Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Enhancement of Profitability of Central African Copperbelt Operations using Direct Cobalt Electrowinning ProcessBy N. Mulaudzi, S. Archer
"Direct cobalt electrowinning was developed to produce unrefined cobalt metal as an alternative to producing a mixed hydroxide product (MHP), which is the common cobalt intermediate product in African
Jan 1, 2015
-
Operating Variables Affecting The Bubble Size In Forced-Air Mechanical Flotation Machines (4b87d53e-0784-4e21-944e-900bb650e46b)By J. E. Nesset
The bubble size, together with the gas rate, determines the bubble surface area flux in flotation machines and, therefore, impacts directly on the kinetics of flotation. Understanding the variables th
Jan 1, 2007
-
Air Quality Management In The North West Province Of South Africa ? A Successful Partnership With IndustryBy W. Bryszewski
As a result of strategic analysis in respect of the needs for air quality management a new advanced and holistic approach to air quality management process was introduced in the North West Province (N
Jan 1, 2004
-
A Lining Management System For Submerged Arc FurnacesBy Wayne Burmeister, Danie Benade, Louis Meyer, Hugo Joubert
What is not measured cannot be managed. This is true of most things, including a furnace lining. This paper describes a Lining Management System used for this purpose. It provides the operations st
Jan 1, 2007
-
Strengthening Of A Cold Worked 17% Cr Ferritic Stainless Steel (Type 430) By Heat TreatmentBy M. Sephton
Slat-band chains, currently manufactured from Type 430 ferritic stainless steel, are used as conveyors in various industries. A process to strengthen these chains?with the aim of prolonging the lifeti
Jan 1, 1997
-
The business benefits of an advanced mineral sands control applicationBy R. Hope, C. van Heerden
In any process or organization inefficiencies are costly. In times of abundance this reality often does not receive much attention. During such times the focus is rather on increasing capacity to incr
Jan 1, 2003
-
A Comparison Of The Kinetics Of The CO-CO2 Reaction With Steelmaking And Copper Making SlagsBy E. Chen, M. Barati, K. Coley
The reaction between carbon and slags is of significant importance in direct smelting of iron ores, EAF slag foaming and copper slag cleaning processes. This reaction is known to occur via gaseous int
Jan 1, 2004
-
Integrated Optimization Of Underground Mine Design And SchedulingBy J. Little
It is common practice for underground mine plans to be created sequentially, where results from one planning process form the input data for another. While this is practical for manual methods, comput
Oct 1, 2013
-
Modelling Of Antimonate Capacity In Copper And Nickel Smelting SlagsBy J. M. Font, R. G. Reddy
Jan 1, 2004
-
Towards best practice for routine seismic hazard assessment in minesBy G. van Aswegen
Seismic monitoring became commonplace in the deep South African gold mines in the early 1990’s. The discipline has, to a large extent, developed beyond the ‘research’ stage, and a ‘Guide to Seismic Mo
Jan 1, 2003
-
Size Dependent Gold Deportment In The Products Of Copper Flotation And Methods To Increase Gold RecoveryPlant survey data has shown that gold recovery through a specific copper concentrator was significantly lower than copper recovery. Size-by-size analysis revealed that this was due to poor recovery of
Jan 1, 2003
-
Some Advances in Lognormal TheoryBy H. S. Sichel
This study deals with the development of some new theory concerning the bias which will result from the employment of the t-estimator if in fact the underlying distribution of ore values is not lognor
Jan 1, 1987
-
Early detection of mining truck failure by modelling its operation with neural networks classification algorithmsBy H. Hu, T. S. Golosinski
The paper reports on use of neural network algorithms to model performance and condition of mining trucks. The model inputs are selected digital data streams collected by truck Vital Information Manag
Jan 1, 2003
-
The Use Of Performance Monitoring Techniques In Detecting Process Shifts And Potential Root Causes In A Variable Speed Grinding ApplicationBy T. Khumalo, L. P. Coetzer
This paper addresses the impact of the variable speed drive on the particle size distribution in the product of a fully autogenous UG2 grinding circuit. It further discusses the impact of a varying pa
Jan 1, 2006
-
Processing Of Konkola Copper Concentrates And Chingola Refractory Ore In A Fully Integrated Hydrometallurgical Pilot Plant CircuitBy R. M. Whyte
The Konkola Deep Mining Project (KDMP) seeks to exploit the deep level potential of the Konkola Deeps orebody, producing high grade copper concentrates for treatment at the Nkana Smelter and Refinery.
Jan 1, 2001
-
A cleaner production assessment of the ultra-fine coal waste generated in South Africa - SynopsisBy J. F. Reddick
The South African coal mining industry is currently disposing of about 10 million tons of ultra-fine coal (<150 µm) per year. Once discarded, these sulphur-containing ultra-fines contribute to several
Jan 1, 2007
-
A Long Hole Stoping System For Mining Narrow Platinum Reefs - IntroductionBy P. van Dorssen
In South African metalliferous mines, stoping operations are largely confined to narrow, tabular orebodies making mechanization extremely difficult. Limited flexibility in terms of stope width has nec
Jan 1, 2002
-
Just-In-Time Development Model For A Sub-Level Caving Underground Mine In ZimbabweBy C. Musingwini
Traditionally, mineral reserves management at most underground mines in Zimbabwe focus on maintaining large mineral reserves so that the time between development and production is as long as possible.
Jan 1, 2003
-
An Investigation Into The Moisture Absorption Properties Of Thermally Dried South African Fine CoalThe aim of this research was to study the absorption characteristics of thermally dried fine coal from South African collieries. After milling to ?150 µm and pressure filtration, the samples were subj
Jan 1, 2002
-
Evaluation Of Three Rock Breaker Layouts For Mechanized Block Cave MiningBy J. B. Oosthuizen
Mechanical rock breakers are used in block caving operations to reduce the size of ore fragments which are too large to pass through grizzlys at the load-haul-dumper tipping points. Several layouts of
Jan 1, 1997