Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Only People PolluteBy E. R. Mitchell
When we grow up in an urban environment and choose to become a part of a way of life, it is sometimes difficult to appreciate the cost of this decision in terms of pollution. Explained in this article
Jan 1, 1971
-
Why Aren?t We Using More Thermal Coal in Canada? ? The Real ReasonsBy Roger K. M. Bellows
The last coal-fired power plant to be built in Canada came into operation in 1994. Since then, Canada?s electricity requirements have grown substantially but no new coal-burning plants have been built
May 1, 2001
-
Continuous Casting of Az31 Magnesium Plate via Horizontal Continuous Casting ProcessBy Bong Sun You
AZ31 magnesium plate of 300mm in width and 40mm in thickness was produced by horizontal continuous casting machine, and its microstructures were analyzed on the surface and in the plate interior. The
Jan 1, 2006
-
SAG and Ball Mill Circuit Layout and DesignBy L. Dufourm
This paper presents a review of plant layout considerations incorporated into recent designs of SAG/Ball mill circuits for two medium sized concentrators. The plant layouts presented and the design co
Jan 1, 2012
-
Present Situations and Key Technologies of Exploration and Development of Coalbed Methane in Huanglong Jurassic Coalfield of ChinaBy Du Xinfeng
The resource quantity of the low rank coalbed methane (CBM) accounts for 47% of the total resource quantity of CBM in China. Compared with the exploration and development of the high rank CBM in Qinsh
Aug 1, 2013
-
RUSAL: Implementing Lean For Aluminum IndustryBy A. A. Sizikov, V. A. Sizikova
Key parameters to consider for any producer: bring down production cost and lead time; Lean production as a tool to achieve maximum efficiency; How to implement lean principles: discontinuous vs. cont
Jan 1, 2006
-
Bent Beam Coupon Testing for the Investigation of Stress Corrosion Cracking in Rockbolts"Coupon testing has been used to investigate stress corrosion cracking (SCC) of rockbolts in a laboratory based experimental program. This program has focused on the use of ASTM G39 three- and four-po
Jan 1, 2015
-
Mine Ventilation Design using a Ventilation Improvement IndexBy Dong-kil Lee
A ventilation improvement index (VII) was developed in an effort to propose an optimal ventilation improvement measure for a designated mine. The index was designed to incorporate both ventilation eff
Aug 1, 2013
-
Thickened Tailings R & D Pilot Experience at Syncrude Canada Ltd.By Jonathan Matthews
Efficient and effective management of mine tailings is essential for continued successful development of Alberta?s vast oil sands resources. Syncrude Canada Ltd. continues to research novel tailings m
May 1, 2003
-
Ventilation on Demand ? The Impact of Sensors, Installation, Control Strategies, Commissioning and Advanced Controls PerformanceBy J. Janzen
The cost to supply ventilation may exceed 40% of the total mine energy cost for underground mines and is often higher for deeper mines. The goal of Ventilation-on-Demand (VOD) is to ensure that the re
Aug 1, 2013
-
Process Options for Copper and Gold Recovery from a Bulk Flotation Concentrate Containing PyriteBy C. W. Chao, M. Melashvili, F. Hilário
The processing of a bulk concentrate containing copper as chalcocite, enargite, bornite and chalcopyrite along with pyrite and precious metals of silver and gold was studied. A leaching study was unde
Jan 1, 2019
-
Recent Patterns of Nickel Use and Development in ChinaBy I. Kirman, B. Waters
World wide applications for nickel use will be summarized and examples of those uses given. Nickel products are critical to many important aspects of modern society. These products are just as importa
Jan 1, 2005
-
The Practice of Mining and Inclusive Wealth Development in Developing CountriesBy Frederick Bird
This paper is based upon a review of studies of mostly Canadian mining companies in Chile, northern Canada, Tanzania, Guatemala, Ghana, Sierra Leone, and the Democratic Republic of Congo. In spite of
Aug 1, 2013
-
Red Dog Mine, Alaska versus Quebrada Blanca Mine, Chile Is it that different to mine in the Arctic than on top of the Andes?By Alvaro Diaz
Introduction, who is Teck Red Dog and Quebrada Blanca Mines Uniqueness of environment Arctic versus High Altitude Conditions Logistical challenges People and Stakeholders Conclusions
May 1, 2013
-
In-Situ Stress Measurement at Shallow Depth in the Vicinity of the Epicenter Before and after the 2011 Tohoku-Oki EarthquakeBy K. Sakaguchi, T. Yokoyama
"In-situ rock stress measurement was carried out in the Kamaishi mine of Iwate Prefecture to quantify the variation of the shallow crustal stress field associated with the 2011 Tohoku-oki earthquake.
Jan 1, 2015
-
Suffield MineBy Gilles Carrière
"The Suffield mine is situated five miles southwest of the city of Sherbrooke, in the Eastern Townships of Quebec. lt is the property of Suffield Metals Corporation Limited, a wholly owned subsidiary
Jan 1, 1949
-
Design for SafetyBy Philip J. Bangerter, Chris Twigge-Molecey
Design for safety is critical to metallurgical plants, due to the inherently dangerous nature of their processes. Two significant areas of concern are: 1. preventing catastrophic process failures that
Jan 1, 2015
-
Enhanced Separation of Rare Earth ElementsBy A. Welty, T. Garn, K. Lyon, B. Jakovljevic, R. S. Herbst, M. Greenhalgh, Cytec Solvay Group
"Industrial rare earth separation processes utilize PC88A, a phosphonic acid ligand, for solvent extraction separations. The separation factors of the individual rare earths, the equipment requirement
Jan 1, 2016
-
Mining Construction Safety Documents for Safety Concept Structure Discovery using Formal Concept AnalysisBy H. H. Wang
Construction safety documents regulate significant safety actions and requirements by which construction workers or employees should abide in order to secure them from occupational hazard events. Ther
Aug 1, 2013
-
Overburden Mining Improvements at Suncor Energy?s Millennium MineBy Timothy D. Dreger
In the spring of 2009, Suncor Energy Inc. technical personnel saw an opportunity to improve planning 0and mining of overburden material in order to address aggressive construction goals and increased
May 1, 2011