  • DFI
    Mini-Pile Design and Construction Methods Change to Mitigate Soil Loss through Glacial Till (db8ff9fc-ef1a-44d4-9e2e-ad6c00fcf7e5)

    By Cassandra A. Wetzel

    "Rock socketed mini-piles are a desirable foundation alternative when design capacity is more than 40 tons and there is limited access. In this case history mini-piles were designed to support between

    Jan 1, 2017

  • DFI
    Piling Adjacent To Rail Tunnels At King’S Cross Central

    By David A. Hart, Barry P. Osborn, Richard J. Totty, Ana T. Carvalho, Max B. Elliott

    This paper addresses the experience designing and installing bored piles for the King’s Cross area. This includes continuous flight auger and rotary bored piles, with a range of diameters between 600

    May 1, 2022

  • DFI
    Case History: Drilled Shaft Foundation System in Cemented Soils, Las Vegas, Nevada

    By Rouzbeh Afsharhasani, Moses Karakouzian, Brandon Kluzniak

    "The Vegas High Roller is the centerpiece of a new development parcel adjacent to the Las Vegas Strip. At a height of 550 feet, the High Roller is currently the tallest observation wheel in the world.

    Jan 1, 2017

  • DFI
    Interpretation Of Full Scale Horizontal Pile Loading Tests In Sand Analysis Of P-Y Curves

    By Ali Bouafia

    Five full-scale horizontal loading tests of piles carried out by the LCPC in France are interpreted in order to analyse P-Y load-transfer curves. The experimental piles are either bored or jacked into

    Jan 1, 2002

  • DFI
    A Case Study Of A Vibratory Pile Installation Monitoring Of A Precast Prestressed Concrete Pile

    By K. Viking

    It's well known that conventional impact hammers, usually are the method to use in order to drive precast prestressed concrete piles. However sometimes the vibratory technique might be considered

    Jan 1, 2004

  • DFI
    A Non-Destructive Monitoring System for QA/QC of Cement-Bentonite Cut-off Walls

    By Sathya Subramanian, Jun Yuan Ryan Lee, Angelina Yi Tian Theng, Kai En Low, Soon-Hoe Chew, Yeow Chong Tan, Kai Yang Toh, Pei Ling Goh

    Conventional Quality Assurance and Quality Control (QA/QC) methods for Cement Bentonite (CB) walls rely on destructive coring, which is carried out at specific curing times like 28 days or 91 days. Th

    Oct 7, 2024

  • DFI
    Design And Construction Constraints Imposed By Unique Geologic Conditions In New York City - Synopsis

    By George J. Tamaro

    The design and construction of foundations in the New York City area are usually dictated by the widely varying geologic conditions encountered in the five boroughs, particularly along the spine of Ma

    Jan 1, 2000

  • DFI
    Baltimore's Fort McHenry Tunnel ? Introd[u]ction

    By Axel J. Pollak

    Since the late 1960's the Interstate Division for Baltimore City (IDBC) has been planning and developing the Interstate Highway System for the city to meet regional planning goals. The principal

    Jan 1, 1989

  • DFI
    Construction Of Large Scale Diaphragm Walling And Related Problems - Part One - The Building Of Diaphragm Walling - I. The General Situation Of The Project

    By D. X. Xu

    A pump station was constructed at the food of a steep mountain, very close to a riverside. To protect the pump station from being washed out, and to guarantee the stability of the steep hillside behin

    Jan 1, 2010

  • DFI
    Top-Down Methods Utilizing Secant Walls at 110 N. Carpenter: Design And Construction

    By David R. Sutfin, Joseph Lodde

    110 N. Carpenter is new commercial building located in the West Loop neighborhood of Chicago, Illinois. The new home to the McDonalds Corporation work headquarters, accelerated project delivery method

    Jan 1, 2019

  • DFI
    High Capacity Hollow Core Bar Piles

    By Lawrence F. Johnsen, Felix Ferrer, Dino Tomasetti, Cassandra A. Wetzel

    "A 17 story building was constructed at the Brooklyn Navy Yard on a site with a long history of development. Most recently the site supported a dewatering well and craneway to service two adjacent dry

    Jan 1, 2017

  • DFI
    Earth Pressure Distribution On Diaphragm Wall During Excavation

    By Ting Chinsu

    Diaphragm wall with tie-back cable is widely used for deep excavation, especially in the area with high density of buildings. This paper presents the measured earth pressure distribution on diaphragm

    Jan 1, 1991

  • DFI
    Construction Of Cast-In-Place Piles With Enlarged Bases

    By H. Mori

    Construction of cast-in-place piles with enlarged bases has become popular in the cities in Japan facing to the sea coast, where the subground soil is soft alluvium deposited to depths often exceeding

    Jan 1, 1989

  • DFI
    S21-Berlin – Design And Underwater Construction Of A Covered Contrustion Pit Without Direct Accessibility From Above

    By Grischa Dette, Thomas Schröder, Holger Merski

    For the construction of the tunnel for the new Berlin S21 light rail line, a construction pit had to be built below the crossing B 96 federal road. For this purpose, the construction pit M’ has been b

    May 1, 2022

  • DFI
    Numerical Analysis Of The Pile-Enhanced Raft Of The Queen Elizabeth II Conference Centre In London, UK

    By Trevor I. Addenbrooke

    Stress reducing piles were used for the first time at the Queen Elizabeth II Conference Centre near the Palace of Westminster in London, UK. The inclusion of these piles directly beneath heavily loade

    Jan 1, 2002

  • DFI
    Practice Of Arranging Drilling Piles In Subsiding Grounds

    By Vladimir M. Korolev

    The field studies conducted at the experimental-production sites allowed to develop the technology of arranging drilling piles in loess subsiding grounds over 25 m deep and over 250 mm in diameter, to

    Jan 1, 2002

  • DFI
    Pile Foundation Solutions in the Deep Quaternary Sediments of Botany Bay

    By Paul A. O’Brien, Gary A. Chapman, Thomas G. Cuniowski

    "The new Amcor B9 paper mill in Botany, NSW, Australia, involved the design and construction of a new paper mill founded within the Botany Basin Sediments. There were numerous design and construction

    Jan 1, 1900

  • DFI
    Lessons Learned From Mitigating Early Project Delays To Deep Foundation Work

    By Jeffery L. Ottesen

    Early construction delays can jeopardize timely completion of subsequent work. As an early construction activity, and due to many unforeseen issues, deep foundation work inherently bears great potenti

    Jan 1, 2002

  • DFI
    Integrity Evaluation Of Driven Concrete Piles Utilizing Embedded Data Collectors

    By Donald T. Robertson

    This paper presents case histories of driven concrete pile damage detected with dynamic testing methods utilizing strain gages and accelerometers embedded in the pile at the prestressing yard during p

  • DFI
    A Study on Bearing Capacity of Waveform Micropiles Using Centrifuge Test

    By Chengcan Wang, Jin-Tae Han, Young-Eun Jang

    "The waveform micropile is a newly developed foundation type for increasing the bearing capacity with the created shear keys on the pile’s shaft. Analyzing the increment of resistance at the shear key