieving the level of control of operations critical to surviving in the current market is outlined. The integrated Production and
Jan 1, 1988
-
The Pulp Rheology Of Some Australian Gold OresBy Janine L. Beazley, James H. Kyle
The effects of pH, pH modifier (lime or caustic soda) and cyanide on the pulp rheology of a number of ore types ranging from highly siliceous to highly kaolinitic has been investigated. All experiment
Jan 1, 1989
-
Material Parameters and Who’s Influence on the Behavior in Backfilled MassesBy F. Schreiter
"One method to increase the exploitation rate of a mine is the use of backfill with residual materials in exploited areas. The backfilled material is meant to support both, the walls of galleries and
Jan 1, 2015
-
Structural Impacts to Tunnels Due to FloodingBy Raymond Sandiford, Taehyun Moon
"In 2012, Superstorm Sandy (Sandy) caused extensive flooding in many of the tunnels in New York City. The inundation resulted in two distinct stress changes to the tunnel structures. The first stress
Jan 1, 2016
-
Selection Criteria for Mixing Systems for Tailings, Paste-Back Fill & ConditioningBy S. Bentley
"Everyone has a general idea what mixing means, but describing the mixing process is not so simple. The objective of any mixing process is to distribute and blend the materials with different characte
Jan 1, 2015
-
“They Want to Dig a 100-Foot Hole in Front of My House for Two Years!” - Community Mitigation and Outreach for DC Water’s First Street TunnelBy Carlton M. Ray, William P. Levy, Thomas Lindberg
"The District of Columbia Water and Sewer Authority (DC Water) is implementing its $2.6 billion DC Clean Rivers Project to reduce combined sewer overflows to the District’s receiving waterbodies and m
Jan 1, 2016
-
Sulfide Waste Management Considerations at Homestake's Santa Fe MineBy Dale A. Shay, Roy R. Cellan
The Santa Fe Mine, located in west central Nevada, began leaching ore in 1988 and completed ore processing in 1995. Homestake Mining Company has completed final reclamation of the site, including reme
Jan 1, 2000