    Full-Face Blast Rounds in Shaft Sinking with Electronic Delay Detonators - a Critical Appraisal

    By B Mohanty

    Full-face blasting rounds have been used to excavate a 4.6-mdiameter shaft at Atomic Energy of Canada Limited's Underground Research Laboratory near Pinawa, Manitoba. Both standard pyrotechnic delay d

    Jan 1, 1990

  • ISEE
    Underwater Plug Blast at Manic-C Hydro-Electric Project

    By P Albert

    A wedge-shaped underwater rock plug has to be blasted in order to tap the reservoir and furnish water to a new underground powerhouse at Manicouagan-5. The paper deals with the design and engineering

    Jan 1, 1984

  • ISEE
    Reducing Eyebrow Break Caused by Rock Blasting in Malmberget Mine (86e4ad65-d689-43b3-b42e-a83837151808)

    By Z X. Zhang

    In sublevel caving mines, eyebrow break usually gives rise to lower ore recovery and worse safety in the field. Eyebrow break is caused mainly by two tensile stress waves: one from the front surface o

    Jan 1, 2011

  • ISEE
    Fingerprint Verification For Control Of Electronic Blast Initiation

    By Ron Stewart, Richard Youmaran, Andy Adler

    In the current context of heightened concerns with explosives security, there is significant interest in technological controls to improve security. It is important to be able to control what is fired

    Jan 1, 2007

  • ISEE
    Blasting a Diversion Tunnel through the Abutment of a "Meta-Stable" Dam

    By Jennifer Williams, Donald J. Berger

    Originally built between 1913 and 1916, the Ashton Dam & Hydroelectric Facility has experienced various seepage and piping incidents since completion. Ashton Dam is located within 15 miles (24 km) of

    Jan 1, 2014

  • ISEE
    Deep Water Blasting on the River Nile in Southern Egypt

    By Rob Grant, Manuel Lopez Cano, Mike Briggs, Ken Fletcher

    The scorched desert sands and life giving waters of the River Nile in Egypt have been the back drop to awe inspiring engineering feats for over 4,700 years. The latest engineering marvel to grace the

    Jan 1, 2004

  • ISEE
    Journal: You Be the Judge - A Study on Ethics

    The following situation was submitted as an ethics case study for inclusion in the Journal. To the best of our knowledge, they are based on actual circumstances encountered in the field. Blowing the W

    Jan 1, 2007

  • ISEE
    2000 Blasting in the New Millennium - Timely Claims Reporting Can Make A Big Difference

    By Steve Dillingham

    A blast site incident has just occurred. Tensions are high, and, as the blaster, you’re in charge of the crisis at hand. Your mind is reeling, your thoughts frantic. The main areas of concern for you

    Jan 1, 2002

  • ISEE
    Case Study Using 3-D Blast Modeling to Develop Design for Blasting in Close Proximity to Pit Pump

    By Stuart Brashear, Steven Bell, Donald Smith

    This Limestone site required the removal of a bench containing high quality rock located in close proximity to sump and pit pump. The sump and associated electrical box were below the bench that neede

    Jan 21, 2025

  • ISEE
    Design of a Passive Underwater Pressure Gauge

    By S. Lim, G. Walsh, V. Romero

    The cable television show, Mythbusters, contacted the New Mexico Institute of Mining and Technology requesting a pressure gauge to be used in underwater testing. The requirements for the gauge were: i

    Jan 1, 2009

  • ISEE
    Pitfalls of Residential Blasting—Experiences of a Field Blaster

    By Chuck Kliche, Bill Clements

    This paper relates some of the experiences, good and bad, of blasting adjacent to residences of the primary author during his 15+ years of field blasting in the Northern Great Plains region. During th

    Jan 1, 2009

  • ISEE
    Potential Limits for Regulation of Environmental Effects of Blasting

    By Gerald R. Coonan

    Early in the open session of the 1979 SEE Fifth Conference panel discussion, someone asked a question of the panel concerning the future intent of the Office of Surface Mining and the regulatory limit

    Jan 1, 1979

  • ISEE
    Estimating Underground Mine Damage Produced by Blasting

    By Thomas E. Ricketts

    An important part of underground mine planning and operations involves the reclamation of working areas after blasting before the mining cycle can continue. This is especially true for mining that mus

    Jan 1, 1988

  • ISEE
    "More than Track and Trace – New Advantages of Track and Trace Software for CivilExplosives"

    By Frank Hirthammer

    "Nowadays, security in the lifecycle of explosives is more important than ever. Terror attacks all over theworld pushed the EU to decree a Commission Directive for the identification and traceability

    Jan 1, 2017

  • ISEE
    An Innovative Approach to Blasting a Marine Plug in Winter

    By Andre Pinsonnault, Francois Lefebvre, Yves Newman

    In 1989, Les Entreprises Kiewit Ltee signed a C$32 million contract with the Societe d'energie de la Baie James, on behalf of HydroQuebec, to excavate the intake and tailrace channels for a second pow

    Jan 1, 1991

  • ISEE
    Improving Blast Preformance with High Density Toe Loads

    By John Floyd, Larry Wardrip

    A series of tests were conducted to evaluate the performance of a high density, high velocity cartridged explosive. The tests included two production blasts in a limestone quarry and two production bl

    Jan 1, 2002

  • ISEE
    Update on Blasting Near a Crusher

    By Scott G. Giltner, Alex Schwenk

    This paper is an update on a paper presented at the 2022 ISEE conference. The original paper presented how the mine operator desired to open up ore reserves near several mine structures including two

    Jan 21, 2025

  • ISEE
    The Evaluation of Electronic Detonators at Martha Mine, New Zealand

    By Blair Jackson, Tjaart Louw

    Martha Mine, owned by Newmont Mining, Australia appointed Macmahon Contractors (NZ) Ltd as the mining contractor to drill, blast, and crush and convey ore for processing, followed by construction of a

    Jan 1, 2003

  • ISEE
    Underground Remote Firing System

    By Tom Paynter

    In an underground mining environment, the primary method of firing a blast is using a combination of an electric detonator and a detonating cord to initiate the Nonelectric detonators. This method has

    Jan 1, 2017

  • ISEE
    Coal Recovery Improvement Using Stratablast™ at the Colowyo Coal Company

    By Gary Anderson, J. P. Remi Proulx

    Rio Tinto’s Colowyo Coal Mine produces 2.1 million tons per year in northwest Colorado. Colowyo uses the terrace mining method to recover up to seven coal seams ranging in thickness from 5 to 20 feet.