Session 19 "Compensation Grouting"By Douglas Heenan
The fracture orientations were inferred based on theory and previous experience. The fracture pattern was not monitored during the project. Grout volume was recorded at each sleeve port and real time
Feb 10, 2003
-
A Fully Connected Jobsite is a Must for the FutureBy Christian Hoyme, Jochen Maurer
Most of the current foundation projects are suffering from disconnected information silos. In the first silo there is the planning of the project with corresponding data, presented by paper or digital
Jan 1, 2019
-
Seismic Rehabilitation Of Seattle's Pier 69By David Pierce
The Port of Seattle, one of the largest on the west coast of North America, made a strong statement regarding their support for reusing existing structures when a decision was made to rehabilitate Pie
Jan 1, 1992
-
Integration Of Real Time Pile Design By Means Of Building Information ModelingBy Prof. Dr. -Ing. habil. Sascha Henke, Johannes Beck
The growth of Building Information Modeling (BIM) during recent years opens possibilities for integrating new digitally driven design approaches. While parametric design and algorithmic design slowly
May 1, 2022
-
Design Practice Of Circular Diaphragm Wall Structure With Large Diameter ? SynopsisBy X. Y. Hou
The design practice of several circular underground projects with large diameter is summarized. By taking the advantages of load-bearing of circular structure, a rational annular tensile bar support s
Jan 1, 2010
-
Pile Construction And Related Problems ? SynopsisBy K. Fujita
In order to deal properly with the fundamental aspects of pile construction, the following problems and their solutions are introduced: For driven piles - stresses, damage, movements of surroundings,
Jan 1, 2010
-
Base Grouted Piles In Thanet Sands, LondonBy D. E. Sherwood
Twelve toe grouted, and eleven ungrouted piles, founded in very dense sands have been analysed to establish how toe grouting enhances pile performance. It is shown that pile stiffness is greatly incre
Jan 1, 1989
-
Design, Construction And Applications Of Auger Piling System For Earth Retention And Underpinning Of StructuresBy A. A. Gupte
Auger piling system which was developed in the United States in the 1940's is gaining acceptance in many parts of the world. Although primarily used to support foundations, the system is very use
Jan 1, 1989
-
Ground Improvement By Means Of Stabilising ColumnsBy Georg Breitsprecher
The technique of Stabilising Columns (product names are for example "Stabilisierungssaulen" (STS) or "Coplan Stabilisierungs-verfahren" (CSV)) is gradually becoming well accepted for ground improvemen
Jan 1, 2006
-
Viscoelastic Finite Element Analysis Of Diaphragm Walls ? SynopsisBy M. Y. Xia
In this paper, based on the Theological tests of the interface between clay and concrete, an interface Theological model is proposed and is used in the finite element analysis which takes soil as visc
Jan 1, 2010
-
Design Criteria Of Dynamic Consolidation ? SynopsisBy Z. Q. Wang
The author is trying to clarify the existing problems in designing and laying out dynamic consolidation for soft ground improvement. Field testings and observations including vibrational parameters, p
Jan 1, 2010
-
Session 20 "Grouting for Water Retaining Embankments"By Timothy Flaherty
We observed the boiling in the water very close to the water adjacent to where we were drilling. That only happened at the very beginning before it was switched to water flushing. Yes, it was performe
Feb 10, 2003
-
Methodology for Drilling Offshore or Onshore in Hard Rock for Deep Foundations with Pile Top Drill Rigs (PBA)By Dinesh Hinduja, Pérez: Miguel
"Large structures are generally exposed to dynamic and structural loading. They require usually either foundation connected to hard rock through sockets or driven foundations, which encounter boulders
Jan 1, 2015
-
A New Low-Cost Bi-Directional Load Test Technique for Drilled ShaftsBy Sherif Elfass, Gary Norris
Bi-directional load testing of drilled shafts has been widely adopted as a means to evaluate their load carrying capacity. However, in order to reach failure, most of these tests are carried out on s
Sep 8, 2021
-
Design Equations For Laterally Loaded Piles Embedded In SandBy T. G. Davies
The paper presents design equations for singly laterally loaded piles embedded in sand. These equations were obtained from a comprehensive nonlinear analysis of free and fixed head piles subjected to
Jan 1, 2010
-
Rock Socket Friction In Drilled Shafts - Its Greater Than You Think - Summary.By Jorj O. Osterberg
The practice of using side shear resistance in the design of drilled shafts socketed in rock is discussed. In the absence of field test data for the particular rock involved, the designer often neglec
Jan 1, 1991
-
Behaviour Of Laterally-Loaded Piles Centrifugal And Numerical Modelling ? SynopsisBy W. H. Craig
Techniques have been developed for installing model piles into beds of soil under high sustained acceleration levels aboard a centrifuge. These piles have been subjected to static and/or cyclic latera
Jan 1, 2010
-
A Study Of Failure Mechanism And Uplifting Capacity Of Tension Pile Foundation ? SynopsisBy K. J. Yang
Based on investigations and model tests combined with pile foundation on Code compilation of drydocks, we present this report to give informations against uplift pressure of piles beneath floor of dry
Jan 1, 2010
-
Behavior Of Piled Raft Foundation Systems Under A Combined Set Of LoadingsBy Renato P. Cunha
The paper explores a parametric analysis of a four-pile group in contact (hence piled raft) and without contact (hence standard pile group) with the superficial soil layer, under a combined set of loa
Jan 1, 2006
-
Leveraging The CM/GC Project Delivery Approach for Remote High Elevation Dam Rehabilitation Projects In ColoradoBy Mark Brooks, Brian Freeland, Eric Eisinger
Colorado Parks and Wildlife (CPW) operates more dam and reservoir facilities in the State of Colorado than any other single entity and is in the process of completing rehabilitation upgrades to improv