Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Introduction of and Experience Gained With Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia (5fc42dae-6b1c-469d-926f-1a8ca2654f54)

    On the 26th of June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19,000 m3 of saturated hydraulic fil

    May 1, 2007

  • CIM
    The Pogo project: flowsheet development and design

    By Eric Konigsmann

    "The Pogo project is located on the Goodpaster River, 38 miles north of Delta Junction in east central Alaska. Sumitomo Metal Mining and Teck Corporation are planning to develop a 2,500 ton per day un

    Jan 1, 2002

  • CIM
    Dragline monitoring, control, and navigation

    By J. Hansen

    "ABSTRACTThe paper addresses the application of automated monitoring, control, and navigation to improve dragline performance. SummaryImproving dragline performance in the Canadian coal mines is criti

    Jan 1, 2000

  • CIM
    SABC Circuit Energy Consumption Optimization

    By K. G. Markkola

    Since 2005, Compafifa Contractual Minera Candelaria (CCMC) has defined various strategies which aim to optimize the usage of the available energy in each of the SAG grinding circuit modules (SABC-A co

    Jan 1, 2007

  • CIM
    Coarse Gold Recovery Using Flotation in a Fluidized Bed

    By Eric Bain Wasmund, Lance Christodoulou, Julio Jairo Carmona Franco, María Fernanda Castillo, Jose Concha

    "A number of technologies are in practice for selectively removing coarse gold from conventional grinding circuits. These circuits are often designed so that the grinding mill output is size classifie

    Jan 1, 2015

  • CIM
    Fine Grinding, a Refresher

    By A. G. Doll

    "Many power-based grinding models exist, and most operators are familiar with Fred Bond's ""third theory"". Bond's model is most commonly used to describe primary and secondary grinding to product siz

    Jan 1, 2017

  • CIM
    Cable Shovel Simulation leading to A Novel Dipper Design

    By Ning Shi

    This paper suggests an alternative design approach for an innovative shovel dipper, for use in ground conditions where cutting of virgin ground rather than scooping of blasted material is required. No

    May 1, 2004

  • CIM
    Electric LHD operation at Inco Limited, Ontario Division

    By M. E. Sirkka

    "INTRODUCTIONInco Ltd. has ten operating mines in the Sudbury district. Over the last ten years mining methods have changed at Inco with special emphasis on the introduction of bulk mining replacing c

    Jan 1, 1989

  • CIM
    General Geology of the Chibougamau Region

    By G. O. Allard, A. Gobeil

    The Chibougamau area is the eastern segment of the MatagamiChibougamau greenstone belt. The Archean rocks of the area consist of two mafic-to-felsic volcanic cycles ( Roy Group) overlain by a sediment

    Jan 1, 1984

  • CIM
    Stepped Frequency GPR Field Trials for Determining the Ideal Frequency Bandwidth for Use in Potash Mines

    By W. Greg Maybee

    Separations, which form along stratigraphic boundaries in the roofs of potash mines, pose a serious safety concern. If these separations go undetected they can lead to falls of ground. The current met

    May 1, 2004

  • CIM
    Supergene Mineralization at the Kori Kollo Gold Mine, Bolivia (5a50eab3-2567-48d0-8c87-7819113638f7)

    By C. M. Clapperton, K. E. Darke, A. J. Boyce, C. M. Rice, S. D. Redwood

    "The Kori Kollo gold deposit is hosted by a c.15 Ma sericitized dacite stock in the LaJoya district on the Bolivian Altiplano. The mineralization is of the Bolivian polymetallic vein(BPV) type, with a

    Jan 1, 1997

  • CIM
    Supergene Mineralization at the Kori Kollo Gold Mine, Bolivia

    By C. M. Clapperton, K. E. Darke, A. J. Boyce, C. M. Rice, S. D. Redwood

    "Abstract - The Kori Kollo gold deposit is hosted by a c.15 Ma sericitized dacite stock in the La Joya district on the Bolivian Altiplano. The mineralization is of the Bolivian polymetallic vein (BPV)

    Jan 1, 1997

  • CIM
    Rabbit Lake project - milling and metallurgy

    By w. w. Milde

    "Since its startup in 1975, the Rabbit Lake mill has been modified (0 process both increased tonnage and higher grade ore. Ore initially came from the Rabbit Lake pit . In 1985, a major mill expansion

    Jan 1, 1989

  • CIM
    Research into high density backfill placement methods by the Ontario Division of Inco Limited

    By B. Goard

    "IntroductionCemented backfill has been placed underground in slurry form in Inco Limited's Ontario Division mines since the early 196Os. The slurry was traditionally mixed on surface at between

    Jan 1, 1987

  • CIM
    Flotation Improvements in the Luzenac Penhorwood Talc Concentrator

    By Ross Byron, Ken Roberts

    "During the fall of 2001 a program was initiated to determine the feasibility of improving the metallurgy in the flotation circuit at the Penhorwood Talc Concentrator located near Timmins, Ontario. Be

    Jan 1, 2004

  • CIM
    Flotation Kinetic Studies -Going from Laboratory to the Plant

    By Richard Klimpel

    "Over the last 15 years, there has been a number of plant scale sulfide mineral flotation tests organized by this author specifically aimed at understanding how flotation rate varies with reagent type

    Jan 1, 1997

  • CIM
    Terraflow: A Cost-effective Alternative Binderin Backfill Application

    By Ike Isagon

    Outline 1.Background Sudbury Backfill Operations 2.Alternative Binder 3.Alternative Binder Trial Process Flow Diagram ?Laboratory Results ?Plant Trial ?Final Evaluation and Approval ?Manageme

    Nov 1, 2011

  • CIM
    Lithological and Geochemical Features of Igneous and Sedimentary Rocks at the Omai Gold Mine, Guyana, South America

    By Luc Harnois, Gabriel Voicu, Marc Bardoux, Robert Crépeau

    "Abstract-Detailed petrographical and geochemical studies have been carried out on the igneous and sedimentary rocks in the Omai area, part of the Paleoproterozoic Barama-Mazaruni greenstone belt, Guy

    Jan 1, 1997

  • CIM
    Lithological and Geochemical Features of Igneous and Sedimentary Rocks at the Omai Gold Mine, Guyana, South America (7a331fd6-1548-475b-975d-314442f03c89)

    By Gabriel Voicu, Harnois Luc, Marc Bardoux, Robert Crépeau

    "Detailed petrographical and geochemical studies have been carried out on the igneous and sedimentary rocks in the Omai area, part of the Paleoproterozoic Barama-Mazaruni greenstonebelt, Guyana. The s

    Jan 1, 1997

  • CIM
    Low PH Trial in the Ernest Henry Mining Copper Rougher Flotation Circuit (db4a4353-e70f-4fb2-9b3d-7daf6f017863)

    "The Ernest Henry Mining (EHM) ore body is an iron oxide copper gold deposit with an average grade of 1.1 percent copper, 0.5 g/tonne gold and 22 percent magnetite. At the end of 2009, EHM converted t

    Jan 1, 2014