Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Implant Foundations – Press-in Piling Method for Urban Construction

    By Tsunenobu Nozaki

    "Basically, the “Press-in Piling Method” was invented to eliminate construction nuisances, such as noise and vibration which have been serious unsolved problems for advancing societies over a long tim

    Jan 1, 2015

  • DFI
    ACIP Pile Performance and Installation in the Northeastern United States

    By Jr NeSmith

    "Augered-cast-in-place (ACIP) pile installation technology has matured extensively since the first auger, pressure grouted pile was patented in 1959. The current technology allows for successful pile

    Jan 1, 2016

  • DFI
    Atoka Pipeline - Canadian River Crossing

    By Jewels Stover, Charles A. Luxford

    Oklahoma City is undergoing a replacement program for an existing 66in (1.675m) water pipeline that conveys raw water from Atoka Reservoir to the City. This pipeline currently crosses the Canadian Riv

    Sep 8, 2021

  • DFI
    Construction And Verification Of Large Bored Pile For Bridge Foundation Through Deep Weak Alluvial Soil Layers And Artesian Aquifer

    By C. Dai, S Raathiv

    The Waikato Expressway is one of the New Zealand Transport Agency’s (NZTA) seven roads of National Significance. Coffey is part of the City Edge Alliance engaged by NZTA for the Hamilton Section of th

    Nov 1, 2022

  • DFI
    Comparison Of Large Plate Load Test Result With Predicted Deformation In Deep Vibro Techniques Treated Ground For Iron Ore Stockpile Yard In Vietnam

    By Leong, William. Chong, Kam Weng

    Deep Vibro Techniques namely Vibro Compaction (VC) and Vibro Replacement (VR) are widely used in ground improvement to densify sands and strengthen cohesive soils. This paper describes the application

    Nov 1, 2022

  • DFI
    Case Studies Of Driven Tubular Steel Piles In Soils And Basalt On Woolgoolga To Ballina Pacific Highway Upgrade

    By Henry Zhang

    This paper presents two case studies of large diameter driven tubular steel piles for the ongoing Woolgoolga to Ballina Pacific Highway upgrade (W2B). This project forms part of Australia’s largest re

    Nov 1, 2022

  • DFI
    Deep Excavation Support: Innovative Shoring Design in an Urban Environment

    By Richard D. Luark, Fernanda S. Madrona

    Designing temporary retaining systems that allow for deeper excavation amid the existing urban infrastructure has become a challenge. A 60-foot-deep excavation in downtown Seattle was required to cons

    Jan 1, 2019

  • DFI
    University Of Minnesota Football Stadium Down Hole Pile: Innovative Solution For Difficult Conditions

    By Eric J. Pederson

    The down hole hammer is widely used in specialty geotechnical construction. The common uses include tie-back anchor installation, micropile installation, and general soil/bedrock drilling operations.

    Jan 1, 2008

  • DFI
    Rion-Antirion Bridge - An Olympian Effort Overcomes Extreme Geohazards

    By Ricardo Dobry, Alain Pecker, George E. Leventis, Ralph B. Peck

    "This year’s DFI Outstanding Project Award is for the design and construction of the foundation scheme for the largest cable-stayed bridge in the world. In 1993, Gefyra, SA (a French/Greek consortium

    Jan 1, 2007

  • DFI
    Design Of Ground Improvement By Inclined Dsm Columns For Railway Embankment (Türkiye)

    By Emre Turk, Suat Gullu, Candan Gokceoglu, Ahmet Sirri, Asli Can

    In this study, the ground improvement application applied under the live railway bridge's approach embankments in Sivas, Türkiye was investigated as a case study. The soil profile is mainly composed o

    Oct 1, 2022

  • DFI
    A Case Study Describing The Use Of A Top Down Construction Sequence For A Three Level Basement Using A Diaphragm Wall And Cfa Foundation Piles

    By Chris Leach, Lucie Spencer

    This case study describes the geotechnical aspects of the basement construction for a multi-storey, residential and hotel complex located in the newly developed Elizabeth Quay precinct in Perth, Weste

    Nov 1, 2022

  • DFI
    Design-Build Synergy To Deliver Pile Foundations

    By David P. Sauls

    Design-build contract delivery provides unique opportunities for efficiencies in pile foundation design and installation. The Louisiana Department of Transportation and Development (LADOTD) US Highwa

  • DFI
    Installation of 10 Feet Diameter CIDHs in Soft Clay Using Rotator/Oscillator on Trestle

    By Babak Mamaqani, Pirooz Barar

    The Moanalua trestle spanned over Moanalua Stream, Honolulu, HI and was designed to accommodate construction of five 10 feet diameter cast in drilled hole (CIDH) piers as a part of Honolulu Authority

    Jan 1, 2019

  • DFI
    Permanent Earth Retention for Deep Excavation Installed Within Minimal Right of Way Limits

    By Thomas D. Humbert, Christopher J. Ramsey

    Construction of a new underground parking structure in State College, Pennsylvania, is situated on a site constrained by limited ROW and required excavations ranging in depth from 25 ft to 40 ft. Addi

    Jan 1, 2019

  • DFI
    Excavation Techniques For Underground Drinking Water Pipe Line With Micro Piles As A Special Application

    By Andhra Pradesh, Nagarajkumar B. V

    As a part of Mumbai City Mega Drinking Water Project at Amar Mahal Tunnel-1 Ghatkopar East Mumbai, drinking water tunnels were proposed by MCGM from Amar Mahal to Trombay reservoirs, Amar Mahal to Wad

    Sep 1, 2022

  • DFI
    Installation and Efficiency of Common Helical Pile Couplings

    By Jason Herron, Joseph Brown

    The common couplings for joining sections of helical piles with an outside diameter of 6.625 inches and 8.625 inches are square on square, flange to flange, external pipe sleeve, internal pipe sleeve,

    Jan 1, 2019

  • DFI
    Diaphragm Wall Technique Used In A Different Way Cutting Trenches Up To 823 Ft. (251 M) For An Exploration And Bulk Sampling Program

    By Stefan Schwank, Alexander Blatt, Franz-Werner Gerressen

    Diaphragm wall technique is usually used to install diaphragm walls, which are known as underground structural elements commonly used for retention systems and permanent foundation elements as well as

  • DFI
    Capacity of Hydraulically Jacked Piles

    By Howard A. Perko, Melinda J. Hummel

    "Hydraulically jacked piles, herein referred to as jacked piles, are commonly used for underpinning existing structures to arrest settlement or augment an existing foundation for higher loads. They co

    Jan 1, 2017

  • DFI
    Anchored Double-Tier Retaining Walls on Sloping Embankment

    By Chu E. Ho, Paul Napoli

    A new waterfront park was developed on Long Island in close proximity to the East River and Newtown Creek. The existing ground consisted of fill over soft organic clay, medium dense silty sand, glacia

    Jan 1, 2019

  • DFI
    Approximate Assessment Of Basement Wall Effects On Foundation Performance

    By Helen S. W. Chow, Harry G. Poulos

    Most modern buildings involve the construction of a basement, often of several levels, to maximize the floor area ratio. The basement walls are generally designed for excavation retention purposes onl

    Nov 1, 2022