An Innovative Approach To Load Testing Of High Capacity PilesBy P. Bermingham
A new approach to load testing of high capacity piles is presented. The method is mobile, inexpensive, repeatable and non-destructive allowing for multiple pile testing at a single site. A reaction ma
Jan 1, 1989
-
Drilled Shaft Side Shear Capacity In Compressible Materials What Influences Capacity?By J. A. Hayes
For over a decade the Osterberg Load Cell has been successfully used to determine the shear capacities of drilled shafts. Since the test method measures side shear directly, analytical complications d
Jan 1, 2003
-
Rigid Inclusions For Soil Improvement In A 76 Building ComplexBy Walter I. Paniagua
A housing complex of 76 buildings is being constructed in the city of Morelia, in western central Mexico; the buildings are 5 levels high, with a shallow concrete slab foundation. Soil conditions incl
Jan 1, 2008
-
Machine Foundation RepairBy Scott D. Thomson
The client for this project specializes in the use of state-of-the-art technology to fabricate and assemble composites and metal-bonded structures for commercial and military aircraft programs. One of
Jan 1, 2003
-
Drilled Pile Design and Installation Challenges in an Urban EnvironmentBy Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran
This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment
Jan 1, 2018
-
Behavior Of Step Tapered Bored Piles In Sand Under Axial LoadingBy Nabil F. Ismael
The axial capacity of step tapered bored piles in sand was examined by field tests at one site in Kuwait. Two straight piles, and two step tapered piles were load tested in compression to failure. Al
Jan 1, 2008
-
Rapid Vibratory Pile Driving Hammer For Deep FoundationBy Li Tiemin
It is one of important tasks in research of vibratory pile driving to increase speed of pile driving and depth of pile driving -- this means to increase capability of penetrating hard layer. In genera
Jan 1, 1991
-
Predication Of Heave For Deep Excavation With Irregular Plane ShapeBy Zhang Jiaju
For the highrise buildings with deep foundstion of irregular plane shape, an appropriate calculate model to the heave of foundation soil after excavation is proposed and studied using analytic method
Jan 1, 1991
-
Use Of And Design Parameters For High Capacity Foundation Elements In Boston Bedrock - IntroductionBy Mark X. Haley
Foundation design and construction in Boston has changed dramatically during the past 10 years. Prior to 1985, the primary foundation element in Boston, where deep foundations are required, was driven
Jan 1, 1994
-
Deep Diaphragm Wall Activities At Randstadrail Project In Rotterdam, The NetherlandsBy Klaus Pöllath
The Netherlands RandstadRail project makes use of a large range of sophisticated geotechnical techniques to allow a shield driven tunnel to approach the central station of Rotterdam. This paper descri
Jan 1, 2006
-
Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract ManagementBy Mario Aiezza
This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto
Jan 1, 2002
-
Ultimate Uplift Capacity Of Piles And Pile Groups In Granular SoilBy B. M. Das
Laboratory model test results for the ultimate uplift capacity of rough rigid single and group piles embedded in sand have been presented. Model tests on single piles were conducted in loose, medium,
Jan 1, 1989
-
Enhancements To The FHWA Deep Foundation Load Test DatabaseBy Carl D. Ealy
Work is being done to web enable the FHWA Deep foundation Load Test Database. Originally designed to function in the client server environment via modem, access to the database both for data maintenan
Jan 1, 2002
-
Installation Of Augered Cast-In-Place Piles - Equipment (1ca07ced-58e8-4100-8369-c2eebb984ebc)? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2000
-
Comparison of Static Lateral Behavior of Vertical and Battered Pile Groups of the I-10 Twin Span Bridge Using Finite Element SimulationBy Ahmad F. Souri, Murad Abu-Farsakh
"In this study, the static lateral resistance of vertical and battered pile groups was analyzed using 3D finite element analysis. The battered pile group finite element model was verified using the re
Jan 1, 2017
-
A Review Of Diaphragm Wall Construction-White Swan Hotel ? SynopsisBy Q. M. Huang
In 1979 our company undertook the project of infra-structural work of White Swan Lake Hotel, (International class ) Guangzhou. Visit to the site showed that it was situated at the riverside, covering
Jan 1, 2010
-
Pile Top Hydraulic Hammer Drive Down The Hole Chiselling Round Steel Piling System - SummaryBy J. Nakayama
For installation of round steel piles or cast-in-place pile construction through boulder contained ground or rocky formation, usual system does not function properly or impossible to work. This paper
Jan 1, 1999
-
Mathematical Background For The Design Of Rotating Machinery Foundations With Deep Piles ? SummaryBy Marius B. Wechsler
There are considered deep piles which are fixed in blocks of rotating machinery foundations. A mathematical background is developed for determining the behavior of this kind of piles for motions cause
Jan 1, 1987
-
Design Of Drilled Pier In Expansive SoilsBy G. T. Hong
A numerical model for use in design is developed to predict the stresses and axial and bending displacements in a drilled pier in expansive soils. The prediction is based on the horizontal swelling p
Jan 1, 2007
-
Foundation Design And Construction In Variable RockBy Joel Moskowitz
A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140 m by 100 m, will include 4 basements under the entire footprint. The perimeter was to be
Jan 1, 2002