Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Session 19 "Compensation Grouting"

    By Douglas Heenan

    The fracture orientations were inferred based on theory and previous experience. The fracture pattern was not monitored during the project. Grout volume was recorded at each sleeve port and real time

    Feb 10, 2003

  • DFI
    A Fully Connected Jobsite is a Must for the Future

    By Christian Hoyme, Jochen Maurer

    Most of the current foundation projects are suffering from disconnected information silos. In the first silo there is the planning of the project with corresponding data, presented by paper or digital

    Jan 1, 2019

  • DFI
    Seismic Rehabilitation Of Seattle's Pier 69

    By David Pierce

    The Port of Seattle, one of the largest on the west coast of North America, made a strong statement regarding their support for reusing existing structures when a decision was made to rehabilitate Pie

    Jan 1, 1992

  • DFI
    Integration Of Real Time Pile Design By Means Of Building Information Modeling

    By Prof. Dr. -Ing. habil. Sascha Henke, Johannes Beck

    The growth of Building Information Modeling (BIM) during recent years opens possibilities for integrating new digitally driven design approaches. While parametric design and algorithmic design slowly

    May 1, 2022

  • DFI
    Design Practice Of Circular Diaphragm Wall Structure With Large Diameter ? Synopsis

    By X. Y. Hou

    The design practice of several circular underground projects with large diameter is summarized. By taking the advantages of load-bearing of circular structure, a rational annular tensile bar support s

    Jan 1, 2010

  • DFI
    Pile Construction And Related Problems ? Synopsis

    By K. Fujita

    In order to deal properly with the fundamental aspects of pile construction, the following problems and their solutions are introduced: For driven piles - stresses, damage, movements of surroundings,

    Jan 1, 2010

  • DFI
    Base Grouted Piles In Thanet Sands, London

    By D. E. Sherwood

    Twelve toe grouted, and eleven ungrouted piles, founded in very dense sands have been analysed to establish how toe grouting enhances pile performance. It is shown that pile stiffness is greatly incre

    Jan 1, 1989

  • DFI
    Design, Construction And Applications Of Auger Piling System For Earth Retention And Underpinning Of Structures

    By A. A. Gupte

    Auger piling system which was developed in the United States in the 1940's is gaining acceptance in many parts of the world. Although primarily used to support foundations, the system is very use

    Jan 1, 1989

  • DFI
    Ground Improvement By Means Of Stabilising Columns

    By Georg Breitsprecher

    The technique of Stabilising Columns (product names are for example "Stabilisierungssaulen" (STS) or "Coplan Stabilisierungs-verfahren" (CSV)) is gradually becoming well accepted for ground improvemen

    Jan 1, 2006

  • DFI
    Viscoelastic Finite Element Analysis Of Diaphragm Walls ? Synopsis

    By M. Y. Xia

    In this paper, based on the Theological tests of the interface between clay and concrete, an interface Theological model is proposed and is used in the finite element analysis which takes soil as visc

    Jan 1, 2010

  • DFI
    Design Criteria Of Dynamic Consolidation ? Synopsis

    By Z. Q. Wang

    The author is trying to clarify the existing problems in designing and laying out dynamic consolidation for soft ground improvement. Field testings and observations including vibrational parameters, p

    Jan 1, 2010

  • DFI
    Session 20 "Grouting for Water Retaining Embankments"

    By Timothy Flaherty

    We observed the boiling in the water very close to the water adjacent to where we were drilling. That only happened at the very beginning before it was switched to water flushing. Yes, it was performe

    Feb 10, 2003

  • DFI
    Methodology for Drilling Offshore or Onshore in Hard Rock for Deep Foundations with Pile Top Drill Rigs (PBA)

    By Dinesh Hinduja, Pérez: Miguel

    "Large structures are generally exposed to dynamic and structural loading. They require usually either foundation connected to hard rock through sockets or driven foundations, which encounter boulders

    Jan 1, 2015

  • DFI
    A New Low-Cost Bi-Directional Load Test Technique for Drilled Shafts

    By Sherif Elfass, Gary Norris

    Bi-directional load testing of drilled shafts has been widely adopted as a means to evaluate their load carrying capacity. However, in order to reach failure, most of these tests are carried out on s

    Sep 8, 2021

  • DFI
    Design Equations For Laterally Loaded Piles Embedded In Sand

    By T. G. Davies

    The paper presents design equations for singly laterally loaded piles embedded in sand. These equations were obtained from a comprehensive nonlinear analysis of free and fixed head piles subjected to

    Jan 1, 2010

  • DFI
    Rock Socket Friction In Drilled Shafts - Its Greater Than You Think - Summary.

    By Jorj O. Osterberg

    The practice of using side shear resistance in the design of drilled shafts socketed in rock is discussed. In the absence of field test data for the particular rock involved, the designer often neglec

    Jan 1, 1991

  • DFI
    Behaviour Of Laterally-Loaded Piles Centrifugal And Numerical Modelling ? Synopsis

    By W. H. Craig

    Techniques have been developed for installing model piles into beds of soil under high sustained acceleration levels aboard a centrifuge. These piles have been subjected to static and/or cyclic latera

    Jan 1, 2010

  • DFI
    A Study Of Failure Mechanism And Uplifting Capacity Of Tension Pile Foundation ? Synopsis

    By K. J. Yang

    Based on investigations and model tests combined with pile foundation on Code compilation of drydocks, we present this report to give informations against uplift pressure of piles beneath floor of dry

    Jan 1, 2010

  • DFI
    Behavior Of Piled Raft Foundation Systems Under A Combined Set Of Loadings

    By Renato P. Cunha

    The paper explores a parametric analysis of a four-pile group in contact (hence piled raft) and without contact (hence standard pile group) with the superficial soil layer, under a combined set of loa

    Jan 1, 2006

  • DFI
    Leveraging The CM/GC Project Delivery Approach for Remote High Elevation Dam Rehabilitation Projects In Colorado

    By Mark Brooks, Brian Freeland, Eric Eisinger

    Colorado Parks and Wildlife (CPW) operates more dam and reservoir facilities in the State of Colorado than any other single entity and is in the process of completing rehabilitation upgrades to improv

    Oct 7, 2024