Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Structural transformations of magnesium alloys during Thixomolding

    By F. Czerwinski

    Mechanically fragmented chips of an AZ91D magnesium alloy were transformed into a semisolid slurry within the Thixomolding® system. Microstructural analysis of a material at various processing stages

    Jan 1, 2004

  • CIM
    Economics of Mine Haul Road Construction

    By Bruce Regensburg

    As trucks become larger and larger, haul roads take on a more significant role in mining costs and economics. The School of Mining at the University of Alberta has compiled a design manual for haul ro

    May 1, 2001

  • CIM
    Mine Permit Surrender at Red Mountain Mines

    By Chris Carr

    This paper describes the process employed and the work undertaken to enable the surrender of the mine permit relating to the two tailings deposits at the abandoned Red Mountain Mine site near Rossland

    May 1, 2002

  • CIM
    Improving Site and Materials Handling Operations Through Autonomous Vehicle-Related Technologies

    By Ashley Tews

    In 2005, we automated a forklift-based Hot Metal Carrier to be capable of typical metal transfer operations around a smelter. The project was highly successful and the vehicle has demonstrated hundred

    Aug 1, 2013

  • CIM
    ISO Management Standard for Energy Management - WIIFM (What's In It For Metallurgy?)

    By A. Taylor, E. Thorn Corthay, R. Storey

    In response to requests from its stakeholders, the International Standards Organisation is engaged in development of an international standard for Energy Management Systems (EnMS) which will become "I

    Jan 1, 2010

  • CIM
    Formation of Nanocrystalline and Ultrafine-Grained Structures in Disk-Shaped Samples of Fe-0.15c and Interstitial-Free (If) Steels Produced by Ball Milling

    By A. Dolatmoradi

    Nanocrystalline structure formations produced by severe plastic deformation in Fe-0.15C with initial ferritic-pearlitic and IF steel with ferritic microstructures have been studied through microstruct

    Jan 1, 2010

  • CIM
    Fractured Bedrock Investigation by Using High-Resolution Borehole Images and the Distributed Temperature Sensing Technique

    By R. Charlier, G. Radioti, J. -P. Radu, S. Delvoie, F. Nguyen

    "In order to investigate the fracturing of the bedrock and its possible heterogeneous distribution in situ, four boreholes equipped with double-U geothermal pipes of 100 m long were installed on the c

    Jan 1, 2015

  • CIM
    A Simplified Approach for Evaluating Concrete Deterioration in Vertical Shaft Lining

    By G. Q. Zhou, H. C. Liang, X. D. Zhao

    "This study describes the strain behavior in vertical shaft lining (VSL) embedded in thick soil deposits and its application in assessment of concrete deterioration. The observed strain in VSL continu

    Jan 1, 2019

  • CIM
    Using Computer Software to Identify Ore and Waste in Alberta Oil Sands Deposits

    By Jr. Wilkinson

    Suncor Energy currently mines approximately nine hundred thousand tonnes of ore and waste per day at its open pit operations in the Athabasca Oilsands near Fort McMurray, Alberta. Modeling these depos

    Apr 1, 2005

  • CIM
    Lundin Eagle East Project - Mine Ventilation Update

    By Gobbs C., J. Lam

    "The Eagle East project, accessed from the existing and operating Eagle Mine in the Upper Peninsula of Michigan, is an underground base metal project currently in execution by Lundin. This paper will

    Jan 1, 2019

  • CIM
    Mining a Moving Orebody: Geotechnical Risk Management for a Kimberlite Pipe Longhole Stoping Operation Experiencing Large Vertical Displacements

    By Jeffrey Oke D.S.H. Oke, Craig J. Archibald, Anna P. Perry

    Underground mining at the Diavik Diamond Mine (Northwest Territories, Canada) commenced in 2003 and has targeted four kimberlite pipe orebodies. The A154 North (A154N) pipe was mined using longhole op

    May 2, 2026

  • CIM
    Bio-Inspired Burrowing Mechanism for Underground Locomotion Control

    By S. M. Moon

    Today, underground exploration is spotlighted as an infinitely developable area. For this purpose, many tunneling technologies were created. And until this very day, many techniques are being develope

    Aug 1, 2013

  • CIM
    OPSCAP Victor Project's Transition to Operations

    By Brian Rausch

    Agenda ?? Refresher: Victor Project Execution ?? Operations Capability roadmap: ? Operations staffing starter group: design participation ? Operations staffing build up for production start-up ?

    May 1, 2009

  • CIM
    Aggregate Resources of Southern Ontario

    By M. A. Vos

    "Aggregates are the low-cost mineral raw material of building construction. Large volumes of aggregate are consumed each year. The availability of aggregates in southern Ontario is discussed in the co

    Jan 1, 1972

  • CIM
    Experiences from an IREDES Prototype Project Production drilling with Atlas Copco Simba L6C Drill Rig at LKAB Kiruna mine

    By Mikael Ramström

    The IREDES Special Interest Group (SIG) for Drill rigs has been active since its inception at MineExpo 2000, in Las Vegas USA. The SIG for drill rigs is responsible for the development of a IREDES Dri

    May 1, 2003

  • CIM
    Orano Mining R&d And Innovation Portfolio And Deployment Methodology

    By Hervé Toubon, Matthieu Davrinche, Jim Corman, Mamane Bello Boubacar Kinassa, Pierre Amadieu

    Orano Mining maintains a significant level of Innovation and Development Research for its sites in Canada, Niger, Kazakhstan, Mongolia, and France. This effort is formalized within the six major thema

    Jan 1, 2020

  • CIM
    Process for Integrating Surface Drainage Constraints on Mine Planning

    By Les F. Sawatsky

    Surface drainage, particularly mine closure drainage, must be properly considered during all stages of mine planning because it presents constraints that are critical to economic mine operation, minim

    May 1, 2009

  • CIM
    Field Measurements of Radon in the Air of a Coal Mine in Southwestern Alberta

    By J. M. Wetherill

    "This paper presents the results of an investigation into the level of radon, as against the natural background, at the Vicary Creek coal mine in Alberta. The concentrations of radon and daughter prod

    Jan 1, 1968

  • CIM
    Difference Between the Concepts of a Disaster Investigation Robot and a Disaster Restration Robot

    By Kenichi Fujino

    Severe disasters have struck Japan in recent years. Following these disasters, construction robots have played important roles in investigation and restoration work in the disaster regions. To be appl

    Aug 1, 2013

  • CIM
    Study on Integration of Real-Time Atmospheric Monitoring System Data and MFIRE Simulation

    By L. Yuan, J. H. Rowland, R. A. Thomas, D. Bahrami, G. P. Cole

    "The past several decades have seen a steady increase in the use of atmospheric monitoring systems (AMS) in underground mines as sensor technology has advanced and costs for this technology have decre

    Jan 1, 2019