Murphy's Law And The Pile Prediction Event At The 2002 ASCE GeoInstitute's Deep Foundations ConferenceBy Bengt H. Fetlenius
The "Pile Prediction Event" at the ASCE GeoInstitute's Deep Foundation Conference in February 2002 involved prediction of drivability and capacity of three 14m long, 324mm diameter, closed-toe pi
Jan 1, 2004
-
Boston Waterfront Redevelopment: Re-use Of Existing Pier Piles To House Future GenerationsBy John P. Briand III, Douglas J. Aghjayan, Robert E. Fosse
This paper highlights the successful pile load testing program for the redevelopment of Pier One in East Boston, Massachusetts. Pier One is a 5.4-acre parcel on a dormant waterfront site used in the 1
-
TBM Recovery Shaft Construction - SR-99 TunnelBy Lance Rasband, Richard Hanke, John Starcevich
"The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure
Jan 1, 2016
-
Dynamic Load Testing of Drilled Deep FoundationsBy Paikowsky, Samuel G.
"Due to the way drilled deep foundations are being constructed, their structural integrity and geotechnical capacity are highly variable. Drop weight systems are increasingly being used to dynamically
Jan 1, 2015
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KYBy Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Guide to Drafting a Specification for High Capacity Drilled and Grouted Micropiles for Structural SupportBy Donald Bruce
The three types of specifications which are used for micropile work are: ? Performance Specifications: The contractor is permitted control over certain design and/or construction procedures but must
Jan 1, 2004
-
Guide to Drafting a Specification for Micropiles (XXII International Mineral Processing Congress)By Joint Micropiles Committee
"The three types of specifications which are used for micropile work are: • Performance Specifications: The contractor is permitted control over certain design and/or construction procedures but must
Jan 1, 2004
-
Soil Improvement Through Rammed Aggregate Piers To Mitigate Liquefaction Risk In Storage TanksBy Francisco A. Flores, José L. Aguirre, Héctor A. de la Fuente, Erika Bernal, Jorge Arroyo-Esquedla
This paper presents the analysis, design, and construction of soil improvement for storage tanks foundation support at a site in Tabasco, Mexico. A total of 980 Rammed Aggregate Piers of 12.5 m in len
Oct 1, 2022
-
Adjacent Top-Loaded Bi-Directional Test And Conventional Bidirectional Load Test Results – Site IiBy Patrick J. Hannigan, Seth Robertson, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (―TLBT‖) and the conventional Bi-Directional Load Test (―BDLT‖) are full-scale static load test methods. In both methods, the test loads are applied bi-directionally
Oct 1, 2022
-
-
Deep Dry Soil Mixing Performance and Quality Control Acceptance CriteriaBy Patrick K. Wong, Richard Kelly
"The variability in strength and compressibility of in situ deep soil mixing products can be greater than the variability of the natural soil. However, satisfactory performance can be achieved by care
Jan 1, 2015
-
The Coupled Thermo-Hydro-Mechanical Numerical Analysis for the Estimation of Active Zone and Free-Field Heave in Expansive Natural Clay and BedrockBy Rendon Rieth, John Bryant, Kourosh Tamizdoust, Amr Helal
Expansive soils are widespread in the Southern, Western, and Rocky Mountain areas of the United States. Expansive natural clays and bedrock can expand upon wetting and shrink upon drying. These soils
Oct 31, 2023
-
Drilled-In Displacement Piles: Lessons Learned from Case History at JFK Airport in New YorkBy Joe Smith, Roberto Rodriguez, Francisco Ciruela-Ochoa
Drilled-In Displacement Piles (DDPs) present some advantages over other deep foundation solutions making them suitable for challenging conditions encountered at John F. Kennedy (JFK) International Air
Oct 31, 2023
-
Bay Park Conveyance Project: SOE for 14 Shafts on a Microtunnel AlignmentBy Renee Fippin
Several projects are underway in Nassau County, New York, to improve water quality in the Western Bays of Long Island. A major piece in accomplishing this is the Bay Park Conveyance Project. When com
Feb 1, 2024
-
Liquefaction Susceptibility Evaluation using Site-Specific Seismic Demands in the San Jose AreaBy Martin Walker, Joseph Ang, Jongwon Lee, Alvin Bayudanto, Lilian Lorincz, Morteza Khorshidi, Wenyong Rong
This paper presents a case history of liquefaction susceptibility evaluation study for a major infrastructure project in the San José area. The subsurface material of the study area consists of Holoce
Sep 8, 2021
-
Measurements of CDSM Strengths and Seepage Data Following Seismic Upgrades of San Pablo DamBy Atta B. Yiadom, A. David Miller, Robert C. Kirby, Sean M. Todaro
"San Pablo Dam is a 170-foot (52-meter)-high earthfill embankment, located approximately 10 miles (16 kilometers) north of downtown Oakland, California, that impounds a 38,600 acre-feet (47.6 million
Jan 1, 2015
-
Working Platform Design Aspects Considering Soft Ground and Edge StabilityBy Andrew Lees, Chris Iereidis, Mark Wayne
The design of working platforms typically involves the calculation of a two-layer bearing capacity to ensure that tracked piling plant can operate with an adequate safety margin against rig toppling d
Oct 7, 2024
-
Information Technology And Monitoring - Technologies De L'Information Et Monitoring - Innovations In Diaphragm-Wall Construction PlantBy Maurice Guillaud
The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th
Jan 1, 2002
-
Comparison of LRFD Resistance Factors to Tension Pile Load TestsBy Seth H. Hamblin, John E. Regan, Dimitrios Palantzas
"Through reliability-based calibration of larger pile load test databases, recent developments of the Load Resistance Factor Design (LRFD) methods, which include geotechnical load and resistance facto
Jan 1, 2015
-
Influence of Pile Geometry on the Dynamic Response of an Under-Reamed PileBy M Muzammil, S. Mukerjee, S. Saran, M. Bharathi
"This paper presents the results of in-situ tests conducted on a set of under-reamed piles in a silty sand deposit. Three piles (i.e. vertical, vertical with one bulb and vertical with two bulbs) of d