Pin Piles For Seismic Rehabilitation Of BridgesSince the 1989 Loma Prieta Earthquake in the San Francisco Bay Area, the California Department of Transportation (CALTRANS) has accelerated seismic upgrading of their bridges. Many structures can be i
Jan 1, 1993
-
OPA Contender Features Innovative ACIP Pile TestBy Andres M. Baquerizo, Matthew E. Meyer, Carlos Ortiz
"The Metropolitan Miami development, a downtown mixed-use complex developed by Miami-based MDM Development Group, has weathered the economic downturn by adapting to the needs and pressures of the loca
Jan 1, 2012
-
Helical Pile Foundation Anchors As A Practical AlternativeBy Dilip Khatri
Helical pile anchors have gained acceptance over the past sixty years. Most recently they have been commonplace in the 20th century for the power utility industry in anchoring transmission towers, equ
Jan 1, 2003
-
Effect Of Pressurized Drilling Methods On The Lateral Load Capacity Of Drilled Shafts - A Practical Insight And An Analytical ApproachBy Özgür Bezgin
This paper presents observations on the installation of drilled shafts from two construction projects and an academic study with experimental and analytical parts. The construction projects involved t
Jan 1, 2009
-
Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge ConsortiumBy Jacob Chacko
The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten
Jan 1, 2011
-
Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - SynopsisBy Robert Jakiel
The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange
Jan 1, 2000
-
Advantages of Pressed-In Sheet Piles for New Orleans’ Hurricane and Storm Damage Risk Reduction System Flood Control ProjectBy Ian Vaz, Takefumi Takuma
"The New Orleans area has been repeatedly flooded by major storms and hurricanes since its French colonial era. After severe flooding in May 1995, the U.S. Congress authorized a massive flood protecti
Jan 1, 2017
-
Pile Load Testing At JFK International Airport - SynopsisBy J. Moskowitz
Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k
Jan 1, 2000
-
Deep Foundation Solutions And Implementation For Pittsburgh International Airport Midfield Terminal ? 1.0 IntroductionBy Peter Florian
At 5:50 am on October 1, 1992, the new $800 million Pittsburgh International Airport Midfield Terminal opened its gates to the world after five years of construction and more than 24 years of planning
Jan 1, 1993
-
Revitalizing Hillside Using Stabilization Piers Monitored By 3-D Mems-Based InclinometersBy Peter Chou
A total of 117 slope stabilization drilled piers were installed as part of a major hillside revitalization project. The 110-million dollar development, known as Stratford at Kenwood, included an 18-st
Jan 1, 2009
-
Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, LaBy Antal Partos
ATLAS Processing Company Shrevesport, LA initiated a major plant expansion in 1980. SITE Engineers, Inc. provided engineering consultation regarding the foundation of the vacuum unit. Four test boring
Jan 1, 1992
-
Installation And Performance Characteristics Of High Capacity Helical Piles In Cohesive SoilsBy Mohammed Sakr
This paper presents the results of a full-scale axial compression and tension (uplift) testing program executed on large-capacity helical piles installed in very stiff to very hard clay till soils (i.
Jan 1, 2012
-
The Synergy Between Theory And Practice In Geo-EngineeringBy Bas R. Hemmen
GeoBrain is a facility at GeoDelft with the purpose to provide society with all relevant geo-engineering knowledge and experience in a structured way. On the basis of the available knowledge and exper
Jan 1, 2006
-
Use Of Non-Invasive Helical Foundations For Urban Forest Canopy Walk Way ? Atlanta Botanical GardenBy David C. Kraft
Helical piles and ground anchors were used to meet critical design and constructability requirements for an urban forest Canopy Walk at the Atlanta Botanical Garden, Atlanta, GA. The 12-foot wide ped
Jan 1, 2011
-
The Effectiveness Of The Monotube Pile Taper At The Highway 280 Pile Uplift Test Site ? IntroductionBy Samuel J. Kosa
The Monotube is a uniformly tapered high-strength steel shell pile manufactured for friction pile applications. The Monotube pile was developed in the early 1920's in Canton, Ohio. Its first comm
Jan 1, 1993
-
Drilled Piers In Coastal Plain DepositsBy J. Allan Tice
In the past fifteen to twenty years, the use of drilled piers to support high capacities in coastal plain deposits has become more and more common. With improved construction techniques and better und
Jan 1, 1988
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Program Development - Background - CollapseBy Darrell L. Beddard
The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western
Jan 1, 1996
-
Small Diameter Piling System Used In AustraliaBy P. J. Yttrup
Small diameter timber piles are used in Australia to solve foundation problems in soft or filled ground and expansive soil. The paper describes the results of pile load tests to develop simple methods
Jan 1, 1989
-
Application Study On Non-Destructive Static Test PileBy Han Xuanjiang
Through whole analysis of static testing piles information of a teaching building, this paper put for ward that when the ratioes of unload rebound amount to residual deformation and to total settlemen
Jan 1, 1991
-
Underwater Cable Anchors - Salvage Of Barge 45, Niagara River ? BackgroundBy Colin C. West
On August 7, 1986, Barge 45, while being towed near the mouth of the Niagara River, was swept downstream and pinned against one of the central piers of the Peace Bridge. The barge rested against the p
Jan 1, 1987