Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Recycling of Metal-Coated Plastic-Parts from End-Of-Life-Vehicles with Biotechnological Methods

    By F. Logsch, H. Pempel, J. Markowski, P. Ay

    "Due to the European Directive 2000/53/EC on end-of-life-vehicles, from 2015 on more than 95% of car materials have to be recycled. In order to recycle the materials back into the economic cycle, it i

    Jan 1, 2016

  • CIM
    Innovation through Effective and Novel use of IT & BPI

    By Sean Dessureault

    Technological Revolution ?Information age ? brought about by: ?Low-cost processing, storage, information sharing ?Shared & integrated data ? Increasingly more sensors & data sources From data col

    May 1, 2006

  • CIM
    A Review and Update of the Grinding Circuit Performance at the Los Pelambres Concentrator, Chile

    By Gonzalo Bernstein, David G. Meadows, German Naranjo, Edgardo Tapia

    "During the last decade Antofagasta Minerals’ Los Pelambres Mine has dramatically increased its ore throughput following the fast initial phase ramp up through a series of planned incremental expansio

    Jan 1, 2012

  • CIM
    Characterization of Aluminium Alloy Sheets Accumulative Roll-Bonded at Different Temperatures

    By P. Homola, M. Karlík, M. Slámová

    "Aluminum sheets (AA1199, AA8006, and AA5754) were processed by accumulative roll-bonding (ARB) in the temperature range from 20 to 350°C. The microstructure of the sheets was characterized by means o

    Jan 1, 2018

  • CIM
    The Long-Term Stability of the Iron (III)-Arsenate Coprecipitate: Effects of the Transformation of 2-Line Ferrihydrite on the Immobilization of Arsenate

    By Yongfeng Jia, Shaofeng Wang, Danni Zhang

    Arsenic in mineral processing solutions and effluents is commonly removed and immobilized via iron(III)-arsenatecoprecipitation. The effect of re-crystallization of 2-line ferrihydrite on the long-ter

    Jan 1, 2014

  • CIM
    Current Challenges In PGM Flotation of South African Ores

    By B. D. H. Knights, M. A. W. Bryson

    Flotation of PGM ores, specifically UG-2, presents a number of technical challenges. These centre on the prevalence of chromite. Subject to over-grinding, chromite is primarily recovered to the flotat

    Jan 1, 2009

  • CIM
    Strength and Mechanism of Portland Cement Prepared from Stone Coal Vanadium Slag

    By P. Zhang, K. Liu, L. Ou

    "The strength and mechanism of Portland cement prepared from stone coal vanadium slag were studied in this paper. Initially, the slag was used as silicon raw materials to prepare clinker. By blending

    Jan 1, 2016

  • CIM
    Assessment of Ozone-Pre-Treatment of Sulfide Bearing Gold Ores to Prevent the Impact of Cyanicides

    By Michel Épiney, COREM, Mario Drapeau, Caroline Olsen, Claude Bolduc, Benoit Levasseur

    "Several metal sulfide minerals (such as copper, zinc and iron), generally abundant in precious metal-containing ores, are known to dissolve during the cyanidation process. These unwanted reactions co

    Jan 1, 2016

  • CIM
    Cretaceous clay and sand deposits in central Nova Scotia

    By RALPH R. STEA, John H. Fowler

    Clay, quartz sand and lignite deposits overlie Carboniferous rocks in central mainland Nova Scotia. Recent evidence indicates that these deposits are fairly extensive. Sands consist of almost pure ang

    Jan 1, 1984

  • CIM
    Practical Considerations for the Use of Microseismic Systems at Mining Operations

    By Ian S. Leslie

    Seismic monitoring systems for mining operations are being utilized more than ever before in the characterization of rock mass response to underground and open pit mining. This paper provides a review

    Jun 1, 2012

  • CIM
    Investigating Factors Influencing Fault-Slip in Seismically Active Structures

    By L. A. M. Castro

    As Canadian mines progress to greater depths, magnitudes of induced stresses increase, becoming high enough to cause rock mass damage and failure during excavation. In addition, depending on the orien

    May 1, 2009

  • CIM
    De-Leading a Copper Concentrate

    By Peter S. Jack

    "IntroductionTHE ORES treated at the concentrator of the Britannia Mining and Smelting Company, Limited, Britannia Beach, B.C., have always contained some lead, but it was not until 1950 that the comb

    Jan 1, 1953

  • CIM
    Design Fundamentals for Hydrometallurgy Pressure Vessel Refractory Linings

    By A. Koning, P. Lauzon

    Pressure hydrometallurgy operations require vessels to be lined with an impermeable membrane for corrosion protection and one or more courses of refractory or ceramic brick. Examples of unit operation

    Jan 1, 2004

  • CIM
    Development and Characterization of a Series of Mg-Sn-Ca Alloys

    By T. Abu Leil

    A new class of ternary Mg-Sn-Ca alloys is being developed to address the dual demands of corrosion and creep resistance at service temperatures. While tin has proven to enhance the corrosion resistanc

    Jan 1, 2006

  • CIM
    Arsenic Distribution in Smelting Via Teniente Converter

    By C. M. Acuna, M. Sherrington

    In high temperature processes thermodynamic equilibrium is assumed and therefore chemical potential of elements, among the condensed phases, have to be the same. In such situation impurities distribut

    Jan 1, 2007

  • CIM
    Particle Size Effect on Cracking Behavior in Bonded-Particle Model

    By X. -P. Zhang, L. N. Y. Wong

    Shale gas exploitation initiated in North America has rapidly extended worldwide. Hydraulic fracturing is an emerging field technique for stimulating the gas reservoir. The study of cracking processes

    Jan 1, 2015

  • CIM
    Paipote Smelter in a Continuos Process of Optimization

    By O. C. Rojas, J. Sanhueza, J. C. Vargas

    Empresa Nacional de Minería (ENAMI) is dedicated to the promotion of small and mid scale Chilean mining industry. Paipote, ENAMI Copper Smelter, processes a variety of mineral products as the result o

    Jan 1, 2007

  • CIM
    Value Added Aluminum Smelter System Integration: Alouette Phase II Experience

    By A. Noël, R. Lapierre, M. Provencher

    "Modem aluminum smelters are facing significant operating cost pressure. Key methods used by smelters to manage this pressure are automation and production-information systems to optimize processes, m

    Jan 1, 2006

  • CIM
    Treatment of Once Rejected Material – Investigating the Recovery of Cassiterite from Tailings Disposals Using Different Flotation Methods

    By M. Rudolph, T. Leißner, TU Bergakademie Freiberg, C. Mämpel, R. Möckel, M. Embrechts, T. Leistner

    Tin-mining activities have taken place in the region of the German Erzgebirge (Ore Mountains) for over hundreds of years up until 1991. For long times, gravity separation processes used to be the domi

    Jan 1, 2016

  • CIM
    A Continuous Improvement Model Linking Planning and Operations

    By Paul Clark

    Generation - Profile l 9,726 megawatts (MW) of capacity l 46,877 gigawatt hours (GWh) produced at an average plant availability of 88.4% l 47 facilities in four geographies: Canada; the U.S.; Mexic

    May 1, 2004