Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Reliability Of Conventional Design Methods For Driven Piles In Sand - SynopsisBy Kenneth Gavin
The accurate prediction of the shaft capacity of drives piles in sand continues to present problems for foundation designers. Research in this field has been carried out for many years and has yielded
Jan 1, 1996
-
Design and Construction of the Thames Water Lee Tunnel Shafts, LondonBy Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley
"AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor
Jan 1, 2014
-
Seismic Considerations for Bridge FoundationsBy Lok M. Sharma
"Construction of a new bridge in a seismically sensitive area requires careful assessment of earthquake impact on the serviceability of the facility. Not only is the superstructure vulnerable, the fou
Jan 1, 2017
-
Ground Vibrations from Pile and Sheet Pile Driving Part 2 — Review of Vibration StandardsBy K. Rainer Massarsch, Bengt H. Fellenius
"Abstract Vibration limits for buildings with respect to ground vibrations from pile driving published in international standards are reviewed. At first, relevant vibration parameters are defined and
Jan 1, 2014
-
Proof of Bearing Capacity of Anchors on the Example of Innovative Anchor Monitoring SystemBy Stephan Großwig, Karolina Nycz, Arne Kindler
"Commonly used anchor monitoring systems are mainly based on the use of anchor force meters. However, experience shows that the reliability of the display of force meters lowers over time. Other measu
Jan 1, 2017
-
Ground Improvement for the Distressed Earth Bund Using Stone Column - A Case StudyBy M. Kumaran, A. Vetriselvan, A. Purantharan
"This paper presents a case history of evaluating the stability of a distressed earth bund and rectification measures carried out. A 5.45 km long, 7m high earth bund for drinking water storage was con
Jan 1, 2017
-
Rapid Lateral Load Testing Of Deep FoundationsBy Dan A. Brown
This paper describes a method of conducting rapid lateral loading tests of deep foundations in which the load is applied to the foundation with a time duration of less than one second. For purposes of
Jan 1, 2007
-
Roger Bullivant Cone PileBy R. A. Bullivant
Roger Bullivant Piling Limited has started 1992 with the introduction of the CONE PILE into its range of precast concrete foundation techniques. Since the establishment of its Piling Division ten
Jan 1, 1992
-
Minipiles And Postgrouted Bored Piles - Two Techniques For Special Site Conditions - Summary:By Stefan K. Schwank
The paper describes the two foundation techniques - mini piles and postgrouted bored piles. The mini pile system is presented with its design and installation parameters, especially the drilling techn
Jan 1, 1991
-
Non-Destructive Testing Of Drilled Shafts and CFA Piles – Current Practice and New MethodBy George Piscsalko
"Quality control of drilled shafts and CFA piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult or not possible to fully inspect the shaft prior to
Jan 1, 2014
-
Railroad Bridge Approach Embankment Settlement MitigationBy Moi Arzamendi, Jose Ramirez, Kenneth Kniss, Sunil Arora, James Gingery
Construction of a new approach embankment for a railroad bridge over a river in Southern California required placing up to 12 ft of fill over soft to medium stiff silts and clays along an approximate
Jan 1, 2018
-
Underpinning Support Pipeline Compressor Station Founded On Timber Piles Potter, Ontario - DFI Conference, Toronto, Oct 1997 - Underpinning Support - Pipeline Compressor Station - BackgroundBy Brian Isherwood
TransCanada Pipelines, Calgary (TCPL) is one of North America's leading transporters of natural gas through its energy transmission business. TransCanada also operates significant complementary b
Jan 1, 1997
-
Testing And Evaluation Of Driven Plate Piles In A Full Size Test Slope: A New Method For Stabilizing Shallow Landslides ? IntroductionBy Richard Short
Shallow rainfall-induced landslides in residual and colluvial hillslopes and steep embankments are a common occurrence in many settings [1, 2, 3]. While occasionally posing a threat to property and l
Jan 1, 2007
-
Helical Piles With Grouted Shafts - A Practical OverviewBy Gary L. Seider
Helical screw piles are used in various applications including the underpinning of distressed foundations and as deep foundations for new structures. At present, maximum design loads range between 12.
Jan 1, 2003
-
Ground Support for Shafts and Underground Construction Using Artificial Ground Freezing – Sophia Spoortunnel Rotterdam (Nl) – Cern Geneva (CH) – Leipzig (DE) – Berlin (DE)By Helmut Hass, Marco Ziller
"Abstract: 1 Sophia Spoortunnel Marco Ziller, Trevi S.p.A.:For the construction of 14 cross passages connecting the twin tunnels of the Sophiaspoortunnel the Artificial Ground Freezing technique was a
Jan 1, 2014
-
Minipiles In Soft Marine Deposits Rescue Sinking WarehouseBy Bruno Gemmi
A new warehouse built with prefabricated components over an area underlined by soft marine soil deposits started showing differential settlements well before its completion. Its 103 spread footings c
Jan 1, 2011
-
Research on the Stability Analysis of TDM Column Composite Foundation Supported EmbankmentBy Song-yu Liu, Chao Yan, Yong-feng Deng
"In order to investigate the stability of embankment on soft subgrade improved by T-shaped deep mixed column composite foundation, the internal forces and failure modes of columns were analyzed on the
Jan 1, 2015
-
Analyses On Laterally Loaded Cast-In-Place Concrete Piles ? SynopsisBy Makoto Kimura
Failure tests on laterally loaded single and pile group are analyzed with a 3-dimensional elasto-plastic finite element program. In the analysis, the mechanical behavior of the ground is supposed to b
Jan 1, 1996
-
Compensation Grouting Under Real-Time Monitoring, Rio Piedras Project, San Juan, Puerto Rico - Deep Foundations Institute 25th Annual Meeting And 8th International Conference New York USA, October 5-7, 2000By Jean-Pierre Hamelin
Ground movements induced by underground excavation are always of critical concern, particularly in urban areas. Compensation grouting now appears as a safe means to control these movements. The paper
Jan 1, 2000
-
Two Miles of Anchored Bulkhead Supports Howard Frankland Bridge MegaprojectBy Casey D. Shanahan, Dustin Walkenhorst
The Howard Frankland Bridge megaproject consists of a new, 3.2-mile (5.1 km) bridge extending I-275 across Tampa Bay. Two steel sheet pile and combi-wall bulkheads with a total wall length of over 11,
Oct 31, 2023